  1. Passed today on the way to the chaos of a New Year Eve shop in L Eclerc and the railway bridge is complete rail laid and ballasted
  2. Passed today on the way to the chaos of a New Year Eve shop in L Eclerc and the railway bridge is complete rail laid and ballasted
  3. As a Hertford lad train spotting in the 70's would have love to have done the tour l must make the effort to take a ride in one of the units enjoying the sunny south coast
  4. DREAL have posted a video dated 23rd September but it clearly dates from much earlier in the year http://webissimo.developpement-durable.gouv.fr/IMG/mp4/video_rn_141_roumazieres_exideuil_cle03fbd3.mp4
  5. Having been through the works over the last fortnight I don't see any progress In fact nothing seems to be being done And doing the lanes nearer Chabanais there is no sign of any progress since clearance of trees last year One would draw the conclusion that the road project has been put on hold (highly unpopular) which then would mean no railway reinstatement for some time The other RN141 dualling project just West of Angouleme is still in progress.
  6. The 2eme Salon National de Modelisime Ferroviare is on today and tomorrow at Bugeat (40 mins SE of Limoges) www.hce19.fr For more details We went today and it is predominantly N gauge Also made the error of arriving at 1230 so most of the layouts were unattended with either nothing running or token trains circulating The best layout by far for us was an On30 USA forest layout with some link to little house on the prairie actress who played one of the Olsen Security was very evident bag search and metal detector Sorry photos on camera so will have to wait till we return to get uploaded Colin
  7. Drove over today and both the old road and railway have been severed. The pillars are being built for the road bridge that will take the old 141 over the new 141 bypass. i assume the pont rail will be after as building the rail bridge first would hinder the road bridge construction not it sure of timescale as closer to Chabanais the road site seems to be no further forward than it was in December Colin
  8. http://www.nouvelle-aquitaine.developpement-durable.gouv.fr/IMG/pdf/presentationoperations_rn_141_nov17.pdf Around slide 30 refers to the point rail. Seems the new bridge will be slid in colin
  9. Thanks Jamie for confirming that yes the plans for the 2x2 dualling show parallel road and rail bridges Its a very deep cutting much deeper than I thought necessary especially as the road will come from higher ground to the south. Maybe mitigation for the local residents. Colin
  10. We will be there next week as long as the surgeon can get my wife's stent in her bile duct out without problems on Friday (long saga and to be honest I'm just grateful she is alive and recovering) as we are close I'll try and get some photos I did see an aerial view and it seemed to show the temporary road rn141 deviation had been removed jeff. I don't think anyone thought sncf deliberately wanted to close the line just that the cost may have been prohibitive regards colin
  11. With his moniker of Johnny Walker it appears he has imbibed too much of his namesake Good to see the response from Boris being measured might the review go back to the speed question
  12. The RN141 work is at Roumazieres needs a rail over road bridge we were supposed to be over in July but had to cancel due to wife being critically ill so I haven't been to see how far they have got with it but I would that was funded as part of the project i cant think where else there needs to be a bridge. The one at Chassenuil is already there and I thought part of the existing dual carriageway colin
  13. Its not the polymers that migrate but the additives if the solubility parameters of the polymer and additive are aligned then the additive will preferentially migrate from one polymer to another this can cause the donor polymer to lose the additive and become brittle whilst the recipient is softened back to styrene materials and photo oxidation will cause chain scission so in effect the long chain polymer breaks down into shorter chains . This then reduces the physical strength of the material and eventually they become weakened Colin
  14. Environmental Stress Cracking is a known issue with certain polymers UV degradation is also known Plasticised materials eg PVC faux leather will suffer from the loss of volatile additives All sorts of factors can apply there was a lot of work on why blue milk/beer crates didn't survives as long as red...turned out the pigments allowed crack propagation I'll need to go back and try and find my 40yr old text books to get the details for styrene polymers ....I think plastruct is styrene based Colin
  15. Thanks Paul Its a bit freelance as an easy to set up layout The original plan I recall only having one platform and all the lines pretty close to each other And to upset the pedants even more I will probably end up with Bernina stock also on the layout in an ideal world I'd do Morges with an impression of the BAM line . Any line that has Biere and Apples in its title has to be good. Morges is where our HQ was based until we moved it to Budapest oh oh and of course a BR late 70's Eastern region layout So this one is something achievable in a relatively short time One question to be answered is DC or DCC both the loco and railcar I have are DC but ideally I would like to be DCC
  16. After having to give up on my impression of Ipswich when we moved house 7years ago I needed to find something more manageable Having had a Bemo starter set there was an obvious option and the web was searched for ideas On gleisplan.ch a few years ago was a 8*3 layout comprising a terminus with a line looping down to hidden siding The 8*3 was too big for the space I had and I played with the terminus plan to see if I could accommodate in a smaller space Two 4*1 Tim Horn scenic boards provide the basis The concept is that the viewer is stood on the platform serving the loop so avoiding the need for station buildings
  17. We are Chabanais (Foulounoux to be precise on the Chirac road) also (albeit holidays only. suggest you talk to the team at Confolens l'association Chemin de fer Charente Limousine who are restoring the line but also have English members . They may be able to provide details of anything more local Regards colin
  18. Sorry I read it twice but completely missed that probably because was on phone and scrolled too fast A politer response would have been sufficient to alert me to my omission
  19. Interesting I presume there is some form of check to prevent misuse. IE you have to show an invitation letter https://www.bbc.co.uk/news/education-48965585
  20. stupid question...whereabouts in Poole is this we do visit Poole from time to time (I ve been coming to Poole virtually all my life 55 yrs Poole park probably played a part in my love of trains parents would take us round the pottery. The original shed )
  21. The arrangement of the suburban platforms and track has always appealed tome as an alternative to Minories
  22. How dare anyone criticise the beautiful beast that is a 313 I even once wrote a poem about them . It was 1976 they were new though ;-)
  23. Just a couple of observations from yesterday as First time visitors Having come into the main area where the restaurant is we had to ask someone in the lunch queue to find out where the exhibition was as its in a second hall. Couple of signs would have been beneficial On entering the hall we were hit by overwhelming heat. Now that may have been because having been out shopping in Fareham we were cool from the wind but it seemed to be very hot Found the layout of the exhibition very good with all the main layouts in the middle and traders around the edge. I know many exhibitions follow this approach but combined with arriving at a quiet period everyone at lunch made negotiating the exhibition very easy regards colin
  24. To add to the traversed options this popped up on you tube ok larger scale but about half way through a sort of hybrid traverser
  25. Eurotunnel yesterday signed a contract with Bombardier to refurbish the nine passenger rakes Photograhic impression on the Railway Gazette site .. I haven't been able to find the original Eurotunnel link. In in service from 2022 onwards
×
×