Jump to content
 

gpplumy

Members
  • Posts

    350
  • Joined

  • Last visited

2 Followers

Contact Methods

  • Website URL
    http://www.afrps.co.uk/

Profile Information

  • Interests
    railways and model railways
    industrial railways
    steelworks
    009/Hoe
    https://www.rmweb.co.uk/topic/143657-british-steel-plumtree-works-an-extension-of-scunthorpe/
    other interests
    anime
    manga
    sci fi
    lego

Recent Profile Visitors

1,219 profile views

gpplumy's Achievements

675

Reputation

  1. that i can understand ;) i also know moving something by rail aint cheap ! lol
  2. road i think, i know scunthorpe and port talbots were delivered by road. i imagine it costs too much by rail
  3. 18003 is now on trial at my work in scunthorpe. Luckily rails have changed my order for me
  4. Decided to order 31555. Its not fitting with the area. But might fit with my "what if" wisbech tramway. It does look rather wholesome in br black
  5. has anyone else noticed you can still order the barclays and the p class ?
  6. Hunslets and torpedos awaiting production expected summer this year
  7. Latest updates on current models status
  8. Something to consider Planet industrials delivered, packed and shipped there successful victory class with just 2 or 3 people. So hattons could do the same.
  9. but that is a very different barclay to those produced by hattons. id like one, but its a wholly different locomotive
×
×
  • Create New...