Yes, sure, but I was wondering what they were actually doing. Several tears ago they used the Christmas break to replace a farm underbridge between Knebworth and Stevenage. They built the new one in the field next to the line beforehand and slid it into position during the break.

 

Ed

Link to post
Share on other sites

  • RMweb Premium

Engineering also at 36E this weekend. Trackwork as far as I'm aware.

The Stevenage work is probably to sort out some of the difficulties with the OHL last week that resulted in East Coast services (electric anyway) not working into the X south of Peterboro'.