yes, ive built the baseboard and glued down the track. so just got to get a move on with the scenery. ive done little bits like getting started with the concrete road surface next to the rails but not much else.
My layouts only 5'3" l9ng so maximum length of a outbound train (powder concrete bags) is 4 cars (vga) with a loco such as a class 08 and max 2-3 with the likes of a class 66 or 37
From looking at northenden I'm getting the impression that a cement terminal is just a point at which the cement and aggregates are mixed. Tell me if I'm wrong.
I was thinking of modelling a small private one that only deals with small trains of cement and aggregates going in with a couple of trains taking bags of powdered concrete out.
Does anyone have any ideas as of what types of buildings I should put on a cement works. I've already got plans for a warehouse but I'm a bit stuck for any others.( bar the storage tanks) any ideas would be greatly appreciated.
recently picked up this Bachmann pca wagon. just a light weathering at the moment. picture doesnt really do it justice, shame it didnt pick up on the chassis weathering.