Hi all,

 

I have been spending quite some time, on and off, on a layout and I think it's about time I told the world.

The layout consist of three boards measuring 40x90cm (as Google tells me, 15 inches by 3 feet). It's designed to fit in an all-British modular railway. As such, the track plan is very dull, just a pair of tracks running along the boards. A set of points are included, just to learn about points, point motors, DCC buses, and so on.

 

20230414_195754.jpg.6629e01ba79bc9404cd664d53b871972.jpg

 

Quite some time is spent on the buildings on the layout, such as the tunnels shown above. I am going through the layout bit by bit to paint the tracks, do the ballasting and so on.

 

20230421_211540.jpg.faccbf6115c205d8a7c0f2fcaa46072b.jpg

 

The other two boards include a London Underground station large enough so that 6-car trains can halt there. It is all based on the oldest sub-surface lines (which are very close to the surface, rather than the deep-level tube lines) and stations such as Baker Street, Praed Street and Notting Hill Gate.

 

I don't have the best pictures available to me now, but should get around to uploading some in the next few days.

  • Like 9
  • Craftsmanship/clever 2
Link to post
Share on other sites

Today was about repairing damage caused a year ago. The station's canopy has come loose. Some glazing panels have gone missing completely, most others have dislodged from the roof construction.

 

Today, I have reattached the glazing panels. 14 out of a total of 24 are back in place. The others are missing and need to be rebuilt; I hope to rebuild 7 panels tomorrow.

 

IMG-20230423-WA0016.jpeg.6dce4f9c7471311292fb79b696c484c4.jpeg

  • Like 6
Link to post
Share on other sites

The roof is coming together nicely, so here's the view from under the canopy.

 

20230427_100711.jpg.f1c4d88f89bdc55489e920ea00721fd7.jpg

 

Next up: painting and ballasting the remaining track. I also need to finish the wall to eliminate the light bleeding through from under the arches.

  • Like 12
  • Craftsmanship/clever 1
Link to post
Share on other sites

Wow, you've put a lot of work into this, coming along nicely.  Just one thing regarding the track in the station area, would this be ballasted or built on concrete with escape or safety pit between the running rails?

Link to post
Share on other sites

1 hour ago, Jeff Smith said:

Wow, you've put a lot of work into this, coming along nicely.  Just one thing regarding the track in the station area, would this be ballasted or built on concrete with escape or safety pit between the running rails?

 

Thank you. I've had to do a bunch of research on the ballastin in the station area. It's certainly true that the deep-level tubes are built on concrete and have safety pits.

 

I am basing my layout on the much older sub-surface lines (the Metropolitan Railway for example) which are built much like mainline railways. These have traditional ballast.

 

Long story short, the track i  the station will be ballasted. There is a join in the middle of the station which needs to be dealt with.

  • Interesting/Thought-provoking 1
Link to post
Share on other sites

In station areas, unless new ballast has been installed, the rail sides, sleepers and ballast tend to be basically the same medium to darkish brown due to brake dust and other ageing.  Even the insulators are dull coloured.  Positioning of the fourth rail is problematic in OO due to the underscale gauge.  It is mounted on the sleepers and if installed a scale distance from the centre conductor will appear too far from the running rail.

Link to post
Share on other sites

Very true! Eagly-eyed viewers will note that the 3rd and 4th rail are incorrect on Mind the Gap. This comes down to the modular nature.

 

Every once in a while -usually once every month or two- all of us will get together and link up all of our modules and run trains on the combined layout.

There are no rules on what trains we can run. I had failed to remember this when installing 3rd rails and 4th rails on the sleepers as per Peco's recommendations. This resulted in a crash of a Javelin onto the 4th rail...

 

For this reason, my 4th rail is now safely tucked in between and under the level of the running rails.

The 3rd rail isn't mounted on the sleepers for the same reason. It is also aligned to the power pickups on the Metropolitan Bo-Bo.

 

Edit: Here's a picture of the 3rd and 4th rails and their isolators.

20230428_210628.jpg.9e68959d035dd663a97f7149c4035cf8.jpg

 

Edited by GloryDays
  • Like 2
Link to post
Share on other sites

I don't have much progress but I want to keep the momentum going. The running rails have now all been painted, there's 4 sections of rails to go.

 

I would be quite happy when that job is complete and I can get on with ballasting. The platforms have been removed for this purpose.

 

20230503_202820.jpg.8c8b83d28ce72eaa35adb7bcb4438b42.jpg

 

Edited by GloryDays
Added picture
  • Like 3
Link to post
Share on other sites

  • 4 months later...

It has certainly been a while... a whole Summer, in fact! I'm happy to report the ballasting is all done.

 

All of the 3rd and 4th rails are in place and painted so both me and my rolling stock is on track 😁.

 

20230912_204111.jpg.03f7b83a800ad565cc3057981d8cb76d.jpg

 

Above picture was taken with the layout in its stored configuration; divided in 90cm sections.

 

In other news, I had a fleet of 8 ex-LSWR 58' from when I was modelling the Isle of Wight.

 

20230912_204513.jpg.b04a60f3eaeaa26212290df1ee98e35e.jpg

 

These wore nice SR olive and BR maroon liveries. Alass, they had no place running on the Underground in these colors.

 

With a little use of Rule 1, let's say London Underground happened to strengthen its carriage fleet with these 58' coaches. They are close enough to Dreadnoughts for me to imagine such a thing. And I happened to borrow an airbrush so I could have a go at repainting my fleet.

 

Here is my result until now:

 

20230912_204455.jpg.1617302d6a1dd24a585a4bcfcff16943.jpg

 

The close-up shows the unfortunate struggles my camera has in limited light.

 

20230912_204419.jpg.df10c5af0a56ff4b73056cbe8d489f7e.jpg

 

Overall I am quite happy thus far. The brown appears a bit lighter on the picture than it does in real life. It might be a bit too light, but I'll run with it. In any case they play much nicer with my London Underground locos.

 

Next steps are to arrange London Underground decals and put the coaches back together.

 

 

  • Like 6
Link to post
Share on other sites

  • 1 month later...

While I am waiting to get transfers, I am cracking on with building the layout and station. The layout is gaining a back wall and side walls while the stations are getting lit up by 60 LED lights.

 

Here are the first two LEDs in action. In the dark, their effect is quite pronounced, but it's more subtle under normal lighting. Notting Hill Gate provides inspiration for placement of the uplights.

 

20231027_204539.jpg.95fd696341e7f152076fd7860869e469.jpg

Screenshot_20231027_214932_Firefox.jpg.313a429c171ff7d9af89fea3d795c266.jpg

 

At Notting Hill Gate, the platforms are lit by lights hung from the roof. This is very fragily and I expect the layout to be moved around a lot. I decided to go with light posts on te platforms.

 

20231022_203413.jpg.74f354517e0f3af0db14915999d26307.jpg

  • Like 9
Link to post
Share on other sites

The cut-and-cover stations are among the most beautiful Underground stations and I believe they offer more opprrtunities for modelling all sorts of railroad traffic; especially when you consider the Widened Lines. On the other hand, the deep level tube stations are icons of London Underground.

 

In any case I've been working on the lighting. Loads of LEDs fitted to the layout today, only to discover I need loads more. Oh dear!

 

On a happier note, I am happy about the lights I've got. The arches need two LEDs each, but they can be fixed to, and hidden by, the station nameplates.

 

20231029_194328.jpg.5ed3e61e0bab67d9c84a31272002f94f.jpg

  • Like 1
Link to post
Share on other sites

  • 2 months later...

I've been neglecting you in the holiday hustle... oh no!

 

The attic / railway room has gotten new lighting, the old light only lit the staircase to the attic, but didn't give any light to work by. That has now been fixed.

 

I'm also putting the layout up on its exhibition legs. It's been a while since our club has got together and I need to make sure everything still works. I have my work cut out, the cable management is very sloppy. I've got the oppertunity to install a background and a proper floor for the street level. I hope to complete the woodwork by the end of the month.

 

Here's the current state of Mind the Gap.

 

20240103_200253.jpg.036b04b731d91230f92b71955a7b5b47.jpg

  • Like 1
  • Friendly/supportive 1
Link to post
Share on other sites

A little progress is still progress. Today I've managed to cut and fit two boards for the street level. These can stay in place when I need to take the layout apart.

 

If there is a derailment, the tunnel comes apart. That's also a fun feature at shows!

 

20240104_203654.jpg.f0798179794b4264ee42e1fba29422ee.jpg

 

IMG-20240104-WA0004.jpeg.4d57e4d7df7fb3d8ecd3bced29206655.jpeg

 

  • Like 4
  • Agree 1
Link to post
Share on other sites

Another bit of progress. More street-level boards added and I am working on the third and final backscene. Next: fixing the new street boards to the tunnels below and painting the tunnels brown.

 

20240106_162906.jpg.2464c3258f783c23a2d05d87ca29e541.jpg

  • Like 3
Link to post
Share on other sites

Yet another small step sees the layout coming out of the woodwork. Let the bad puns begin!

 

I am also nearly out of wood so a trip to the DIY store is in order.

 

I am also shocked that after building the layout for a few years, I have only new reached the stage of "empty canvas" ?

 

20240107_162203.jpg.921af1acb4a4c2123afe63ec77d193e6.jpg

 

  • Like 4
Link to post
Share on other sites

  • 2 weeks later...

I can officially tick the box marked "woodwork". The layout is now framed as my module club requires. A coat of dark gray paint is next.

 

Then, I've got to get Mind The Gap ready for the first exhibition in years in Alkmaar, a lot of cleaning and testing is in the future.

 

IMG-20240120-WA0008.jpeg.befd63c195646ec62cd3d27fcd66987b.jpeg

  • Like 4
Link to post
Share on other sites

A quick update as I've polished the tracks today. The layout performs nearly as it should with power available to all straight track and one of the two points.

 

The other point is my first problem.

as is, I've installed Electrofrog point but rely on the contact between the point and tracks for power. The points are completely stock Peco points.

 

The broken point only provides power when the diverging route is selected. On the exhibition, the straight route is used. I've wired the Electrofrog to provide power for the straight route. This would cause a short when the point switches to the diverging route; this is fine for now. The points will be disabled at the exhibition.

 

My other problem is bitter irony. The 3rd (outside the running rails) and 4th (in the center between running rails) are prototypical for London Underground. I was testing the Heljan Metropolitan Bo'Bo; also correct for London. You'd think that would go together... but no, it doesn't. As it turns out the couplings on the Bo'Bo are very low. They interfere with the 4th rail... interesting, as the 4th rail sits below the running rails to prevent this exact problem.

 

 

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...