Jump to content
 
  • entries
    58
  • comments
    24
  • views
    8,416

About this blog

Started in 2004, this layout was originally an end to end with a run-round loop and a bay platform. It now forms part of double track layout. I built it in the early days when I hadn't really taken into account moving it about so its 2m long and about 630mm wide. However it has been moved about 5 times from house to house. It started as an analog layout and then was converted to DCC, then lots of wires for everything were added but in 2020 I discovered MERG and CBUS so its be re-wired again which has simplfied the underboard somewhat. The original layout consists of baseboard 1. But following another move I am now adding about 12 new baseboards to it plus a rear upper deck

 

Layout is in an insulated loft ontop of kitchen base units for storage.

 

Its not prototypical but wouldn't look out of place for a somewhere place for somewhere in the GWR / Midland territory. The station on baseboard 1 does have Great Central influences as is scratchbuilt. I like running GWR/ LMS / LNER and BR Standard steam locomotives, plus early diesels so its the early 1960s on the lower deck. The top deck is intended to be 1960s to 1990s but will retain semaphore signalling. It could also be a double track heritage railway......

Entries in this blog

Back to the LCB (part 3)

I am about 2 baseboard modules away from the first turnout on the top deck of the layout. I want to use servo motors to power them and had purchased a CANMIO from MERG which I was yet to build up and figure out how it worked.   I decided to therefore spend several afternoons in the Christmas / New Year Holiday setting myself the task of building it and programming it.   Got it all built and tested no problem and then had an issue with the installed firmware so installed a dif

MattB

MattB in General

×
×
  • Create New...