so how does the N gauge King fit into the production schedule bearing in mind that the 71 has slipped back due to the "Chinese New Year" and will this have a domino effect on other models
Yes I have them larger and they are on my Flickr site too. I also have notes of sightings at BOT during the early 90s if they are of interest Love the project and the locos
I am at a loss tounderstand why you would want transfers for the 68 as both of the locos in this livery are to be produced fully finished and are covered by the licence I presume
ok so you replace the bogies and filled in the unwanted holes in the main spine, removed the strange frame structure and you have still to rebuild the entire underframe or you could wait for the Bachman MBA
bogies aside the underframe is still a work of fiction and even after filling in the strange oval holes in the main spine there is still a mass of missing detail