Posts posted by andyram

  1. A small update on Kings Morton and the rest of the project. I popped up to the club room during a quiet and wet Bank Holiday. All three committee members were present and their wiring expert was busy on the rewrire of the layout. He praised Andy’s work stating how easy it was to renovate the electrics for analogue control. They hope to have both circuits working by the end of the week. No further scenic work has been undertaken on the layout. This has been due to work on other areas of the building.

     

     Beyond the main room, the building has several small shop units from the old galleries. These are being restored as different themed displays. One will be a mock up of an old fashioned toy shop, whilst another will include a display of Hornby memorabilia. The group have rescued another layout,  

    based on the TrackMat. This is now in place and will be wired for a push button operation. Some of the group were busy sorting this room out today and I have been only too happy to donate some former shop display items to the project.

     

     At some point, with their permission, I will try and share some more photos. 

    • Like 7
  2. 42 minutes ago, southern42 said:

     

     

    Andy, great photos. Lovely surprise! Always good to take advantage of what you have.


    Re deadline. From experience, may I suggest you bring your deadline forward of August 6th. Allow time to appreciate what you have achieved and a chance to have a more detached 2nd look. Anything untoward can then be dealt with without too much panic! Also, speaking from experience, forget about some of the more minor details until after it is presentable or presented. It is so easy to get hooked on finishing a particular area/item at the expense of another, or getting a bit of detailing done that could really wait but delays progress.

     

    Good luck with the layout, it will be fine in the end, and best wishes to you and for the shop in the coming months.

     

    Polly

     

    Thanks Polly

     

    At the moment I have a clear idea about what I need to do to progress the next stages of the layout. I want to complete the rear of the platform by building up the section with plaster bandage before applying some static grass and trees etc. I then aim to ballast the track and complete the tunnel mouth. Some of the finer details can definitely wait as you say. Overall I am happy with the look of the layout and will be using it for more photos in future as well as enjoying operating it when I can. 

     

    The first week back in the shop has been the busiest ever which is why I have not had much chance to work on the layout or even frequent RMWeb. 

     

    Whilst August 6th is a target date, I will not lose any sleep if it is not done by then. I agree, it is important to enjoy it.

     

    Andy

  3. Unfortunately the self imposed deadline passed a week ago with the layout some distance from completion. The preparation for the reopening of the shop took over much of my time over the last couple of weeks. 

     

    I will return to working on the layout soon and my next target is to try and complete by August 6th which is the shop's third anniversary. Perhaps I can display it in the shop on that date. 

     

    Tommore Bay has seen some visitors today with the station used as a backdrop for photographing some items from a recently purchased collection. The largest visitor was Coronation Class 46256 "Sir William A Stanier". Here it pauses in the platform after a test run.

    IMG_1045.jpg.df50250ca762853acfb7f907d3b1a53e.jpg

     

    The Coronation was soon followed by Parallel boilered Scot 46165 "The Ranger", seen here entering the platform.

    1719662819_Scot2.jpg.60ae87d1665ed3c168caa1a204222068.jpg

     

    Another light engine passing through was Patriot class 45543 "Home Guard"

    518915382_Patriot3.jpg.5f458a6193748b5bfc8e440c21fb019a.jpg

     

    Jubilee class 45611 "Hong Kong" pauses in the platform for checks after the crew were concerned by a clanking sound when running in reverse.

    85915936_Jubilee2.jpg.7ce0cd92f739d5af84696b2200238394.jpg

    • Like 2
  4. Back at the shop today and I managed to catch up with Pete again. Further work has been undertaken with some replacement track laid and wiring completed. A train can now travel around one of the circuits.

     

    Providing government restrictions ease as planned, the group can start to allow visitors into the building in the middle of next month. They are working to get Kings Moreton presentable in time. They are also looking to display other working layouts too but none of their other projects are close to being completed. They may be on the look out for loans or other layouts for sale.

    • Like 7
    • Friendly/supportive 1
  5. Yesterday, whilst visiting the my shop to complete preparations for today's reopening, I caught up with Pete and had a chance to view the progress on Kings Moreton. The support system has been completed and the layout is now back up on legs at a working height. The regular members of the group have decided to rewire for analogue control because most of them have mainly analogue collections. Rewiring has started and train can now run from the remains of Kings Moreton station along the main scenic section, over the canal bridge and to the smaller station (Dore End?)

     

    Here are a couple of pictures of the work in progress state of the layout at present.

    IMG_3343.jpg.583654daf6b3e437eada3f621c00af62.jpgIMG_3203.jpg.8e3595166f42ebd1524e96e2a1a00d17.jpg

    • Like 17
  6. Following yesterday’s government announcement, I am pleased to announce that A2B Model Railways will reopen its doors next week. We will reopen Monday 12th April from 11am - 5pm. We will then open on Tuesday, Thursday and Friday (11am - 5pm) and then Saturday (10.30am - 5.00pm)

     

    All orders placed before midnight on 12th April will qualify for our prize draw for the chance to win a £100 voucher.

    • Like 1
    • Friendly/supportive 1
  7. 11 DAYS TO GO

     

    At present there is just 11 days until the likely date the shop reopens. Not a lot of progress has happened this week so completion is looking next to impossible. How far away things will be come the planned finish date remains to be seen. Small progress to report today. The balsa wood has been cut to size to form the rear of the platform. This will allow the main station building to be supported. Hopefully more progress to report soon.

    IMG_0178.jpg.1aa2d86db74b7f06a6b651f405ff73f4.jpg

    • Like 3
  8. 13 hours ago, Les1952 said:

    TRADERS CONFIRMED

     

    Book Law

    Sherwood Models, Nottingham

    A2B Models, Matlock Bath

    J&C Models, East Goscote,

    Starlight Models, Wellingborough

    Malc's Models, Ilkeston

     

    A shorter list than we would normally have but we're still working on gangways and space.  There might be room for a seventh but that gives us three model shops selling ranges of mainly new and a good understanding of what each other do (helps to avoid too much duplication), one second hand specialist, one selling entirely kits and bits and one book seller. 

     

    I'm retiring as show manager (after 6 years) at the club's next AGM and Mark Shipman is taking over.  This year's show will be a joint effort- Mark and I sing off the same hymn sheet in most respects regarding shows.  We are going to have a garden meeting in the next couple of weeks to get the final plan together and we should then have a workable floor plan.

     

    This year there will be more demonstration stands than in previous years.

     

    And we STILL haven't laid out any money yet.....

     

    All for now

    Les

     

     


    I thoroughly enjoyed bringing my A2B Model Railways trade stand to the 2019  show. After last year’s cancellation, I am looking forward to returning in 2021. It is a very friendly show.

    • Like 1
    • Thanks 1
  9. 1 minute ago, Andrew P said:

    Any thing is possible at Seven Mills, and today a big surprise for the Staff. 

     

    A new 08,

    IMG_4518.JPG.2141a1b9b45a76697e25be632570f6e3.JPG

     

     

     

    Very nice, although sad to see the heritage one leaving the fleet. I finally watched the latest video last night too. Very good again (although were you slightly out of focus in the introduction?) Could have been my eyes - I tend to watch them just before bed - and no they are not a cure for insomnia, they are a perfect way to wind down with a drink. Enjoyed it again.

    • Thanks 1
    • Friendly/supportive 1
  10. 20 DAYS TO GO

     

    Another day, and some more progress to report. The platform has been glued down this afternoon. This will allow the ballasting to be undertaken perhaps later in the week. The platform pieces can be seen, held down by various heavy objects whilst the glue dries.

    IMG_7436.jpg.fcad9377b042a445b0a3980da6e4e98c.jpg

     

    To the left of the platform I have the lamp hut and the signal box. I am not sure that this looks a bit cramped against the track and whether the space on the opposite side would be better for signal box location. Thoughts are welcome. 

     

    IMG_7642.jpg.b5407ead9056854fd4585721b45d121c.jpg

×
×