Aldgate Box Boy
Members-
Posts
322 -
Joined
-
Last visited
Content Type
Profiles
Forums
Blogs
Gallery
Events
Exhibition Layout Details
Store
Everything posted by Aldgate Box Boy
-
Hi everyone, The picture is a poster I have made up for the side of the power station promoting the brewery's product. This will be the last post from Green Leaf. I'm giving up because of the stupid pop ups that keep appearing on this site. I post on the Gauge 0 Guild site if people are interested. Thanks for all the interest and comments over the last 3 or 4 years. Cheers Tim
-
Hi All I have had some transfers made up for Green Leaf, here are the NG locos and wagons Cheers Tim
-
-
Hi All, some pictures of the new loco with its chassis and with the other NG locos I've made up over the last year. The middle loco was the first made from a Smallbrook kit. The one on the right was a scratch build in plastic. Cheers Tim
-
-
Hi all, not the most interesting post but I've made a tool box and a couple of sand boxes for the NG loco, really enjoyed making them cheers Tim
-
Hi Dougal, it's not a kit, I'm scratch building it and it's a freelance design. This is my first brass scratch build. Cheers Tim
-
-
-
-
Hi All, I've been making some vats for the Vat House. Bit of an indulgence as they will hardly be seen. I still need to wood stain then Cheers Tim
-
Next NG loco build Hi All, just begun my next NG loco build a freelance scratch build in Brass on a Hornby chassis. cheers Tim
-
-
-
Hi Giles, lovely locos. Can you tell me where they are from? I recognise some but where is the Peckett from? Cheers Tim
-
-
-
-
Hi All, track now laid in the East Yard. This serves the cooperage, the barrel wash building and the new bottling plant. Droppers in but not wired up. cheers Tim
-
Vat House Hi All, I begun work on my next building a Vat House for Green Leaf. Here are the photos of the foam board frame assembled. Cheers Tim
-
Hi All, more progress on the track laying. The dual gauge section is enjoyable and slow. The Butanone adhesive didn't seem that effective so I went for superglue, which seems to work well. the first picture shows the two dual gauge lines. One on the left is the power station road. The R/H is the through road. Second picture shows the Power station in place. Just at the end of the through road is where the gauges will split with a narrow gauge section and a simple standard gauge siding for the engineering shops. The final picture looks back up the line. Cheers Tim
-
Hi All, laid the first stretch of Dual gauge in the layout. Quite straightforward - curves will be more problematic. Cheers Tim
-
Hi All, I'm currently playing around with sight lines/ scene blockers for the rebuild. I thought people might be interested in the ideas. cheers Tim
-
Hi everyone, bit more progress on the layout rebuild. Backscene primed and I've posed some of my old building on the layout to get a sense of what goes where. Cheers Tim
-
Hi here are are some pictures of the track laying and the back boards roughly fitted in place Cheers Tim