DK123GWR
-
Posts
585 -
Joined
-
Last visited
DK123GWR's Achievements
1.5k
Reputation
Single Status Update
-
My university layout managed to get all the way to the punultimate day of 4th week. I had expected many failures by this point, but a wire on the back of the directional switch on the controller snapping was not one of them. I can still run trains, but only in one direction - not much use on an inglenook. I suppose I'll actually have to do work for the last four weeks of term.