Welsh Signaller
-
Posts
284 -
Joined
-
Last visited
Content Type
Profiles
Forums
Blogs
Gallery
Events
Exhibition Layout Details
Store
Posts posted by Welsh Signaller
-
-
Deleted
- 6
-
Deleted
- 4
-
Deleted
- 2
-
Deleted
- 3
-
Deleted
- 1
-
Deleted
- 3
-
-
-
I’ve deliberately done this to give the ballast a undercoat should any chip away.
The Rails have been cleaned off so I can still run trains.
-
Deleted
- 3
-
Deleted
- 1
-
Deleted
- 1
-
Deleted
- 4
-
A few shots before I shut up for the night.
- 4
-
Deleted
- 2
-
Deleted
- 2
-
-
-
-
-
Deleted
- 1
-
-
Deleted
- 4
-
Fantastic idea, great stuff.
Wye Valley Dismantling a Railway mid 1960s
in Layout topics
Posted · Edited by Welsh Signaller
Some just for fun pictures of operations this evening.