Jump to content
 

eldavo

RMweb Premium
  • Posts

    1,258
  • Joined

  • Last visited

  • Days Won

    5

Blog Comments posted by eldavo

  1. 17th May 2009

     

    This week I've mostly been fiddling around with the Tower 02 kit, the ebay gem. Of course when I put an order in for several grades of solder which is the one that is on back order, the 70 degree for use on whitemetal. Impatient as ever I decided to assemble the castings using adhesives, 5 minute epoxy for the large bits and gel superglue for the details. All has gone together without any problem and the only laborious bit was drilling holes for the numerous handrails and handles that have to be bent up from brass wire.

     

    I've added a few other bits and pieces along the way that weren't in the kit, lamp irons, extra handrails on the front steps and sanding pipes, but otherwise the kit is as intended (I think!). The rear handrail is extremely vulnerable and the kit provides pewter stanchions for the uprights. I didn't think these would be man enough for the job and the prototype appears to have uprights made from the same tube as the handrail so I soldered something up from brass wire.

     

    Here she is ready for the paintshop which is where she has been today...

     

    021_17May09.jpg

     

    022_17May09.jpg

     

    Cheers

    Dave

×
×
  • Create New...