Jump to content
 

innocentman

RMweb Gold
  • Posts

    187
  • Joined

  • Last visited

Posts posted by innocentman

  1. Bit more progress on Sunday. I installed the DCC power bus down the length of the current boards using the cores of a mains flex cable. 
     

    8EE8AE61-99B2-4B7D-BED7-B393CEDE785D.jpeg.8d21fa4960856f72015ad29057091181.jpeg

    In this case it is “just 2 wires” as there are no points on this board, only tapping off the bus to feed the track. I only have temporary jumpers between the boards. I need to find a suitable high power plug and socket to use.

     

    IMG_3999.jpeg.81fb018c23488a3815835e6132360bac.jpeg

    Bit more on this board with currently 4 points. The circuit boards you can see are the Gaugemaster Auto Frogs, which have a connection to the frog and power bus. I have mounted these on som 3D printed blocks.

     

    For some reason I didn’t take a photo of the underside of the middle board which is the only one with a point motor fitted on the hand built point.

     

    Time to put the layout back up. IMG_4001.jpeg.d74b880c9d215c186d79eb44ee865d37.jpeg
     

    Also time for a test. Time to dig out a couple of locomotives that have not seen daylight for years.

     

    IMG_4005.jpeg.0512e93a6ff2f4056153032072d3b969.jpeg

    First up a Korean brass N&W Z1-a. A favourite of mine. It’s A 2–6-6-2 Mallet.

     

    IMG_4006.jpeg.0662d8d768b954edf3c4651de5095649.jpeg

    Next is an out of the box Proto 2000 (manufactured by Roco) Y3 2-8-8-2 Mallet. This one is Sound fitted out of the box.

     

    I did shoot some video of some of the test running. I suspect I may have to upload it to You Tube and use a link to put it in a post. One thing I did learn from the little running I did is that locos sitting in boxes for 12 years do need a little maintenance and lubrication. Time to get the rest of the fleet out of storage!

     

    Andy

    • Like 7
  2. Bit wet in Morecambe today so ideal opportunity to build the custom Y point in the comfort of the work room. I have built quite a bit of copper clad track work over the years but not for about 20 years. A bit out of practice but keen to get stuck in. This point however is the first one I have ever done in flat bottom rail! Will it be the last!

     

    First up using the print from 3rd Planit stock on the copper clad sleepers. I have had a pack of sleeper strip the correct width (well same width as Peco sleepers) for years. Finally putting them to use

     

    IMG_3978.jpeg.b96ffc1c0584cab524eabdfc2114163f.jpeg
     

    Next up one of the stock rails with a recess filed in for the toe of the switch blade.

     

    IMG_3979.jpeg.ed0a2f652cd4b45b5d78d53531bdac32.jpeg

     

    with the stock rail tacked in position time for the frog. This took a bit of filing on the foot of the rail to get it to mate up correctly 

     

    IMG_3980.jpeg.ef89e62bc7ff39e7db73d47315635f6b.jpeg

     

    no we are cooking, second stock rail attached and first wing rail, followed by the second. A little notch as cut into the foot of the wing rails with a grinding disk on the inside of where I wanted to put the bend in. Makes for a sharper bend.

     

    IMG_3985.jpeg.92e8bf2fb4d3e5fd90fc581e418555cb.jpeg

     

    Onto the blades. I was expecting these to be a pain to file but I found I could easily clamp the rail in my bench vice at an angle an file down to the jaws. Little bit of post vice tweaking and we have them installed.

     

    IMG_3988.jpeg.4603832f576d79fc2beb532ec139e722.jpeg

     

    The gap between the point blade and stock rail was set using a 20p piece. Check rails were added, and done in a fashion so as to match the Peco points.

     

    IMG_3990.jpeg.567f6069865c35c89d7c72972e37ef65.jpeg

     

    I gapped the sleepers, tested it electrically to ensure no shorts and gave it a good scrub to remove any flux residue. Ready to go on the layout

     

    Andy

     

    22E65767-6705-41D7-BB1D-670AE9754303.jpeg

    IMG_3992.jpeg

     

     

    • Like 5
    • Informative/Useful 1
    • Craftsmanship/clever 2
  3. 1 hour ago, 298 said:

     

    Certainly for DC, DCC can be less constrained but the belt and braces method would be the same. In theory it only needs to be as long as the length between the vehicles with pickups (such as the combined length of a double header or top and tail formation, as you can mitigate against individual vehicles bridging the gap by using insulated rail joiners with a raised section so metal wheelsets can't bridge the gap.

    I like the idea of the insulated rail joiners. Thanks.

     

    The plan is to try two Auto frog juicers between points 12 and 15 on the front of the layout. I only have to worry about a single loco or small fright, no double headers or pushers. This particular section is more for turning the loco when it comes back down from the mine.

     

    The fiddle yard return loops are easily big enough for a full length train so no worries on those sections

     

    Regards

     

    Andy

    • Like 2
  4. Spent a little time last night working up a control panel diagram on AutoCAD for the Donford Junction section and storage yards.

    DonfordPanel.jpg.9bc395001d5d9464ea48a153be544215.jpg

     

    The different colours denote different power districts (did I mention this was going to be a DCC layout? 🤔)

     

    The small circles will be green indicator lights showing the set route.

     

    The square boxes with a cross and circle denote the locations of the toggle switches to operate the points. The switch positions are set not print except for the hole to drill for the switch. The box is only there to ensure spacing between the switches and no clashes. These are numbered to match the numbering on the  track plan. I will have to think about number 7 & 8 once I have the track laid as they are effectively 2 crossovers.

     

    I will work on the mine panel later today

     

    Andy

    • Like 5
  5. So over this weekend I have laid as much track on the first three boards that I can. Progress Pictures below: -

    Donford5.jpg.4bde42e5542d4fd9d6e881a19b997275.jpg

    First up was to print out a full size jigsaw from 3rd Planit and stick them together. I placed few points on to align with the locations indicated as the tie bars to see what it looked like.

    Donford4.jpg.3a85e70cf84df37e911bd47742f2641e.jpg

     

    After a bit of marking out of the centre lines I started to lay the track onto cork roadbed. The cork is 4mm thick and comes in 300 mm x 300 mm sheets. Its self adhesive which is a bonus. The track is secured to the cork using Evo Stik (Other contact cements are available)

     

    So by close of business on Sunday I had managed the following: -

    Donford2.jpg.ab23492a4cc7490237f1e3b90ef0ab49.jpgDonford1.jpg.c56eb59c48429cdc015a1f0e56f396f2.jpgDonford3.jpg.101a011a0ae192be85314d1c884aeb80.jpg

     

    Its amazing how much rubbish you accumulate on the top of the boards as you proceed! The beer fridge is easily accessible with the boards in this temp location 😉. Operational position will be right up to the red Shelves on the left.

     

    In need to add a couple of custom pieces of point work before I can proceed with any further, one of which exists but is in Leeds 64 miles away, and the other Y point that kind of sits in the middle of the range of the two PECO options. I will go into more detail on the point construction as I cross that bridge later this week or weekend.

     

    Andy

    • Like 9
    • Round of applause 1
  6. 1 hour ago, stivesnick said:

    I remember seeing the layout in the video at a show. Did that layout also have a high level line serving a coal mine?

     

    It did Nick. However on Crystal Creek it was intended to extend the layout to have the mine connection meet the main lines. Alas space restrictions negated this possibility and the layout was dismantled a few years ago now.

     

    Regards

     

    Andy

  7. I have been on RMweb for many years and finally I'm going to start my first topic for my under construction Norfolk and Western Layout.

     

    This is not my first adventure into the wonderful world of N& W Steam. Many years ago my brother had a layout called Crystal Creek on the exhibition circuit and I contributed to this (Mainly stock) and operated at exhibitions. A video below from 2010 shows a bit more of what we  achieved back then.

     

     

    Now its my turn with assistance from my brother Ian. 

     

    Ian is a bit of a genius when it comes to designing a layout and he uses a design package from the USA called 3rd Planit (https://www.eldoradosoft.com/)

     

    Having moved house in 2021 I now have a garage with internal dimensions of 18 ft x 12 ft.. Those dimensions sounds great, but the garage is used for other things and has a fixed workbench among other things, so the available working dimension for a layout (internally) is 17ft x 8ft. I did also say to Ian that it was possible to extend the layout beyond the open garage door to make things a little more interesting. So after a couple of iterations and thoughts on operations we have arrived at the following: -

     

    Low Level Section (Donford Junction and fiddle yards

     

    DonfordLL.jpg.b109dcf2c81e355599a7dc2d8032555f.jpg

     

    High Level Section Beryl Inc. Mine No. 3

    DonfordHL.jpg.b0328c18954fcabea998123cea86b8d5.jpg

    The Mine sits 6" above the fiddle yard and does involve a spiral to get up there.

     

    Overall dimensions are 25ft x 6ft 8" as I managed to increase the width in the top right section by the boards fitting in between a couple of shelves!

     

    I'm in the process of laying the first track on the first three boards that have been constructed, so hopefully I will have an update soon with some construction progress.

     

    All the best 

     

    Andrew

    • Like 6
  8. 5 hours ago, innocentman said:

     

    The Photon is currently half way through its 7 hour print time, looking good so far. I will let you know how it went on a little later 🤞

     


    The print has finished and it has had time to cure in the spring sunshine. 
    9FCE61EC-0812-4268-AC5F-80752329DC89.jpeg.0fc52e96c9f2a7794dda84e8ca4da397.jpeg

     

    3B3B1E99-6980-4030-9401-2D41B950DCDF.jpeg.eea7f5a640ffa9376c2573cb2cecbd0e.jpeg

     

    Overall very pleased but does have one issue with the tank bottom warping. I will add some ribs to strengthen it stop it warping on the next version. I will make the ribs deep enough to act as a support for a sheet of plasticard or similar that can be used to creat a base for whatever way Mike wants to create the water effect.

     

    Back to Fusion 360

     

    Andy

    • Like 9
    • Craftsmanship/clever 4
    • Round of applause 1
  9. Mike has kindly provided me a dxf of his 2D drawing of the Wentworth water tower to see if we can 3D print it.

     

    After a little work over the weekend, we now have a 3D model for the Photon M3. Its based around designing three basic modules that are assembled much like the original I suspect.

     

    • 1 side Panel
    • 1 corner
    • 1 bottom panel

    Screenshot2023-04-20131615.jpg.79bd8b77de7c8e3539de2f4c97bac112.jpg

     

    After running it through the slicer I have found an orientation that will enable it to be printed whole. However, I'm not happy with its angled arrangement entirely so I have opted to print half in an orientation that will give a good result. This will also give a test of the concept and thickness of the panels etc.

     

    The Photon is currently half way through its 7 hour print time, looking good so far. I will let you know how it went on a little later 🤞

     

    Andy

    • Like 11
  10. 1 hour ago, LNER4479 said:

     

     

    PXL_20230322_210039903.jpg.2b5c66642e3208e46157bae4c36166dc.jpg

    Meanwhile, an amusing little moment as I was making my way through my own post-Manchester 'to do' list. One item read 'activate another Black 5'.

     

    Hmm ... which one shall I choose? I might have got a tad over-enthusiastic with my recent purchases. I can box shift with the best of 'em.

    Would you like to borrow 44767 again for York?

    • Like 1
    • Thanks 1
  11. 4 hours ago, Michael Edge said:

    Looks great Andy but I'm not sure I've got anywhere I can reasonably put it - it's actual position was 60 wagons and about 3 loco lengths before the WJ home signal so that both locos could take water at the same time. I can't run double length trains in the down direction but even a single load of 30 wagons with two locos is a long way back from the signal.

    Not to worry, I was using it as an opportunity to get my head around the software

    • Like 1
    • Friendly/supportive 1
  12. Been busy in Fusion 360 and going to try and print this out for Wentworth which is at the Leeds show at the weekend.

    50D0E734-A8C6-4F85-B6B7-69C057300A41.jpeg.094acb71be11e33459546bf274ec7053.jpeg

    MS&L Parachute Tank.

     

    A few extra bits to add but as it’s drawn as separate components they will be easy enough to add at a later date.

    • Like 10
  13. On 20/01/2022 at 06:59, Barry O said:

    Tonight we are holding a presentation via Zoom on "Trains running on Chapel en le Frith" how they were identified, a bit of info about other information regarding freight as well as passenger train formations. If you are interested PM me for a link.

     

    Baz

    Nice presentation, Thanks Baz

    • Agree 1
    • Thanks 1
  14. Intersting topic on twisting cables.

     

    I should point out that twisting cables will not help in any way. The principle of twisted pair relates to a 2-conductor system  which form a circuit, and are intentionally twisted together. In data transmissions this is done so that any unwanted Electro Magnetic influence affecting the cable is induced onto both conductors in the same circuit equally. The signal reciever uses an differential amplifier or filter which then only lets through intended signal and cancels out the interferance.

     

    Twisting multiple cables together of differnt systems is only likley to compound the problem as they are more likly to impart an unwanted signal on another cable.

     

    Regards

     

    Andy

     

     

    • Agree 2
    • Thanks 1
    • Informative/Useful 1
    • Interesting/Thought-provoking 2
  15. Such a shock to her the passing of Owen.

     

    A great friend and wonderful modeller. Spent many hours operating Ynysybwl Fach at shows with both Owen and John up and down the country. Can't recall Owen with a controller in his hand that often. Usually found around the front of the layout talking to friends or explaining the operation of the pit and its features to Joe Public. 

     

    RIP my friend.

     

    Andrew

     

     

    • Like 1
    • Friendly/supportive 2
×
×
  • Create New...