When operating from the front of the layout, the upper level of the warehouse is removed and control panel tilted for easy point and uncoupling operation. 5DD88577-9BF7-4F6A-86B0-495EA7A41F3B.jpeg.553aaf51aeb32c15cb5b4c512ca60ae8.jpeg
Some scenic work with the modern warehouse being fitted to the backscene board . 

50C4F027-937C-4121-9965-0C30824135FD.jpeg.52778bbd80954074b9365a820d93f575.jpeg

 

BE74A889-75DE-45CD-8505-71BF285C0F70.jpeg.a4d84b422732871a9369673e6ad85467.jpeg
108 DMU on the upper stabling sidings, and 47 522 on the kick back siding. 

  • Like 3
Link to post
Share on other sites

  • 1 month later...
  • 2 weeks later...
  • 1 month later...
  • 2 weeks later...

Club night 15.5.23 and a little more progress on Middleton Central. Started construction of a new factory building for the fiddle yard board.

E31527A3-E6E5-4B51-9321-65E42F35DBDC.jpeg.29ce0bd1507da0cba9b0461ccb7a241a.jpegMade in the usual style of Slaters embossed brick sheets, and a cladded area using Plastruct sheets. Windows are from Scale Model Innovation’s. All assembled using Mek Pak. 
CBF394FE-6B9E-41CD-B90B-711052D0C0CC.jpeg.d78995ee88ce51430c08a3dc656dfdcd.jpeg

 

2CFC3572-3C5F-4D14-AC32-FD25E2E95A89.jpeg.7eb9f331f81911938d2d6c2bdc62f21d.jpeg
 

6D3943C1-FBA9-40DD-BFF2-FCC868B3D47D.jpeg.6c7f5775ecaa97390875e63b2bee07b5.jpeg

 

2F9EDDDD-193D-431C-9A69-BD48A57BB79D.jpeg.2f7b93d00bd97ec6058c14f8c67f37bb.jpeg

Edited by M.R.P.G
  • Like 6
Link to post
Share on other sites

  • 3 weeks later...

Monday Club meeting  29.5.23. 
Was a sunny day so we took the boards outside to paint the backscenes sky colour. 
F56C3B02-E9C5-4E68-8569-4089EC1C4FE4.jpeg.2710a8924f80ab9a6895cdc2605a8ac0.jpeg

 

F1F6E916-3D2E-429A-A0DC-3C304C9BD109.jpeg.ef1018b1e0cfd8c9844b1b8c3aeade29.jpeg


The backscene details are coming along on the fiddle yard board, with the low relief factory nearly completed, adding drain pipes and vents etc.

DEB51FA7-162A-4BF3-9287-B1F5D9D064A2.jpeg.485b46c353455cc88243d69e1dbef93c.jpeg

The DMU stabling sidings now have fuelling facilities, the tanks are made from an old drain pipe, with the loading area details from a Knightwing kit. 
Some modified Portacabins for the crew mess rooms and a new office building which is still under construction. 
 

D6B6D604-8877-4F50-8CE6-F9BB0CF59D0E.jpeg.6bf133e0f705b331c5e0839efc6e5ca7.jpeg

  • Like 5
Link to post
Share on other sites

  • 3 weeks later...

Club night 19.6.23

Painting and glazing the factory, progress update. 
F7896A7C-4A73-4F7A-891A-B89EA7333257.jpeg.352a409633f165d51ec656602f9ef605.jpeg

Window frames and brick mortar painted. 

308E1F89-40DD-497E-BC83-719311E9EEC8.jpeg.6edd892b551e285f6ca97f4d58a4665b.jpeg

 

Grey primer sprayed onto the corrugated sheets area. 
95AAF1B6-A789-45F3-87C5-169841EFF38A.jpeg.bd414100bd10e41df1fab5c269c7802f.jpeg

 

The building is now glazed with a few smashed windows, and dry brush weathered, but still a few more details to add, so still not yet fixed to the backscene. 
FDA60ABF-90E1-42BF-9A21-13E9641BDCBA.jpeg.63f14af2bf3c1584175e9462130ae59c.jpeg

  • Like 6
  • Craftsmanship/clever 1
Link to post
Share on other sites

  • 3 weeks later...

Club meeting 10.7.23 progress update. 
Working on the centre baseboard, this week with some more low relief building construction.

Slaters Embossed sheets was used for the latest factory building, with a mixture of windows to add interest, some lasercut and also some from Scale Model Innovations. A pitched roof is still to be added. 
BFB15E87-A838-4B6D-A251-FB80B01B0726.jpeg.3c53ecfd2d1726876c6b8f01045eb70a.jpeg

 

6FEF6116-0461-4D07-9D6D-4A7316C1ACDF.jpeg.a910fbc2768ccdfaf9a38bba5f814cb9.jpeg

 
Painting of details on the other building, shutter doors and canopy valance etc. 

054A59B1-BC32-4BAE-AF02-08F70616FAB8.jpeg.1cb88d92765e514f91bd62c6eef2df29.jpeg

 

D76DADF3-40D9-4B77-80AC-3455CF4C0ACE.jpeg.79763b61ad1192a37073937a18204458.jpeg

 

DC6C13A1-4C20-41CC-805B-F60BB1613E6A.jpeg.6cc43e436cf099290f6ef8c0cab35b4a.jpeg

 

  • Like 7
Link to post
Share on other sites

  • 2 weeks later...

Monday Club meeting 24.7.23.

More progress with these two building’s. Dave has nearly finished this factory. Roof added with gutters and down pipes. 
7322C586-8F21-45F5-A1AF-A95291EDA420.jpeg.f6d1362c4cc5c97eac1db13b01f362d4.jpeg


14A39299-C36B-40E3-98D0-260AEBD527C4.jpeg.4d59cabded2a3e9f73660520da8af6e6.jpeg

This building needed finishing of with Roof slates added and sky light windows, also down pipes. 
Will be adding glazing and paint next week. 
4D15E539-B3D2-40B0-B128-D4C314E488CA.jpeg.b357d45a70b72e1af1440e9a1f2794a4.jpegNow that’s done it’s cuppa tea and biscuits time . 
Cheers Shaun 


 

  • Like 2
Link to post
Share on other sites

  • 3 months later...

Middleton Central has been progressing well with scratch built buildings for the backscene all now completed and fixed in position. Interior lighting has also been installed.
336EB2B5-F209-46DF-97F3-05E40F48D2FC.jpeg.1e7696ff78afd3e6f51c18fc81b6d144.jpeg

IMG_9377.jpeg.4a31d39bb15390ffc4c895a8c85442a7.jpeg


Construction of platform canopy’s and station lighting has been completed. 
Other details include yard and street lamps. IMG_9342.jpeg.4213cd8a7dc64be5b13b87469b6b16bf.jpeg
IMG_9378.jpeg.22d9aa8b826e12af6d5e24a91744cfa0.jpeg

 

  • Like 3
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...