RMweb Premium MJI Posted January 1 Author RMweb Premium Share Posted January 1 Both doors done, that took ages Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted January 1 Author RMweb Premium Share Posted January 1 7 Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted January 7 Author RMweb Premium Share Posted January 7 Due to lighting and other things, not done loco this weekend. Working on a number of kits. Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted January 28 Author RMweb Premium Share Posted January 28 Tidied up the solder, sorted the splashers, will need some P38 to het perfect, refitted right tank front. Will be current weekend project. Not yet got a magnifier , but running -2.5 on my IOLs helps. Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted January 28 Author RMweb Premium Share Posted January 28 So that will be 41900 This will be 58071, both Gloucester and Ashchurch based tanks. The chassis, urghh. 1 Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted February 18 Author RMweb Premium Share Posted February 18 Rear footsteps Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted February 18 Author RMweb Premium Share Posted February 18 Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted February 24 Author RMweb Premium Share Posted February 24 Roof on, now found I need 0.7mm drill so paused on chassis for a week or two One tank filler melted, plastic card replacement required, will use spare etch for missing footstep. Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted March 10 Author RMweb Premium Share Posted March 10 3 Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted March 10 Author RMweb Premium Share Posted March 10 Will do handrails once the glue has dried. Still too many 0.7mm holes to drill. Plenty of clear piccies of the buffer beam and to see differences between the kit and the real one. Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted March 31 Author RMweb Premium Share Posted March 31 Working on another mineral wagon rake. Was looking at buying about 15 Airfix kits and doing top flap and vb. Too expensive now. So trialing ABS like resin, rather good, but my exposure was too short. Will repeat tomorrow. Using ironmink stls. 41900 is now at wheel time. But brake gear fouls. 2 Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted March 31 Author RMweb Premium Share Posted March 31 I now need a 40, any ideas of the various models? Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted April 7 Author RMweb Premium Share Posted April 7 I am now working on a mineral wagon rake. 34 16t minerals. 10 MCV 20 MXV or MCV with Morton 4 10ft MCV This will be a lot of redin and LMS buffers. So far 1 in paint, 1 near complete, 2 parts collected. 6 good MCV prints, and 2 10ft. Iron Mink has done MXV .stl and i will start on these next weekend. Now transfers. Need a lot 34 16t mineral, 4 MDV , most of a pool MSV. Who does pool numbers and bigger tops boxes. Took me ages to decypher my notes. Dome mad person wrote down all running numbers, tares, brakes, tops codes. All were NTF no top flap, but i could not remember NT, until last night. No TOPS, as in no boxes. Currently in works. Ex GWR branch corridor set, 1 vehicle being soldered. Ex LMS BT Ex LMS hoppers 6 done out of 12, 6 to print. BR 1 2A 2D 2E 2F set half done, sprayed 2E TSO yesterday grey. Clayliners Various pre 64 vans 2 mineral rakes Mixed hopper, mineral, tube rake Stone rake. Layouts stalled in case we move home, as may downsize. 1 Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted April 11 Author RMweb Premium Share Posted April 11 Steve from Railtec has come through 2 custom sets for Pool 7603 MSVs Ordered the 47 to go with them. Will be my 34 minerals next and my Clayliners. Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted April 13 Author RMweb Premium Share Posted April 13 Minerals under construction Clayliners 2 Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted April 14 Author RMweb Premium Share Posted April 14 Link to post Share on other sites More sharing options...
RMweb Premium MJI Posted April 14 Author RMweb Premium Share Posted April 14 3 MCV in paint. 1 MXV 10 in paint, 1 MXV 10 complete, 3 MCV in works, 4 MXV 9 in works. I need to print more MCV brakes, 2 more MXV 10, and work out MCVs still required. More wheels and buffers soon. Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now