The Ultimate Shed Pt 2 - Ready for the off...
I was pretty excited to get parcels from the US (Cannon and Co direct) and Eileen's Emporium so I've got everything to start the project now Here's a quick shot of the raw materials...
In no particular order...
- Bachmann EWS Class 66/0
- 0.31mm brass rod
- 0.45mm brass rod
- 0.7mm brass rod
- 0.9mm brass rod
- 28swg copper wire (coil)
- 1.5mm x 0.5mm brass section
- Cannon and Co EMD Fuel tank detailing kit
- Cannon and Co EMD Chain tensioner
New tools...
- Soldering iron tip
- Tip tinner
- Slitting discs
- 0.3, 0.45, 0.7 and 0.9mm drill bits
What's not pictured? Some Hornby Class 31 details I've got in the tool box already, along with a decent selection of plasticard in different thicknesses... and obviously a pretty comprehensive work bench set of tools including knifes, files, rules, soldering iron etc etc.
Next up? Well hopefully a photo of the 66 stripped down to the chassis rails!
5 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now