This is a bit of a catch up. So this is as the pictures were uploaded not as I made the parts.
The sides cut out, the height above the door still needs to lowered.
Cab front and rear were joined and then worked on.
Here are the parts so far.
Footplate was cut out. I did get the front cut out slightly wrong but it won't be seen in the final form.
The drop irons and the buffer planks were next, except the buffer planks are a little camera shy.
Frames and splashers filed up.
Then the frame spacers. From left to right.
Cylinders, motion bracket, firebox bottom, bogie mount, and rear fixing.
The front and rear steps, along with the buffer planks.
Finally for now the front and rear guard irons.
- 4
- 3
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now