-
Posts
501 -
Joined
-
Last visited
Content Type
Profiles
Forums
Blogs
Gallery
Events
Exhibition Layout Details
Store
Everything posted by Wayne Kinney
-
- 474 replies
-
- 10
-
Hi Martin, Thanks. Aware of it and again these are the first revisions of the castings. Removing that metal does make it more fragile and prone to either warping or bending. All I will say is I'm working with the 2mmSA on this. I am trying my best to provide them with the best possible product, with daylight through the cast crossing rails (including the web relief in the side of the rail to represent the web of BH rail, as I've always done on my N Gauge kits). They have shown very positive interest. I really enjoy working with the societies, and bouncing design ideas off each other.
-
Hi Guys, Not 00 or EM but thought it might be interesting. Master patterns for both 2mm Finescale and 3mm Finescale crossing frogs, ready to make moulds from. Pictured next to an EM Gauge crossing frog for size comparision. The 2FS one is a 1in7, the 3mm one 1in6. The 2FS one is tiny, I'm not even sure if it's castable but certainly going to try!
-
Hi Frank, Many thanks for sharing! Seems to be running nice a smoothly through that formation, very nice track laying! You mention height difference, was that just with the ply sleepers, not the Peco track, right? Also, have you polished and blackened the cast crossing frog as per the instruction? This really improve it's appearance. All really nice
-
What Gauges do I need for hand building track?
Wayne Kinney replied to Tortuga's topic in Handbuilt Track & Templot
Ah! Half price! -
I manufacture a set number of kits per working day (Mon-Fri). The items will be available ongoing and not in ‘batches’. Despatch times are usually 1 -2 working days from order, but maybe longer on a newly released kit with highly anticipated demand. P.S - Sorry, still working on the A4 templates (very busy..LOL)