Jump to content
 

The non-railway and non-modelling social zone. Please ensure forum rules are adhered to in this area too!

The Fifteen Billion Pound Railway


gordon s

Recommended Posts

  • RMweb Premium

Just watched last nights programme.  Rivetting as usual, even if it all hung around a TBM breakthrough.   I'm sorry that there were only three programmes and will miss my Wednesday night fix.  However if tight editing has kept the quality high I'm all for it.  I suspect that there will be other episodes in due course as the tracklaying and train commissioning proceeds.

 

The whole series has really shown off construction talents.

 

Jamie

Link to post
Share on other sites

  • RMweb Premium

i would liked to have seen more views of the narrow gauge equipment used, but an other wise very good programme

The Industrial Railway group on Yahoo has a fair bit of information on these lines. Some of the locomotives (Schoma) were/are from the channel tunnel having been refurbished. IIRC the gauge is 900 mm, same as the CT.

Link to post
Share on other sites

  • RMweb Premium

The Industrial Railway group on Yahoo has a fair bit of information on these lines. Some of the locomotives (Schoma) were/are from the channel tunnel having been refurbished. IIRC the gauge is 900 mm, same as the CT.

I believe that's there quite  a bit of ex CT equipment operating under London at the moment.  I think they are using some on the big sewer project that starts in the Willesden area.

 

Jamie

Link to post
Share on other sites

  • RMweb Premium

Just  been informed by my other half ( read the info on another forum(tv)) that there are to be three 3 part series in total over the coming years and that the first series is due to be release on dvd at a future date.

 

Steve

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.


×
×
  • Create New...