Have been adding a little detail to the body, It has been a little slow as I have had some time away from the workbench. Mainly waiting for things and people that never turn up.
The first pictures show the bunker rear and the water filler which was scratch built as there was not one with the kit. I still need to add the top lamp iron, and the fire iron brackets, once I have worked out how to make them.
We then move onto the injector feed, which was also built up from brass as the white metal one was incorrect in shape and where the whistle fitted.
Now onto the smokebox door, which I repositioned and and added the hinges and a new dart.
Now we move onto the cylinder lubricators, clack valves and blower valve. The first two come from Laurie Griffin, the later was out the spares box.
Next we get to the sanding operating lever and rod on the drivers side.
Next is a full view of the drivers side showing all the pipes and rods etc. I also fitted the hand brake in the cab. There are levers and handwheels to add to the rods etc in the cab. That will happen when I start the cab detailing. The front lamp brackes still need to be done. Then it is just down to the chimney and dome I think.
Edited by N15class
Add header
- 2
10 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now