Northampton CMD had piles of concrete sleepers 5 or 6 wide, up to 8 high divided with sleeper batterns. Concrete sleepers turned upside down were used a roadways between the Sidings. Stacks of old and new wooden sleepers and point timbers. Skips, cable drums, concrete troughing, old oil drums, grounded van bodies, stacks of new rail, point work and block joints, piles of scrap rail, chairs, etc.
Railway vans and trucks, few private cars
Will check my photos for more ideas
Richard
Northampton CMD had piles of concrete sleepers 5 or 6 wide, up to 8 high divided with sleeper batterns. Concrete sleepers turned upside down were used a roadways between the Sidings. Stacks of old and new wooden sleepers and point timbers. Skips, cable drums, concrete troughing, old oil drums, grounded van bodies, stacks of new rail, point work and block joints, piles of scrap rail, chairs, etc.
Railway vans and trucks, few private cars
Will check my photos for more ideas
Richard