Jump to content
 

Redkiterail

Members
  • Posts

    1,699
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by Redkiterail

  1. the layout was De Bimmelbahner (D) "De Bimmelbahner" are the builders of a huge Sachsische modulair railway with a length of at least 25 meters. The single-track winds through a romantic model landscape with several stops. The route runs over small streams, through forests and along half-timbered houses. The rolling material on the track and the motifs used make it clear that the builders focused on the DDR and Epoch III (1949-1970). In that period steam was still being driven. An eye-catcher is the bridge across the valley, which is entirely self-built. But many other lovingly designed details also show the high quality of this Hoe (1:87) narrow gauge railway.
  2. I hope to go to Ontraks in the railway museum next year
  3. as per eurspoor website There will be no Eurospoor in 2019. The next event after 2018 will take place in November 2020. The exact date will be announced in april 2019. would people like all pictures on gallery up load to this topic
  4. Here are my pictures of the Eurospoor 2018 at Utretch the next one in 2020 the layouts were very good trade was interesting, The pictures are in the gallery link below:
  5. as per model rail offers website Replacement cowcatchers with no coupling aperture
  6. Thank you for your comments if anyone want high resolution let me know and if scale four society would like to use them contact me so I can send the original higher resolution copies
  7. London overground trains will be full before west croydon, there is no physical way for the distric line to kake over nr netowkr plus there would be issues with fourth rail and modifications to the trains the tramlink scheme to be road as there is no physical space for deicate track on the line. Stations were built before modern london and had to deal with land owners qnd acess rights. Thameslink need the wimbledon to sutton section to turn back as it will allow a higher number of trains to run. Also part of the timetable issue is that wimbledon to sutton was orrginally planned to go the bays at blackfaris but the mp kept them going through the core.
  8. So two new two things to forth over then I thought the Irish prefer Guinness froth compared to Carling froth
  9. Dear Accurascale are both announcements uk or Irish or mixture just wondering
  10. There are still running until 9th it may contiune after then subject to timetable/diagrams changes
  11. there is a update shows a 3d print of the class 22 bogie and latest body shot of there ruston on there facebook page
  12. I went on a day trip to Great Yarmouth, the main aim was to get the DRS class 37s before they end on the hire contract to Greater Anglia here are my train pictures: Stratford: Norwich: Norwich to Great Yarmouth: Great Yarmouth: Great Yarmouth to Norwich: London Liverpool Street:
  13. air traffic controllers don't have electronic infrastructure on the ground to the same scale as railways. railways have track circuits, signals, axle counters, location cabinets. all attached to the ground (earthed) and are the path of least resistance any of these get struck by lighting it will cause signalling failures which no battery or generator will help with as the whole circuit gets the full discharge from the lighting strike. it can last for a few mins or could start fires.
  14. My photos need uploading that might be tonight or tomorrow evening at the earliest
×
×
  • Create New...