YES,,,,,,YES,,,,,YES, 😃 There is 🙄 = Its still here. 😁.
Not worked on it for a bit, but my mate Kevin came down two weeks ago, and we had a really good all day running session, (after a really good Weatherspoon's breakfast), and not one Train did a full circuit continuously. It was works as intended, = Fiddle Yard "A" to Yard avoiding loop, and back to second F/Y "B". 2nd F/Y "B" to lower Yard, dethatch Loco and shunt stock into sidings or other Roads to make up New Trains. NSE 117 was run between services only on the upper Station section, and either through or back. Each of the above Freight moves were done with Trains running in opposite directions. and it took about 5 hours to do all we had to do, and still didn't move everything. It has potential, but still busy with the Bands and playing 2 or 3 nights a week sometimes.
I WILL BE BACK. 🤪 👍