Hi everyone,
I decided to put a few hours in on the track laying for OEC, and like most things when you plan what you want, you still change things.
This resulted in a few 'different' ideas that i've now incorporated into the layout.
I have also used a 3 way point, more as a way of experimentation than anything else, and although its not a perfect solution for what I needed it's going to do a job. Besides its RULE 1 so its there now!
All points are wired from the toe, and isolated at the head, with red/black droppers in situ for testing properly. So far all runs as it should and looks quite fascinating threading a loco through the various roads.
Anyway, the next thing is to complete track laying to the turntable, through the sheds, holding tracks around the turntable and a complete test before track weathering. (anyone got one of those delightful wheel and jar rail painter things they can hire me for a week or so?)
Then it's onto laying the concrete (plasticard covered in matt board weathered) between rails before ballasting and starting to add details, back scene etc.
The footbridge is still awaited from CRS who are very busy at the moment but will fit perfectly when it arrives and I am after a decent girder road bridge for the depot entrance linking the town (front right) with the town (back middle).
Anyway, as always, I love to pre-visualise things, so I have dressed the layout with loco's for a general 'feel' of how its coming along and could possibly look.
Enjoy the pictures, and feel free to comment and suggest.
Cheers
Dave