Jump to content
 

Recommended Posts

I am thinking of scenery near the signal box, the idea is to have a embankment with trees on it so will be quite simple, the alternative is to have a set of low relief factory's, I am liking the greenery the most.

1625130963_rm_scenery(2).JPG.0300e8963be82e908b9b999d90088826.JPG

655073773_rm_scenery(1).JPG.f5ff350659ca871955fa9e1527eacb6b.JPG

  • Like 4
Link to post
Share on other sites

A video again with a pair of 20s, a 90, two 150`s and two 47s

The fiddle yard is getting bigger next weekend, currently its 6 roads, It will be 8 roads when I`m done, hopefully with point motors added to the far end ( it could even be done through the week depending on the daughters homework for the GCSE`s ).

Oh yes, the video...

 

  • Like 3
Link to post
Share on other sites

Just added the extra two roads for Mulberry Junction bringing the fiddle yard from six lines to eight, four on the up, and four on the down.

I also used a shortened MGR rake to check if there would be derailments, If anything were to come off the rails it would be them old HAA`s

rm_DSCN1200.JPG.a02b1020d91c638047a5b64d8443bbd5.JPG

rm_DSCN1201.JPG.ff6657f4b68a36c02f21f23870944c7c.JPG

  • Like 1
Link to post
Share on other sites

  • 2 weeks later...

The Hornby 7 car APT came yesterday, I unboxed it today and gave it a test run, I need to put decoders in the driving trailers, at the moment it just has one in the power car.

I`m not so keen on the pantograph.

 

The set on youtube, and photos bellow

 

 

 783354495_rm_APT(1).JPG.a8e53a86e1f226d69142df1158bb5ecd.JPG

 

2048591919_rm_APT(4).JPG.d30d2b669654b0383aa5cdd056330907.JPG

 

256559687_rm_APT(5).JPG.7b29e93426a70062fd520a93eaa92b0b.JPG

 

 

  • Like 4
Link to post
Share on other sites

I have decided to re do the ballasting,  before it goes down again I am going to take a couple of inches away on the curve behind the depot, ( the track is close to a part of a frame for my roof ) to get continuity with the scenery a little better with the look of the layout overall hopefully.

Link to post
Share on other sites

  • 2 weeks later...

Well the ballast went into the vacuum cleaner ( to be re used ), I have weathered the track and sprayed the bases of the fuel unloading area, and the fueling point too

 

567093894_rm_Depotarea(2).JPG.a72dae0e122c0e697171480980750d4c.JPG

 

 

63268455_rm_Depotarea(3).JPG.e41cba539d75906aa19667cdde784352.JPG

 

 

2058560689_rm_Depotarea(4).JPG.5e754430f258809d1abdbdd2136dd807.JPG

 

382582858_rm_Trackweathering(7).JPG.04e396f14ea822b0bf73bb8f9fbacb0b.JPG

 

I have also done a video on youtube

 

 

 

  • Like 3
Link to post
Share on other sites

  • 3 weeks later...
  • 4 weeks later...

The ballasting is re done in a brown shade ( was grey ) which I like, It isn't stuck down yet but Its a bank holiday weekend so I might do that on Monday next week.

I also bought a Silverfox class 89 model 😀 ( can be seen on the platform )

 

The grey version ballast

 

1366232206_rm_Mulberrystationballasting.JPG.71ea9dcbc9fe12ed30c00e904848c427.JPG

 

The brown ballast

1606629352_rm_MulberryJunction(2).JPG.8747dac2a75458141fa1efa39e095ca2.JPG 

1430424336_rm_MulberryJunction(3).JPG.74edac12c108e20dbab2369de9d4b258.JPG

 

1185909502_rm_MulberryJunction(1).JPG.aec58733091aa82e7bacdbcd6fb8a751.JPG

 

 

  • Like 2
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...