toffee Posted May 23, 2016 Share Posted May 23, 2016 Has this been noted yet? http://www.tpexpress.co.uk/news/2016/05/more-new-trains-for-the-north-and-scotland/ Scroll down to halfway, let the froth begin ! 3 Link to post Share on other sites More sharing options...
Glorious NSE Posted May 23, 2016 Share Posted May 23, 2016 Whoa!So, three new fleets in total, the Hitachi bi-modes initially announced, plus CAF EMU sets, plus CAF hauled stock to work with class 68s.Blimey. Link to post Share on other sites More sharing options...
'CHARD Posted May 23, 2016 Share Posted May 23, 2016 Whoa! So, three new fleets in total, the Hitachi bi-modes initially announced, plus CAF EMU sets, plus CAF hauled stock to work with class 68s. Blimey. Blimey indeed! I didn't see the LHCS coming - fantastic!!!! 3 Link to post Share on other sites More sharing options...
Talltim Posted May 23, 2016 Share Posted May 23, 2016 (edited) Civity sounds too much like a small, lithe-bodied, mostly nocturnal tropical mammal with bad teeth to me... Blimey indeed! I didn't see the LHCS coming - fantastic!!!! No yellow ends? Edited May 23, 2016 by Talltim Link to post Share on other sites More sharing options...
Glorious NSE Posted May 23, 2016 Share Posted May 23, 2016 I guess we're talking about a push pull set with a driving trailer, and presumably day coaches following on from the Caledonian Sleeper order.Having been in Scotland last week shooting 68s on the Scotrail workings, they even make a nice noise. 9 Link to post Share on other sites More sharing options...
Glorious NSE Posted May 23, 2016 Share Posted May 23, 2016 Civity sounds too much like a small, lithe-bodied, mostly nocturnal tropical mammal with bad teeth to me... No yellow ends? Or a rather cheap and nasty city car... If they are doing without yellow ends on the Hitachi sets they may use the same new safety case logic on the new stock - i'd suspect the 68s will retain them though. Link to post Share on other sites More sharing options...
tamperman36 Posted May 23, 2016 Share Posted May 23, 2016 Yeah ! back to real LHCS on the pennines, might have to start spotting again. Once its electrified will we get the 88s instead or is it a way of getting out of electrifying the Leeds to Manchester section Link to post Share on other sites More sharing options...
Zomboid Posted May 23, 2016 Share Posted May 23, 2016 I imagine the LHCS will be modern versions of the 4TC, and will be electric hauled in due course. Though one odd thing is the suggestion of 125mph - will 88s go that fast? Pretty certain that 68s can't at present. Link to post Share on other sites More sharing options...
RMweb Gold russ p Posted May 23, 2016 RMweb Gold Share Posted May 23, 2016 68s can be reconfigured to do 125 Link to post Share on other sites More sharing options...
Glorious NSE Posted May 23, 2016 Share Posted May 23, 2016 Once its electrified will we get the 88s instead or is it a way of getting out of electrifying the Leeds to Manchester section It does at least give an upgrade path as and when it is wired. Link to post Share on other sites More sharing options...
'CHARD Posted May 23, 2016 Share Posted May 23, 2016 If they are doing without yellow ends on the Hitachi sets they may use the same new safety case logic on the new stock I think the no yellow ends comment was in response to my 'I didn't see that coming,' rather than a statement of design intent!!! 1 Link to post Share on other sites More sharing options...
RMweb Gold russ p Posted May 23, 2016 RMweb Gold Share Posted May 23, 2016 I think the 68s are to be used on Middlesbrough services Link to post Share on other sites More sharing options...
RMweb Premium Reorte Posted May 23, 2016 RMweb Premium Share Posted May 23, 2016 I think the 68s are to be used on Middlesbrough services Aw, nowhere near me, I was looking forward to something new for a moment! Link to post Share on other sites More sharing options...
Edwin_m Posted May 23, 2016 Share Posted May 23, 2016 I think the 68s are to be used on Middlesbrough services It says in the link that these are initially for Liverpool-Newcastle. Which makes no sense as far as I can see, considering that service has the most "under the wires" running of any using the North TP route so would appear to be a natural choice for the bi-modes. I suspect also they will be slower than the 185s they are replacing, at least south of York. Link to post Share on other sites More sharing options...
RMweb Gold russ p Posted May 23, 2016 RMweb Gold Share Posted May 23, 2016 I think to be honest they will be faster than the 185s which are about 700hp per car now they have been debated. Quite often a car is switched out. The 68s are VERY fast sub 20sec to 60 light engine and about 8sec 50 to 70 when accelerating. I reckon the new coaches will be about 35t so with just 5 on they are going to be fast. 1 Link to post Share on other sites More sharing options...
RMweb Gold SHMD Posted May 23, 2016 RMweb Gold Share Posted May 23, 2016 Isn't there a plan to extend the Liverpool-Newcastle services to Edinburgh? Replacing just Locos is a cheap upgrade to electric trains. Kev. 1 Link to post Share on other sites More sharing options...
RMweb Gold russ p Posted May 23, 2016 RMweb Gold Share Posted May 23, 2016 If staff were taught to act like railwaymen instead of falsely smiling androids trains can change from diesel to electric in about 5 minutes! 1 Link to post Share on other sites More sharing options...
Clay Country Posted May 23, 2016 Share Posted May 23, 2016 It says in the link that these are initially for Liverpool-Newcastle. Which makes no sense as far as I can see, considering that service has the most "under the wires" running of any using the North TP route so would appear to be a natural choice for the bi-modes. I suspect also they will be slower than the 185s they are replacing, at least south of York. My understanding is that Liverpool - Newcastle will be loco-hauled from 2018 with the Hitachi bi-modes taking over from December 2019, enabling the 68s and CAF coaches to move to Liverpool - Scarborough and Manchester Airport - Middlesbrough services. Link to post Share on other sites More sharing options...
Glorious NSE Posted May 23, 2016 Share Posted May 23, 2016 I think the no yellow ends comment was in response to my 'I didn't see that coming,' rather than a statement of design intent!!! Well done Tim - I plainly didn't see that coming. Ref HP - some assumptions and relying on wikepedia stats here, but: 68 = 85t Coaches = 35t x 5 (using Russ's figure) Whole train = 260t HP = 3800 HP/T = 14.62 185 = 168t (Max) HP = 750x3 = 2250 HP/T = 13.3 So if those are somewhere close it should be a bit more powerful overall configured as a loco + 5, and a lot more powerful on those bits where the 185 derates itself! Link to post Share on other sites More sharing options...
Zomboid Posted May 23, 2016 Share Posted May 23, 2016 If staff were taught to act like railwaymen instead of falsely smiling androids trains can change from diesel to electric in about 5 minutes! Is that with auto couplers? I think some preserved operations allow 10 for a run round and departure, though for a National Network operator you'd need to allow a bit of slack in case the couplers got out of bed on the wrong side. Link to post Share on other sites More sharing options...
RMweb Gold russ p Posted May 23, 2016 RMweb Gold Share Posted May 23, 2016 Is that with auto couplers? I think some preserved operations allow 10 for a run round and departure, though for a National Network operator you'd need to allow a bit of slack in case the couplers got out of bed on the wrong side. No its called getting stuck in and getting dirty! When I was younger and fitter could multi up a pair of locos in less than 30 sec its all technique. But the instant a train stops , a shunter cuts the loco off, off it goes and another comes on, as the driver changes ends the shunter ties on, the guard is at the back, brake test done, right away off we go! Link to post Share on other sites More sharing options...
RMweb Gold russ p Posted May 23, 2016 RMweb Gold Share Posted May 23, 2016 Well done Tim - I plainly didn't see that coming. Ref HP - some assumptions and relying on wikepedia stats here, but: 68 = 85t Coaches = 35t x 5 (using Russ's figure) Whole train = 260t HP = 3800 HP/T = 14.62 185 = 168t (Max) HP = 750x3 = 2250 HP/T = 13.3 So if those are somewhere close it should be a bit more powerful overall configured as a loco + 5, and a lot more powerful on those bits where the 185 derates itself! Havent the 185s been permanatly derated to save fuel ? The 68 seems pretty good on fuel so i reckon it will be cheaper to run Link to post Share on other sites More sharing options...
Zomboid Posted May 23, 2016 Share Posted May 23, 2016 Presumably if 68s are proving useful and reliable, Chiltern might be looking at the LHCS order as well? Don't know how good their mk3 sets are proving to be, but I'd be shocked if they didn't ask the question amongst themselves. Link to post Share on other sites More sharing options...
Fenman Posted May 23, 2016 Share Posted May 23, 2016 Is that with auto couplers? I think some preserved operations allow 10 for a run round and departure, though for a National Network operator you'd need to allow a bit of slack in case the couplers got out of bed on the wrong side. Why would a national operator need longer than a preserved operator? Great Northern splits and joins stock at Cambridge at least every 30 minutes throughout the day. Irritatingly, trains are usually scheduled to spend about 5 minutes just sitting in the platform, presumably in case there's a problem. I can count the number of failed couplings over the last 5 years on one hand, and still have fingers left over. Paul 1 Link to post Share on other sites More sharing options...
Zomboid Posted May 23, 2016 Share Posted May 23, 2016 Didn't mean a National Network operator would need longer, more that I've seen more complex moves than joining 2 trains take place in 10 mins. Though, given the financial penalty associated with train delays, if I were a TOC I would be allowing plenty of time for it, to try and eliminate delays from earlier in the journey and to allow for the coupling to not be in a rush. Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now