Jump to content
 

apbolton

Members
  • Posts

    105
  • Joined

  • Last visited

Everything posted by apbolton

  1. That's a pretty detailed mock up you have there, definitely looks the part. I shall look forward to seeing your layout development.
  2. Can we make them fit, send me them and dimensions and I'll have a look .
  3. I think Peters Spares has some in stock as Spares Dapol part number 115514
  4. If anyone in the North East would be interested in helping operate the layout, on days when we are open to the public, please PM me for more information.
  5. I was at Ormesby Hall today, and took a few photos before opening. Just a few scenic ones not a train in sight. Although Ron named the layout Corfe Castle the only real bit of Corfe is the railway station, still rule no.1applies.
  6. Wills do a range of modern buildings such as distribution depot etc may be something you could use.
  7. Excellent Jesse. Enjoyed that, looking forward to see the full sequence sometime.
  8. Hi BoD The window overlays and the gable ends are cut using the silhouette cutter , it makes it very easy to duplicate parts.
  9. Update, thanks to animotion of this parish, who sent me some wonderful photos, I have made a start on the last station building, platforms 2 and 3. Firstly platform 3 side was cut out and the stone work added. Then the remaining walls were added and the window overlays were built up. And now the upstairs is being added. And finally a test fit on the layout before I get any further.
  10. So sad to hear this news , great modeller and a great person, we first met at Ormesby Hall when we started to build Pilmoor nearly 30 years ago. I shall miss our annual catch up at York show. RIP my friend.
  11. Yes indeed, the 11 fiddle yard tracks now have isolating sections and I only burnt my fingers once! Next all the points need connecting to the control panel and then I will be able to run trains properly.
  12. Peters spares produce a replacement, try www.petersspares.com you can order on line.
  13. Stage 2 complete, plastered and grassed, it needs hovering off once it dried, more will be done to it in time but it will not be properly finished for a while.
  14. You're not wrong there Graham, First stage completed, 3 layers of plaster bandage applied. As soon as I have the time it will be skimmed with polyfiller coloured with brown paint, before the flock is applied.
  15. Progress has been a bit slow this last couple of weeks, but I've managed to add the entrance to the quarry besides Chee Tor tunnel, although not prototypical and somewhat lower than planned the hillside has been extended. It was my intention to make it slope more on the righthand side but there wasn't enough clearance for the up and over door.
  16. Here is the original drawing Graham produced for me, the additional quarry is in the bottom right above the track shown making the layout on 3 different levels. And you know how much I like shunting but it was really an excuse to have some of the ICI bogie hoppers or at least a reason to run them through Millers Dale and Monsal Head.
  17. Yes it is, independently operated from the main layout but also an excuse to have some ICI bogie hoppers which in reality would not be seen at Millers Dale, bit of modellers licence, after all the Peak District is noted for its quarries, isn't it.
  18. Although not part of the original plan, we decided that there was room for a small quarry behind Chee Tor, that baseboard was added last year and the track set out, but then left. I decided it was time to get on with it, so over the last week for an hour or so each night I have pinned down the track and wired it up. Now all I need to do is build a small control panel and it will be fully operational and ready for some scenic work.
  19. Work seems to have got in the way at the moment, but it will be arranged, not been idle though, watch this space!
  20. It's been some time since I last posted any progress and to be honest I have done very little on the layout, I have however been working on the platforms in the warmth, now its a bit warmer I have started to complete them insitu. Before I get too far along I want to complete the backscene, so I have put a first coat of plaster on the rock face and a bit of blue for the sky. Lots to do yet duties its a start, hoping for a building day in May, so watch this space!
  21. I am sorry to announce that there will not be a Hartlepool Show this year, the college are unable to accommodate us this year and I have not been able to find a suitable alternative. I will keep looking for next year so watch this space for updates.
  22. I have had several repaired free Gaugemasterover the years, although not recently, it would be worth trying them before attempting any repair, I suspect Gaugemaster would say tampering nullifys the warranty.
  23. I believe its for the Hornby TT club.
  24. Stop The Press!!! Hartlepool show has an exclusive. Come along and be amongst the first to see some of the new Hornby TT range announced today. The TT magazine are currently building a layout using items from the new range. This will be it's first public showing, although still a work in progress, you can see many of the new range close up
×
×
  • Create New...