Jump to content
 

modelman14

Members
  • Posts

    176
  • Joined

  • Last visited

Everything posted by modelman14

  1. Amazing how a topic can drift off topic... I appreciate the replys here,but back to my original post,the layout I have is currently being retired to the loft for storage,my main concern was if the locos will be ok up there until building work starts, probably next year,then I will have a designated room as part of the current property. I have read and heard stories of bust drive cogs due to heat. The loft space will not be getting fully converted,as it is it is good for storage,apart from the temperature issue. Plenty of replies here indicate that they will cope with the temperature fluctuations,the original post was directed at this point,not at full loft conversions. Anyhow,thanks for all the replies,it looks like my collection will be stored in the loft for now and I definitely won't be converting it as we will have another 2/3 rooms added to the property next year. Thanks.
  2. Aye,the depot foreman,he's keeping an eye on it though..
  3. Yeah,I am aware of expansion of track,my main concern was the internals of the locos handling the temp fluctuations...the layout will only be stored until building work on the 2 extra rooms comences.,but as I said that could be a while with covid.
  4. The layout is 90% finished,I'm in a bungalow now,so until we extend,which is now on hold with the covid situation,the only place is the loft, hopefully only 12-24 months until we start groundworks. Selling the layout is still an option...
  5. Morning all. So,I've recently moved house and unfortunately lost my designated modelling room and it looks like I may have to retire my layout to the loft. I'm just wondering if my Heljan and Dapol locos will cope with the summer heat and winter cold up there in the loft. The loft will be boarded out to a certain degree,but it will still warm up and be cool in winter. I have heard stories of the Heljan drive cogs not coping with heat and subsequently splitting. I would prefer everything in a propper room,but at the moment it is not going to happen. Thanks for any advice folks...
  6. Good evening. Back in February we sold our house and the layout I was working on went into storage, hopefully for a month or so as solicitor's did there thing. Then some virus shut the world down,the layout is still in storage and we are still in the house we sold. As it has been so long I thought I'd post a piccy on here to remind me of where I was with the layout.
  7. Update time,have spent a good few hours on the layout recently,it's really starting to come together......at least I think so..
  8. Just a couple of pics of 60037 and 37180 stabled on the layout
  9. Now that the ballast has been laid I've weathered it and started adding a scenic break to the fiddle yard. I've just realised that as I was using different brick sheets the courses of brick don't line up all the way along the joins on the corners of the bridge,think I'll bin them and start again,or disguise the join with something...
  10. Good morning. So,it's been a while since I posted here,but as there has been progress of late I will give a little update. Currently I'm painting the rails and chairs,laying ballast and airbrushing the permanent way to represent a very grimy 90's ish stabling/fueling point. These pics are prior to the airbrush coming out. I'll update again later when I take a couple of pics of the airbrushed trackbed.
  11. admiles The transfers are from Railtec transfers.
  12. These OAA's from Heljan are a popular weathering subject of late.Heres my take on a used OAA. I'll probably chuck some used ballast and a couple of sleepers in it and maybe an oil drum or two to represent a general junk storage vehicle. Looks good with the 08.
  13. All. Recently got round to finishing the MM1 models ex JLTRT FNA Nuclear flask. But of a mission decal wise as every FNA seems to have different text positioning. A very good kit, especially for beginners,this is the first kit of this type I have built and painted. Thanks to Laurie as well for his support. Unfortunately I can't add any more images due to file size,but this image should give a good idea of the finished item. Modelman.
  14. Now that's some very impressive modeling.
  15. That's all the track down, electrics in,panel finished and point motors and smartfrogs working. Next will be painting the track,chairs and sleepers before airbrushing it.... Couple of arty shots Hoping to have it complete by the back end of the year....
  16. THANKS NARROW PLANET. Got the plates before Christmas,but only got round to fitting them,slight weathering to match the loco and I think they are spot on..NP made them slightly larger at my request to give a closer match to the real thing.. Another loco complete.
×
×
  • Create New...