Jump to content
Users will currently see a stripped down version of the site until an advertising issue is fixed. If you are seeing any suspect adverts please go to the bottom of the page and click on Themes and select IPS Default. ×
RMweb
 

'Cambrian Street'


BobM

Recommended Posts

1 hour ago, BobM said:


Cheers Stationmaster, much appreciated, going to leave it at three as per original intention.

Regards always 

Bob

Hi

Found this image (referenced as) of Godfrey Road, Newport, and it certainly looks interesting with food for thought.

Would I be correct in assuming that apart from the ballasted track, the area would have a concrete pad surface?

Regards always 

Bob

 

1465772B-070D-447B-973E-D21AB7D05B4F.jpeg.3e33cda57b59447c79e98f5da20dd96e.jpeg

Edited by BobM
  • Like 2
Link to comment
Share on other sites

  • RMweb Gold

Maybe is the possible answer.  Godfrey Road has undergone more changes of use than most places on the railway.  starting off with a broad gauge engine shed plus some sidings (possibly for coaching stock maybe some for departmental use; changing to carriage sidings plus some departmental sidings; vchanging to a DMU fuel and inspection site (2 roads plus DMU stabling roads plus some departmental sidings; changing to partly disused plus departmental sidings after the DMUS Western Valleys services finished; changing to a loco fuel and inspection point using the former DMU facility plus some departmental sidings; changing to whatever is left there now (some departmental sdings?).t

 

Iver the years pits have come and gone, newer longer pits have come, and have probably gom ne.  Concrete worlking areas have come and gone but some might have survived.  Much of the ground will just be very well compacted stuff left over from years of changing use and there might be some patches or strips of concrete there.

 

But a question - why do you need to know?  There might be a far simpler way of settling what you have in mind for -say - your diesel stabling point.

  • Informative/Useful 1
  • Friendly/supportive 1
Link to comment
Share on other sites

Evening all,

Have settled on one issue, that being the track layout I intend to use, here temporarily set out with spare track.

 

Also the tunnel portal…..

 

19EC3AED-820F-4E01-B67B-BBD59E0840FF.jpeg.1ed91c869ec7399e7d9525175e4892f2.jpeg
 

316009CD-C7C2-4C09-84C2-C5727138C98A.jpeg.7f2ae2300639b1f14cceff5f90492b32.jpeg

 

081899E7-1B2A-44F2-858B-E78B56C6D3A4.jpeg.4f2ef23b1aeb6244717e46a6ec24382a.jpeg

 

This is, I believe the best way forward.

 

Regards always 

Bob

 

Edited by BobM
  • Like 8
Link to comment
Share on other sites

Afternoon all,

I have made a slight variation to the orientation of the left siding. Rather than making this parallel with the central and right hand sidings this will now go straight ahead, to give just a smidgen of further length. Will sleep on it before laying and wiring up?

The resultant triangle of ground created, could with a bit of advice and further suggestions from your good selves be used for suitable buildings or facilities for a period diesel siding?

 

F07D7C16-283D-49C0-BC75-ABD0952FAD02.jpeg.672a5da9496f18c97c79ff89678fef1f.jpeg

 

633E6D20-C56D-4C1D-8132-D1ACA18499A9.jpeg.19310faddc4cb8a3296c8f4bb319b984.jpeg

 

8F6520B1-1ABA-4106-9586-12039150DC40.jpeg.ee26da8c5e6cb44cceb11bb8b0065d67.jpeg
 

6AC392C6-303A-4ED5-8151-5886248F66EE.jpeg.c35ce5658f6f95c9e359be49c02a4bcf.jpeg
 

Regards always

Bob

Edited by BobM
  • Like 6
Link to comment
Share on other sites

Afternoon all,

The track for the intended diesel sidings are down and held in position at this stage with just one pin for each, will undertake the required wiring.

6412864E-A812-4736-9C59-B702708AC78D.jpeg.cc793313cf825017c272d087772d7542.jpeg
 

Regards always

Bob

  • Like 3
Link to comment
Share on other sites

21 minutes ago, lezz01 said:

Where are you putting the refuelling point Bob?

Regards Lez.


Hi

Hoping to have the tanks etc in the triangle, looking through images to replicate something suitable. Always open to suggestions and advice.

The intention is to have the refuelling lines on the diagonal siding.

Hope all’s well with you, personally been up and down lately but ‘getting there’!

Regards always

Bob

Edited by BobM
Link to comment
Share on other sites

Hi

Thinking of replicating something similar to this?

Perhaps with additional tanks in the triangle and fuel lines to serve both the adjacent sidings?

Regards

Bob

208C7ED0-8C86-48C1-8BAA-CB5689E77DBE.jpeg.f70cf3b5c9b7f7fac4df6e37b2c4470d.jpeg

  • Like 2
Link to comment
Share on other sites

  • RMweb Gold

I do wonder if the site is a bit too small for fuel tanks and a full & inspection location - which would in any case need a pit on the f&I siding.  F&I facilities tended to be put at locations where they would serve lots of trains (i.e. DMUs) being stabled overnight with locos generally being dealt with somewhere completely dfferent and normally with no need to to fuel at outbased locations like this.  In the early post steam age on the WR the DMU fav cilities tended to be provided at formaer carriage sidings (there were exceptions but not many) while locos were normally stabled at the site of the former steam shed - or in it if it had survived/until it was finally demolished.

 

Really all you need is some srt of staff accommodation and possibly a store if there is a Fitter based there (unusual but there might be a Carriage & wahon Examiner. 

  • Friendly/supportive 1
Link to comment
Share on other sites

1 minute ago, The Stationmaster said:

I do wonder if the site is a bit too small for fuel tanks and a full & inspection location - which would in any case need a pit on the f&I siding.  F&I facilities tended to be put at locations where they would serve lots of trains (i.e. DMUs) being stabled overnight with locos generally being dealt with somewhere completely dfferent and normally with no need to to fuel at outbased locations like this.  In the early post steam age on the WR the DMU fav cilities tended to be provided at formaer carriage sidings (there were exceptions but not many) while locos were normally stabled at the site of the former steam shed - or in it if it had survived/until it was finally demolished.

 

Really all you need is some srt of staff accommodation and possibly a store if there is a Fitter based there (unusual but there might be a Carriage & wahon Examiner. 

Hi

Thank you you are so kind, I don’t want to create something which is not required or in keeping with the area available. I am quite happy just to have sidings / accommodation/ storage buildings to provide interest, as my modelling skills/ talents are quite limited.

Regards

Bob

  • Like 1
  • Friendly/supportive 1
Link to comment
Share on other sites

On 11/02/2023 at 15:43, BobM said:

Afternoon all,

The track for the intended diesel sidings are down and held in position at this stage with just one pin for each, will undertake the required wiring.

6412864E-A812-4736-9C59-B702708AC78D.jpeg.cc793313cf825017c272d087772d7542.jpeg
 

Regards always

Bob

Afternoon all,

Having taken onboard the kind comments posted relating to the suitability of the available space for a proportionally sized diesel depot, I am reevaluating the whole concept. I would appreciate suggestions and comments on alternatives, even if they just become additional sidings?

Regards always

Bob

  • Like 1
Link to comment
Share on other sites

  • RMweb Gold
5 minutes ago, BobM said:

Afternoon all,

Having taken onboard the kind comments posted relating to the suitability of the available space for a proportionally sized diesel depot, I am reevaluating the whole concept. I would appreciate suggestions and comments on alternatives, even if they just become additional sidings?

Regards always

Bob

Bob,

 

I think the basic idea of having them as diesel stabling sidings is perfectly sound.  But that means there would/should be a back story about what they were before they took on that role - perhaps something like my notes about what happened to Godfrey Road over the years.  Such a back story might imply the conversion of old buildings to suit what the new purpose needed - maybe it had been additional freight handling space or carriage sifdings or even old sidings taken into departmental use and they had been ejected from them.

 

Get the back story Bob and then you'll be your own similarly named uncle.

  • Like 3
  • Friendly/supportive 1
Link to comment
Share on other sites

  • RMweb Gold

Just a random thought (and probably nonsense) but...

Suppose you kept all three sidings parallel to each other and assume they are much longer than they actually are, and have an overbridge at the end with mirrors underneath instead of the buffer stops?

  • Like 3
  • Interesting/Thought-provoking 1
  • Friendly/supportive 1
Link to comment
Share on other sites

16 minutes ago, GWR57xx said:

Just a random thought (and probably nonsense) but...

Suppose you kept all three sidings parallel to each other and assume they are much longer than they actually are, and have an overbridge at the end with mirrors underneath instead of the buffer stops?

Hi

Saying that had given me an idea, as there is room to cut an hole in the scenic wall and extend the sidings towards the wall underneath such a bridge?

Regards

Bob

  • Craftsmanship/clever 1
  • Friendly/supportive 1
Link to comment
Share on other sites

4 hours ago, BobM said:

Hi

Saying that had given me an idea, as there is room to cut an hole in the scenic wall and extend the sidings towards the wall underneath such a bridge?

Regards

Bob

Hi

A provisional look at extending the sidings would give about an extra 7 inches at maximum.

Regards always

Bob

Edited by BobM
  • Like 1
Link to comment
Share on other sites

  • RMweb Gold
44 minutes ago, BobM said:

Hi

A provisional look at extending the sidings would give about an extra 7 inches at maximum.

Regards always

Bob


Does that extra 7” mean the difference between having (say) two locos per siding as opposed to one without?

Or a two car dmu rather than a single car?

If so, it’s probably worth doing.

And if you leave the buffers off it would give the impression that the sidings continue off-stage.

 

  • Friendly/supportive 1
Link to comment
Share on other sites

54 minutes ago, GWR57xx said:


Does that extra 7” mean the difference between having (say) two locos per siding as opposed to one without?

Or a two car dmu rather than a single car?

If so, it’s probably worth doing.

And if you leave the buffers off it would give the impression that the sidings continue off-stage.

 

 

If you’ll pardon the expression ‘I’ll give you my dimensions later’ !

Regards

Bob

Link to comment
Share on other sites

Evening…….

As it stands at the moment the diagonal siding is the longest, being useable for 20” from the fouling point to the buffer stop.

 

The parallel sidings have a useable length of 17” at present, if lengthened by the removal of the edge board this becomes some 25” without buffers.

 

Regards always 

Bob

  • Like 1
  • Interesting/Thought-provoking 1
Link to comment
Share on other sites

Evening all,

I think what I am going to do is to remove the scenic screen and see what transpires regarding extending the sidings using the analogy  ‘ nothing ventured’ etc as a starting point?

Regards always

Bob

Link to comment
Share on other sites

Evening,

Just mapping out a possibility here.

If the hatched area is removed as a potential over bridge, the now two parallel sidings can pas beneath and be extended by some 7 inches. Have to muse whether the gain is sufficient for the changes, comments as always appreciated.

9FC070BB-DD59-46F9-AD8A-D9AD4566C361.jpeg.c85fe6f8b394e3a9c344f731eeb4fd73.jpeg

 

Regards always

Bob

  • Like 1
Link to comment
Share on other sites

  • RMweb Gold

To me the sidings look better all being parallel.

The corner looks a bit difficult to access, so maybe not worth adding extra length and just go for the illusion of the sidings continuing into the distance under some kind of view blocker - trompe l’oeil.

 

  • Friendly/supportive 1
Link to comment
Share on other sites

Afternoon everyone,

An attempt has been made to add the scenic few inches this afternoon.

As this is purely a scenic addition it is not going to carry any substantial weight at all.

The intention is to have a road bridge inset into the gap within the scenic board with embankment either side for effect?

00AEC31A-23D6-435D-90A6-FACADFE0FC86.jpeg.a67949811556446390854d1c2ac59287.jpeg
 

Regards always 

Bob

  • Like 4
Link to comment
Share on other sites

Evening,

Just a quick update and muse on intentions, a bridge will firm interest hopefully to tie in both the tunnel portal and the inference of some distant facility or destination beyond where the (non operational) tracks disappear?

Have set the position for this bridge slightly ahead, do it casts a shadow upon the stock beneath for effect.

 

Regards always 

Bob


5675BE47-26C0-49A6-B383-3A69894FFEF2.jpeg.1d893a274323a6d98f4677647a980774.jpeg

 

  • Like 5
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...