Jump to content
 
  • entries
    58
  • comments
    24
  • views
    8,531

About this blog

Started in 2004, this layout was originally an end to end with a run-round loop and a bay platform. It now forms part of double track layout. I built it in the early days when I hadn't really taken into account moving it about so its 2m long and about 630mm wide. However it has been moved about 5 times from house to house. It started as an analog layout and then was converted to DCC, then lots of wires for everything were added but in 2020 I discovered MERG and CBUS so its be re-wired again which has simplfied the underboard somewhat. The original layout consists of baseboard 1. But following another move I am now adding about 12 new baseboards to it plus a rear upper deck

 

Layout is in an insulated loft ontop of kitchen base units for storage.

 

Its not prototypical but wouldn't look out of place for a somewhere place for somewhere in the GWR / Midland territory. The station on baseboard 1 does have Great Central influences as is scratchbuilt. I like running GWR/ LMS / LNER and BR Standard steam locomotives, plus early diesels so its the early 1960s on the lower deck. The top deck is intended to be 1960s to 1990s but will retain semaphore signalling. It could also be a double track heritage railway......

Entries in this blog

Baseboards (again)

So I had to have a think about the priorities.   Priority No1 is get (at least 1) train running around the room.  Priority No 2 is get a 2nd train running around the room   In order to do priority No 1, I need to knuckle down and build base boards. So for the moment all work on wiring, electronics and other railway modelling projects is paused and the main thrust of action is to get the lower deck baseboards and the top deck constructed. As its at the back the top deck (

MattB

MattB in Baseboards

A new baseboard

Cleaning of locos and rolling stock has been ongoing, plus using the new mini vacuum to clean up loose dust and grit.    Started work on my CBus Canpan after deciding that this would be better than using the Canace8c as that doesn't have enough inputs. Work has slowed down a bit on the cbus but that is because i now have trains running. Plus i wanted to get the corner boards in before working out where the control panel is to go.   So for a week or so i have been thinking abo

MattB

MattB in Baseboards

Baseboard plank

I had a good session yesterday afternoon. For the last couple of weeks is been a bit hot in the loft - bearable due to the insulation but still a bit hot but yesterday it was back to normal room temperature.    With the re-wiring now substantially complete I decided to get the layout horizontal so I could easily take stock of all the knocks it has taken over the last couple of years after being moved around several times. I didn't want it in place yet as I wanted to build a 'plank' nar

MattB

MattB in Baseboards

×
×
  • Create New...