Jump to content
 

Redkiterail

Members
  • Posts

    1,699
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by Redkiterail

  1. Also there is import duty, cost of collecting such duty, regarding pricing under EU law it is not the same as certain German model railway magazines have different prices depending on which country the magazine is purchase the difference can be much as 5 euros
  2. that would be a qr code but requires backroom it infrastructure (servers, scanners using phone would be a bit risky and someone to set it up and maintain it) they are easy to setup to act as a way of linking website or specific pages
  3. the connection time is based on using the south corridor midway down the platform no border control when I last used it db ice trains mostly go from platforms 3 to platforms 6.if your eurostar train is running late ask the on board staff for the civ railstamp and under civ rules you can travel on the next available service
  4. addlestone models is near addlestone railway station and is worth a visit
  5. gtr stands for Govia Thameslink Railway GOvia is 65% go ahead and 35% which is Keolis which is 70% sncf and 30% Caisse de dépôt et placement du Québec
  6. Here are my pictures from the show on saturday. Numbers seam down this year got some useful bits and bobs Hornsey Broadway: Canute Road Quay: Dock Green: Hewisbridge: Croft Depot: The Mill: Hebble Vale Goods: The Summit: North Ballachulish: Burntisland 1883: Kyle of Sutherland: Herstmonceux: Kirby Stephen West: Harkness: Foxcote New Pit:
  7. So as promised got all my pictures uploaded to my flick account below are some of my highlight/ better photographs of the event First day of the event I went down to catch one of the first departures so here are some pictures of Trier HBF station One of the class 52 locomotive was not ready for service so my train was powered by a class 211 diesel shunter After the incident that occured the planed moves were changed so I travelled behind one of the class 52 locomotives up to Bitburg Second day Class 52 to Nennig then back to Trier, then a trip to Luxembourg on the CFL steam locomotive and back finishing with the class v200 run to Saarburg and taking a rb emu to Trier and catching the Steam Locomotive to Schweich and get the E10 Locomotive back to Trier Third day a trip on Class 103 Eletric to Brhotl and change onto the Brhotlbhan Fourth day was a catch up day and final day of the steam festival I missed out on the postal wagon and one of the steam locomotives due to a service train not running from Gerostien had a extra run behind the v200 and e10 Last two pictures of my trip home train all the way to London: flickr album links https://www.flickr.com/photos/redkiterail/sets/72157694757227641 https://www.flickr.com/photos/redkiterail/sets/72157693365568522 https://www.flickr.com/photos/redkiterail/sets/72157694776459431 https://www.flickr.com/photos/redkiterail/sets/72157666734875617 https://www.flickr.com/photos/redkiterail/sets/72157695970630694 https://www.flickr.com/photos/redkiterail/sets/72157696004838844
  8. I have my pictures to upload to flickr and I will add the better ones here my first event and I will go again if it happens again
  9. nope they did two variants of the livery first full blow second when the loco had reduce lining
  10. Do we take the production schedule to be class 22 ruston then class 50 just so I can save in time for my purchases
  11. Also the factory and court process is in Scotland under roman law not English common law
  12. I believe the kits are built to order so there maybe no actual stock to sale for last order also this is going through a court process not a sale to other party which may change what can and cant be done
  13. problem is St Pancras the only long platforms which can accommodate the current make up is the international platforms with different non uk signalling system and security issues. the other platforms are only slightly longer than a emt hst. Kings cross they will have reduce the train length to fit and also need paths on the north london line to reach wembley depot for servicing The current system for the highlander is that one driver takes the train to Preston where a driver change happens then the shunt moves at Edinburgh then separate drivers for at least 2 parts of the train. The lowlander will have a similar method of working where one driver will work it then change before the shunt at Carstairs. There is no rule but only 3 platforms at Euston fit the current sleeper formation and then one of blocks other lines when at Edinburgh they use platform 7/11 as all the carriages fit into plus room for the shunt moves. The only way for Kings cross or St Pancras to be its london home is to reduce the train length which would in all case increase fares to cover the reduction in train length. When the train leave Euston is path around the last day trains with loop stops to allow class 390 to pass by and for engineering works to take place as its the last train before the block is put on or go through a diversion route in one hit. You could run two trains one on the ECML and one on the WCML put will have to be planned around the engineering works which is around six months in advance and it has been know for the sleeper to use ECML during a big blockade and or more than weekend works and even some weekend works if there is no other option. The Inverness portion waits in a loop for the Up Highland Chieftain to pass it so it can use the same platform at Inverness. Serco will run under the existing model until the new Mk5 sleeper stock and class 73/9 and class 92 with mods are running with with out incidents before trying other routes or concepts So any new routes or train formation will have to be checked with Virgin WCML who ever takes over the ECML gbrf who supplies locomotives and drivers
  14. as per my previous website the message is that its under schedule message if you highlight yellow band of colour people will see it
  15. according to companies house the company is still active if it was liquidated it will be struck off the register of companies
  16. I am not involved with the company put the following message is on their website We are currently performing some scheduled maintenance. We will be back as soon as possible. Please check back soon.
  17. a 303 emu is persevered on the bo'ness and kinneil railway
×
×
  • Create New...