Jump to content
 

Gilly

Members
  • Posts

    88
  • Joined

  • Last visited

Profile Information

  • Location
    Budleigh Salterton

Recent Profile Visitors

351 profile views

Gilly's Achievements

14

Reputation

  1. What is it as modelers new and old that you need the most or struggle to find for our hobby. Is it Scenery material Electrical equipment Tools Accessories Or something else
  2. @WIMorrison I do have another layout Marsh Green Road was in the Railway Modeller back in 2015 my plan is to use the system on a small branch line station for dmus with a little shunting yard to add interest. Obviously this is all full of if's and but's mainly due to time available to work on the idea but I like the idea of doing something different and giving myself a challenge.
  3. Hi all I've acquired a Hornby Zero 1 system in working order with 3 slave units and hand held along with 10 working chips and 3 unused point modules. What are peoples experiences with this system as im thinking of using it on a small single track station with 2 or 3 sidings locomotives used would be older lima locomotives as ive heard the chips wont work with newer locomotives. Any advice gratefully appreciated.
  4. hi everyone which glue is best for attaching brass side to a coach
  5. Hi all I'm looking to replace many of my older lima and Hornby motors with a cd type and i am aware that i will need diodes to reduce the speed / voltage that the motor will be subjected to can anyone tell me what rating the diodes need to be to reduce the impact on the motor.
  6. I have acquired several old Hornby container wagons which I want to make into a usable train but I am not sure how many were fixed together I think it was 5 with the end wagons having standard draw gear obviously the Hornby wagon is missing this but I would like to fit this and I was wondering if there is a kit to do this or a way to scratch build a buffer beam to theses wagons .
  7. Its been a while since I last posted Marsh Green Road TMD was exhibited at the 2013 EXE MRS show with all new scenery and was a great success with only a few niggles found again with the points, as this is being written I am replacing/repairing the points so they are more reliable for this years show along with adding more items to the scenery.
  8. Marsh Green Road TMD was on show at the 2012 EXE MRS Show held on the 23rd and 24th of June and performed brilantly on its first outing with no electrical faults atall only problems there were incountered was the SMP hand made points playing up now and then causing a few derailments. WHAT HAPPENS NEXT Since the show i have gone from layout building etc and decided to go back to modeling as due to work comitments and holiday plans means i'll be taking a break till the end of September and starting up again in October and using the winter months in the shed i will be carrying on from where left off hours before friday seting up. Sadly i was unable to take any pictures of the layout all set up as was to busy playing trains and assisting other EXE MRS club members if any one was at the show who took any pictures or have any comments please feel free to contact me.
  9. Its been a while since i have been able to work on the layout due to decorating the house but in the last 2 weeks i have fitted all 14 point motors and completed all the wiring with the exception of the control pannel. The layout will be be on display at the EXE MRS annual exabition on the 23rd and 24th of June 2012 at The Matford Centre Marsh Barton Exeter ( see website for more details www.exemrs.co.uk ) as a work in progress with some basic sceneary but touch wood fully operational. BEFOR AFTER
  10. With the track almost finshed (ran out of lenghts) i have now started the wiring for the layout with the link wires for each track and the points be addresed first as the final isolating sections have yet to be decided. Over the next 2 weeks i plan to finish the track and progress with the wiring and add lights to the shed area.
  11. The baseboards are now all ready to be bolted together, they have been painted white and not greay as intended due to there being leftover white from decorating to help save a littel cost. I have decided to use m8 bolts and nuts to hold the boards together as this is a cheep and easy to use, using 2 per board this should give a strong hold while its being used. Clamped in place befor drilling. The legs that have come from the EXE MRS www.exemrs.co.uk will not be attached to the layout as the layout will just sit on the legs over the joints to give added suport. Once i have decided what height i should have the layout (any ideas or advice grately recived) i will be laying the track in place. The first piece of track has been layed and pinned in place at the top of the layout as you look at the picture.
  12. Hello frank and thank you for your comments. The boards are 4ft by 2ft, with the board alignment i haven't decided what to use as the front as i will have a ply wood front to hide the screws etc, so may use the bolt and wing nut method to hold them together, but i'am hoping to have talks with other EXE MRS members and see what they have used on there layouts and expand my ideas. I hope to have another blog entry to be up in the next few days as i've now painted the cork white and once dried i will be drilling holes for wires etc. Thanks Simon
  13. Update the baseboards are now built. They have had cork applied to the top of 3 of the boards as the 4th board will be used as the fiddle yard using a casset system. Once the PVA glue has dried i will paint the top of the cork grey and then i will drill the boards so they can be bolted together and drill holes to carry the wires. Once painted i will start laying the track in place lightly pinned untill it is balisted.
  14. Gilly

    NEW LAYOUT

    This blog is going to be about how iam building my layout and what problems i may face and have to over come. Its set in the 1980s to mid 90's on a fictious area of the western region (EXETER) and what could have been built if there was not a industrial estate built. The layout plans to be a 4 track coved shed with fuel, wash and departmental faciltys with scratch built, kit built, and ready to run items used to create the layout and with SMP track being used. As i progress with the layout i will update this and inclued photos. Curently the layout is still in the planning stage and just awaiting more timber to bulid the basebords 16ft x 2ft is the total size planed. Hopfully in the next few weeks the planning will be finished and construction will begin. UPDATE 08/01/2012 Final plan as been decided now just waiting on the timber to be delivered and then the baseboard construction can begin and the next stage of the layout can begin. More pictures added.
×
×
  • Create New...