Jump to content
 

Darius43

RMweb Gold
  • Posts

    4,443
  • Joined

  • Last visited

Everything posted by Darius43

  1. Buffers etc. and corridor connection bellows added. Cheers Darius
  2. Have you checked that the “dog bone” (the small plastic shaft that connects the motor to the gearbox of the motor bogie) is still engaged. If it has become dislodged or missing then the wheels won’t turn. Cheers Darius
  3. Glazing, blinds and curtains fitted. Cheers Darius
  4. The right colour sequence, quick drying paint and careful masking. - Cab front first: Halfords white primer followed by a couple of light coats of Halfords Mustard Yellow. Leave for two hours. - Mask the cab with paper barrier pieces to minimise masking tape (Tamiya) contact with the yellow. - Airbrush the roof with thinned Humbrol Matt 106. - Wait an hour then spray with Army Painter Matt Varnish. - Mask the roof (previous cab masking stays in place)and the inside of the cab (to guard for overspray) then airbrush thinned Phoenix Rail Blue enamel to the sides and ends. Cheers Darius
  5. Drat. You’ve uncovered my cunning plan. Darius
  6. Railtec decals already obtained. Cheers Darius
  7. It looks to me like some kind of steampunk catapult. Cheers Darius
  8. Hi John, No need for the flowery language - that joint just keeps a poppin’. How’s your modelling going? Cheers Darius
  9. Both coach chassis completed. Body painting next. Cheers Darius
  10. Test dolly completed - hopefully a bit better than the MTK supplied parts. Cheers Darius
  11. Scratch built testing dolly - almost complete. Cheers Darius
  12. I wasn’t happy with the cast detail on the MTK cabs so I have cleaned up the faces. Cheers Darius
  13. Driving motor coach chassis constructed. Cheers Darius
  14. Roof vents and door furniture fitted. Cheers Darius
  15. Coach end joints filled and blended into the bodywork. Roof ribbing scribed in place. Cheers Darius
  16. MTK 2-HAL Stores Unit just completed. Cheers Darius
  17. We seem to be caught in a temporal causality loop. Cheers Darius PS - nobody can see the pictures as they were all lost in an IT failure a few years ago.
  18. Coach doors scribed in. Cast cabs and rear ends fixed in place. I’ll let the glue cure overnight. Much filling and sanding awaits… Cheers Darius
  19. Next on the bench is this MTK version of the BR Derby Lightweight Ultrasonic Test Train. I already have a set of Railtec decals for it. Spot the use of press studs in the test wheel assembly mouldings. Cheers Darius
  20. So with respect to the original topic, just to recap:- - WCRC has now provided rake(s) of MK2 coaches with CDL fitted for the Jacobite trains. - These trains are unheated. - The steam loco they use has broken down at least once. Is this an accurate summary? Cheers Darius
  21. Interior fitted to second coach and light weathering to finish. Cheers Darius
×
×
  • Create New...