Jump to content
 

Engineering work - West Coast mainline does it often overun


Recommended Posts

Being not a regular UK rail user - A quick question.

 

I want to travel from Birmingham to London Euston on May the 7th in the afternoon.

All trains in and out of Euston are not running over may Bank holiday up to and including the 6th.

 

In your experiences does engineering work often over run often these days and I am a fool thinking of travelling on the 7th or, although there are no guarantees, will I probably be OK with little or no disruption.

 

Thanks

 

 

Link to post
Share on other sites

Why not travel from Birmingham Moor St to Marylebone?

 

These are the plans for the two bank holidays on the southern end of the WCML:

 

Work at Easter between Good Friday (19 April) to Easter Monday (22 April)

Best days to travel: Thursday 18 April and Tuesday 23 April.

Work on the West Coast main line between London Euston, Rugby, Milton Keynes and Birmingham International includes:

Primrose Hill tunnel strengthening

Preparation for HS2, Britain’s new high-speed railway

Work to improve points at Willesden Junction

Track foundation improvements between High Wycombe and Leighton Buzzard

Maintenance work to Bletchley railway flyover

 

Look ahead to early May bank holiday engineering work: Saturday 4 May to Monday 6 May

Best days to travel: Thursday 3 May and Tuesday 7 May

Some of the work carried out at Easter will need to be continued between Saturday 4 and Monday 6 May.

Passengers are being advised to plan ahead and check the best days to travel when this essential planned work takes place on the West Coast main line.

This will have a major impact including alternative routes, longer journey times and less chance of a seat.

Over the bank holiday weekend:

Euston station will be closed to main line train services as work takes place to prepare for HS2, Britain’s new high-speed railway.

Track will be replaced between Willesden and Watford, and track maintenance carried out in the Milton Keynes area.

 

  • Like 1
  • Thanks 1
Link to post
Share on other sites

  • RMweb Premium
5 hours ago, woodenhead said:

Track foundation improvements between High Wycombe and Leighton Buzzard

Now that is interesting, are they reopening the Cheddington to Aylesbury branch as well as Bletchley to Bicester?

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...