Jack00 Posted March 21, 2012 Author Share Posted March 21, 2012 Long time no progress on this, i was looking through all my other project threads, and for some strange reason i keep getting drawn into N gauge, all my stock is on the window ledge staring at me when ever i open and close the certains. so with some left over bits and peices, i made my way through the railway room, stepping over the half finished/condemmed projects. and come up with this... same idea as before, 1up and 1down mainline, but this time i have encorporated the fiddle yard with the main scenics section. allowing a continuous run of trains. in the pictures there is only 1 track seen, i had to lift the other one up as it had been damaged and was out of gauge quite alot which then derailed most of the trains. But since the pictures were taken its been replaced and fixed down in place. But work carried on...the backboards are drying in place after being glued, the greenary glued into place. the tunnel mouths glued aswel. I also recycled a few bits and bobs, such as tree's and bushes, also some shrubs. when the second line is fixed, and working again, ballesting can be done and rest of the scenary, then finally will be the nitting!! OHLE with wires! either a hand-made attempt or dapols version. i must dig out some more stock aswel. Thanks for looking! Jack. Link to post Share on other sites More sharing options...
Jack00 Posted July 3, 2012 Author Share Posted July 3, 2012 http://www.youtube.com/watch?v=e1Bhg4tCVVY&feature=youtu.be 67022 heads the scotrail sleeper with 66098 dead on the rear. Network Rail are repairing this section of line. with a TSR of 70MPH Jack. Link to post Share on other sites More sharing options...
Jack00 Posted July 3, 2012 Author Share Posted July 3, 2012 N gauge is so much more rewarding for me...can't put my finger on it but watching the long trains screach past is satisfying lol. Ex-FNW class 150/1 shuttles past Network Rails 31602 is seen passing on an engineers train, lets hope they fix the track...!! Jack. Link to post Share on other sites More sharing options...
Jack00 Posted July 3, 2012 Author Share Posted July 3, 2012 Defanatly need an 86 and DVT virgin mk3 rake or HST. But need to get the down line sorted, 3rd radius as the 67's derail on the up (1st radius) and mk3s struggle to hang on aswel. Jack. Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.