Bristol Barrow Road - Templot & Trackwork 2
I have now completed most of the trackwork on the existing boards with only the South Exit turnout to finish the second phase of templot. The latest build consists of 8 turnouts, a Double Slip, 3 Way turnout and a catch point. Phase 3 will be the 2 new boards - to be constructed - one at each end of the layout which will form the scenic breaks. One will be Lawrence Hill Junction itself, with the road overbridge and the other Days Road Bridge at the rear of the shed.
Lawrence Hill Junction signal box is now positioned on the layout - it is still removable - and I have constructed a model of the timber framed earth bank which protects the rear of the signal box - the surface has yet to be detailed.
Here are a few photos:-
- 15
9 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now