Jump to content
 

Middleton Central


M.R.P.G
 Share

Recommended Posts

Station building construction by Simon. Middleton Central.7641A828-1BF6-4499-AA28-55DA241CA6E5.jpeg.306edbead7c11856503f330259ffb96e.jpeg

 

1A9147B9-D7CF-4032-A4CC-6051C154047C.jpeg.e827c24c681cda19dcb0177f84c40b88.jpeg
 
And Dave’s Station Hotel is progressing well 

1CDC7FC3-D85E-45DF-88C4-3F8314646512.jpeg.ccf709fcbb04677295ed09071a4ef4ec.jpeg

While I’m constructing the bridge side wall, with the girder nearly completed.

3BD36519-43E2-4A6A-8AA8-59A524699993.jpeg.5ddcdb86bb7bfe64cdba6527fb1d5c1d.jpeg


Mark is busy with the scrap yard details, and greenery scenics.

Thanks for looking, more updates soon, cheers Shaun.

Edited by M.R.P.G
  • Like 6
Link to post
Share on other sites

Now the scenery is starting to progress we decided the layout needed a safe storage space. So here’s what we have made. 
Thanks to Dave for supplying the “Free” timber.
(Several cups of tea and biscuits was consumed while constructing the storage frame.) 

Its not finished yet, it’s going to have a top shelf and cover. 

8C432671-93C4-4C02-ABEF-4958DE5E702F.jpeg.6a51733e83b177af277eab0943ebc9d6.jpeg

 

Edited by M.R.P.G
  • Like 2
Link to post
Share on other sites

29.8.22

Dave has been working on the Station Ho-el , and Simon has completed the Station Building, and planning a low relief building for the corner.

 I’m starting on the station parcels / mail depot building. 

74507A85-8F51-45EA-AE42-DA381839529B.jpeg.7d091435ad1dd992aba0ac3b9a013da3.jpeg


Station Ho-el.  Im not sure this will be a 4 star hotel lol.1A258BAD-01E4-4C32-96B9-B6298D0D0EFD.jpeg.4b04edd593ac1fd36759b37b4b33fb53.jpeg
 

Mark is getting on with the greenery and has finished the concrete section area. 

C0D416BA-CCB5-42AB-B284-59A06F66C737.jpeg.e090569b96665b3f14c127e718293f87.jpeg
Thanks for looking Shaun . 
M.R.P.G 

Edited by M.R.P.G
  • Like 8
Link to post
Share on other sites

5.9.22. More progress with the Station Hotel, Dave has added extra details and painted grey. 
Meanwhile underneath the road bridge I’ve been adding a shutter door which is the entrance for road vehicles to access the platform for the motor rail service. Dave has made a ramp for the end of the platform where the CCT is parked. 670F1795-9B86-4F01-A8C2-BB6AB4A7DA31.jpeg.16a8a2ba7d82626e775bee8b0740a1e0.jpeg

Simon has nearly completed the chippy and clothes shop . 
6A7EB860-E8BE-44E2-9C09-3124842039E8.jpeg.7198af85bab20762d0f22f45445048d6.jpeg

Cheers Shaun. 
 

M.R.P.G

 

  • Like 7
Link to post
Share on other sites

12.9.22 
Club starts with subs (biscuits) and a cuppa tea.
There’s some sheets of Plasticard under those biscuits, so we do intend on making some progress. 

D050A27B-17FE-4111-9B52-FCF71A101432.jpeg.4412b854beca0a01ba5fe92848c47392.jpeg
 
Dave has put a roof on the Station Hotel and Simon has started a low relief building to fit behind the Station building, and also a kit phone box. 
 

C957EF76-0128-4A64-B72F-DC7C187B566B.jpeg.d7261a8f13747b0ff0b364b1d7c5f4c5.jpeg

Edited by M.R.P.G
  • Like 5
Link to post
Share on other sites

12.9.22

Cardboard mock up for a low relief modern warehouse building. 

1848864D-563C-496F-90C9-54DD42CDF8C4.jpeg.03f8d1b96639c96bd9b610351e1f1dc7.jpeg

 

Paul has started to build the modern warehouse on the right.
Dave has been detailing a CCT van and painting white lines on the platform edges. While I’m progressing with the Parcels / Mail building, adding the windows etc . 
6AD348E1-C4CF-4936-ACE7-B5112ECFF143.jpeg.ffdf57783ce081d4bd702b2e3f2d7fc0.jpeg

 

4F19C902-428D-4911-A11B-3C4E2FBFB055.jpeg.50e2ffaedae7a451c5a6564df9ee2d7b.jpeg

More updates next Monday 

Cheers Shaun. 
 

M.R.P.G

  • Like 9
Link to post
Share on other sites

19.9.22 An earlier club meeting so we could get the layout storage frame painted. 
C0D3646C-988E-4BBE-8668-DEFF37A17EE3.jpeg.f8b0053ef5ca5c93c7a73af0ad74f149.jpeg

 

152D91A2-4FE8-4D8D-97BE-D00C082C67DB.jpeg.ea23d7e66f23472e65a5e1d3d7d88cae.jpeg

There’s still some more work to be done. Needs a board on top for storage boxes. And will soon have a plastic sheet cover fastened to it. 

Link to post
Share on other sites

19.9.22 More progress on the layout with construction of a footbridge to hide the fiddle yard entrances. 
CDBAF79D-9787-4F5D-A1F1-C1377567C5C2.jpeg.d39abc470d49f2481e1cbbbf482bd7eb.jpeg

With this footbridge being on the edge of the baseboard, it has to be a sturdy construction, so we have used some steel strip, screwed to the front of the baseboard and bent to shape, then screwed to wooden blocks for bridge piers.

491E22D6-6543-495F-A017-09A4CAF1B2A7.jpeg.c1f4ed22d9b0cf6328738ee680ffdb4b.jpeg

Because of the different levels of track work, we decided to make the bridge multi level which will make it a more interesting structure. 

  • Like 2
Link to post
Share on other sites

19.9.22 View from front of the layout showing the steel strip screwed into the split hinge. 

And towards the backscene, where the footbridge will lead to the low relief building, which is still under construction. 7000CD7C-1F0E-42F2-AC7B-99417BABA3BF.jpeg.60eb92434fbc538327bd606d5604b5ba.jpeg
The scenery is really coming along now with the greenery nearly finished. 
D52F9E7D-8681-4EFA-B869-3B4F56066565.jpeg.f2534f4dabe8a72143e4ba19feedf309.jpeg
 

  • Like 6
Link to post
Share on other sites

27.9.22 

More construction work on the footbridge. Dave has added wooden planking to the walkway, and covering the wooden supports with embossed brick plasticard. 
99B7F65B-1DC9-4BA3-8183-74CA4070AA94.jpeg.649658a3d58d9e64c48bcbed9e0b905e.jpeg

 A stairway added for access to the signal box pathway, and steps added for the different levels. 
C5A23BDE-6057-4F69-B8E5-C60F4A493262.jpeg.70197b34e5b60f944e1ac8789d8144cc.jpeg

 

 

  • Like 7
Link to post
Share on other sites

  • 2 months later...

19.12.22 . It’s been a while since we set Middleton Central up and had a run session. After a good track clean all was ok.  More progress with the parcels building with roof added. 
DAA1E5A7-5DCD-4A34-8E6D-51D194058654.jpeg.a347950ff8f31577e928adb6110186f6.jpeg

 

1D4511CA-2BEC-43BD-9EF3-94162F992949.jpeg.59bce359d390207b541e7479f928762e.jpeg

 

D271ACA3-CF25-4327-B862-7091C9C181F0.jpeg.a0093ed830057953a6e43d7500c2a8e9.jpeg

Choppers whistling away 

607E08F9-1278-46D0-8190-E8B555F9AFA3.jpeg.a3c6c47a472a67e33eb150c386948a10.jpeg

 

 

  • Like 8
Link to post
Share on other sites

  • 1 month later...

Progress with Middleton Central has been a little slow lately, so not many updates lately. We have been backtracking  a little with this Warehouse building that hides the control panel. 
0F74E8A9-19BB-486F-B001-FB78CEC3C485.jpeg.e66417645791fc10a0c0c22dca70aa6f.jpeg

We have decided to make alterations to the panel, allowing it to hinge forward towards the scenic side. This will allow us to operate the layout from the front and rear. 
The Warehouse will have a removable upper floors section for panel access. This will only be used for club operating and not exhibiting: 

8323B085-AEF4-4EC2-8692-88F7B5F1AB90.jpeg.b142d04997767900f7a13dc45d91bd3c.jpeg


33CC387B-EB0D-4D41-989F-A22B6087627C.jpeg.4a7723a70b3926b40a092a4d6bad49de.jpeg

The upper floors section slotted into position. 

9398D3F7-C54A-406E-B8CB-56AF4D47F60E.jpeg

  • Like 2
Link to post
Share on other sites

30.1.23
Working on the middle board still. More progress with the footbridge and water tower. Dave has now finished painting and detailing the disused water tower and is now fitted in position with more greenery added around the base. 
320EFCF5-65E1-4052-8C4C-8830042D23C3.jpeg.a9643a009f8c9c1757030f92faee68d4.jpeg
The footbridge sides and arch details are being added, and stairway to the signal box footpath fitted in position. 6E9434E8-298C-46C9-885B-9A4E0FB5D3E8.jpeg.a2535083394ed8d5affc17f83c8538cb.jpeg 
I’m currently adding a canopy to the Warehouse building, and a valance will be added next. 
3D473F15-E22E-436A-AA47-29E0154F076D.jpeg.fab3bdee2f800c1f388434761fac3550.jpegThis area is starting to come together now and looking the part with some stock placed on. 

Next week we are planning to set up all the boards and have a running session. 
Cheers Shaun 

M.R.P.G 

Edited by M.R.P.G
  • Like 4
Link to post
Share on other sites

Warehouse canopy valance completed.

7A23A896-DF09-4C47-84C2-C0201551093A.jpeg.134d6b46e619b23d039a8f08dfcec649.jpeg

The protruding girders will have posts fitted between tracks at a later date. 

ADE9F8FE-D04A-4929-8F97-EB46B000A0F9.jpeg.56f3c846bdfb144bd58462e65dfbf55a.jpeg

Still lots to do with this building. Roof with gutter boxes, drain   pipes and girder brackets. 

13617BEE-6A90-4D88-86EE-6A607DFE52D9.jpeg.93b42f7ac1716ab71ad50cbb9d70b6ef.jpeg

 

 

  • Like 7
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...