Ron Heggs

Points Bridge, Hagg Bank, Wylam, Northumberland

Recommended Posts

It is coming on well. It must be becoming quite rigid now. Are you doing the arches one at a time or have you all three on the go?

Edited by N15class

Share this post


Link to post
Share on other sites

It is coming on well. It must be becoming quite rigid now. Are you doing the arches one at a time or have you all three on the go?

Hi, Peter

 

Yes, the bracings are starting to reduce the arch flexibility and make it far more rigid. I can already see that the vertical rigidity will make the deck support/loading a reality

 

The arches are being built one at a time. This first one will be the middle of the three. The two outer arches are identical, and some of the cross-bracings are opposite-hand to those on the middle arch

 

Will have to increase the strip cutting time, to speed-up the build of this first arch, and attach it to the deck

 

Cheers

 

Ron

  • Like 1

Share this post


Link to post
Share on other sites

All the main external braces fitted along with the relevant cross-braces -

 

post-10633-0-91491100-1334446516_thumb.jpg

 

Positioned, but not fixed, on the deck -

post-10633-0-90855800-1334446539_thumb.jpg

 

post-10633-0-85137400-1334446563_thumb.jpg

 

- internal braces and cross-braces next -

  • Like 16

Share this post


Link to post
Share on other sites

I must thank all those members who are following this topic/thread for your continuing interest, and a special thanks for clicking on 'LIKE THIS'

 

Cheers

 

Ron

  • Like 10

Share this post


Link to post
Share on other sites

Hi Ron,

 

Will you be fixing track to this before it is completed? Can't wait to see it finished with some stock staged on it. Also will this be going on to Manchester Central or is just a detour to keep you from getting bored other tasks!?

 

It is a superb build but everything you have posted on here is superb so would not have expected anything less really.

 

Steven

Share this post


Link to post
Share on other sites

Hi Ron,

 

Will you be fixing track to this before it is completed? Can't wait to see it finished with some stock staged on it. Also will this be going on to Manchester Central or is just a detour to keep you from getting bored other tasks!?

 

It is a superb build but everything you have posted on here is superb so would not have expected anything less really.

 

Steven

Hi, Steven

 

Eventually track will be laid, not sure whether before the challenge ends in October

 

The bridge will be used on part of the layout which will pass through the summerhouse, visually disconnected from the main part of the layout, which will be indoors

 

I do switch modelling tasks frequently, as you rightly say to reduce the boredom with tedious and lengthy builds

 

Thank you for your much appreciated comments

 

Cheers

 

Ron

Share this post


Link to post
Share on other sites

Another six internal braces/cross-bracings fitted this evening -

 

post-10633-0-62552800-1334530892_thumb.jpg

 

A brace unit ready to fit -

post-10633-0-49367000-1334530302_thumb.jpg

 

The brace unit threaded through the external brace member -

post-10633-0-29252100-1334530326_thumb.jpg

 

The brace unit fixed in its location -

post-10633-0-88107100-1334530347_thumb.jpg

  • Like 5

Share this post


Link to post
Share on other sites

Some of you may have noticed that the last picture in post #53 showed a packet or two of Archer 3D transfers for rivet heads :O

 

Yes, I am going to try these out on the bridge before painting :rolleyes:

Share this post


Link to post
Share on other sites

Hi Ron,

 

You are making good progress with the arch, no surprise there. looking forward to seeing more pictures as you continue.

 

Colin

Share this post


Link to post
Share on other sites

Some of you may have noticed that the last picture in post #53 showed a packet or two of Archer 3D transfers for rivet heads https://www.rmweb.co.uk/community/uploads/emoticons/default_shok.gif

 

Yes, I am going to try these out on the bridge before painting https://www.rmweb.co.uk/community/uploads/emoticons/default_rolleyes.gif

That may well take longer than the construction. Looking very impressive with the arch over the bed.

Edited by N15class

Share this post


Link to post
Share on other sites

Somehow the "Like this" button seems totally inadequate.... amazing work.

Share this post


Link to post
Share on other sites

Hi Ron,

 

You are making good progress with the arch, no surprise there. looking forward to seeing more pictures as you continue.

 

Colin

Thanks Colin - there will be plenty more pictures to post as the build continues

 

Ron

Share this post


Link to post
Share on other sites

That may well take longer than the construction. Looking very impressive with the arch over the bed.

Hi, Peter

 

Thanks

 

You may well be right about the rivet head placements taking a little longer than the build

 

Ron

Share this post


Link to post
Share on other sites

Somehow the "Like this" button seems totally inadequate.... amazing work.

Thank you - your comments are much appreciated

 

Ron

Share this post


Link to post
Share on other sites

The last of the internal braces with five cross-bracings -

post-10633-0-57220700-1334681115_thumb.jpg

 

post-10633-0-31881400-1334681344_thumb.jpg

 

The middle arch build so far -

 

- mounted temporarily on/through the deck

post-10633-0-14033400-1334681365_thumb.jpg

 

post-10633-0-13569200-1334681385_thumb.jpg

 

post-10633-0-75979400-1334681409_thumb.jpg

 

post-10633-0-98392300-1334681449_thumb.jpg

 

post-10633-0-76695400-1334681477_thumb.jpg

 

post-10633-0-50110300-1334681506_thumb.jpg

 

post-10633-0-87804300-1334681550_thumb.jpg

 

post-10633-0-68588000-1334681577_thumb.jpg

 

- now to complete the remaining internal bracings for the remaining 40% of this arch

  • Like 13

Share this post


Link to post
Share on other sites

Stunning stuff. This is true model engineering - not the lathe-turned and paraffin-driven stuff you see at a typical model engineering exhibition, of course - but engineering of the highest order nonetheless.

Share this post


Link to post
Share on other sites

Couldn't post these photos last night as the site was off-line

 

The arch is complete and fitted to the deck -

 

post-10633-0-74826600-1334867382_thumb.jpg

 

post-10633-0-27244400-1334867411_thumb.jpg

 

The next step is to fit the suspension hanger/struts

  • Like 5

Share this post


Link to post
Share on other sites

Stunning stuff. This is true model engineering - not the lathe-turned and paraffin-driven stuff you see at a typical model engineering exhibition, of course - but engineering of the highest order nonetheless.

Hi, John

 

Thanks for your comments - My model builds need to function in a similar way as the real structures - bridges need to be a real scale construction, not a facade - although these bridges couldn't really be constructed in any other way to represent the actual structure

 

Cheers

 

Ron

Share this post


Link to post
Share on other sites

So when is the first loco crossing? :sungum: Looks as if it will have no problems with the weight.

Share this post


Link to post
Share on other sites

The first two suspension/hangers fitted -

 

post-10633-0-37690200-1335299663_thumb.jpg

 

post-10633-0-05356700-1335299693_thumb.jpg

 

post-10633-0-24399700-1335299736_thumb.jpg

 

- another 14 to fit

  • Like 5

Share this post


Link to post
Share on other sites

How does the tensile strength of the model plasticard compare to that of the full size steel ? I'm guessing the plasticard is proportionally stronger ?

Share this post


Link to post
Share on other sites

How does the tensile strength of the model plasticard compare to that of the full size steel ? I'm guessing the plasticard is proportionally stronger ?

Hi, Stubby

 

The answer to your question is in two parts -

 

1. Material Strengths

 

Styrene: Ultimate Tensile Strength is 40 Mpa (40N/mm2)

 

Structural Steel: Ultimate Tensile Strength is 400 Mpa (400N/mm2)

 

The actual bridge deck suspension hangers are 25mm x 150mm cross-section steel

The model suspension hangers are 0.5mm x 2mm cross-section styrene

 

Max Force (Load) = Ultimate Tensile Strength x Cross-sectional Area

 

Styrene: Force = 40MPa x 0.5 x 2 x 100 = 4kN

Steel: Force = 400MPa x 25x 150 x 100 = 150,000kN

 

Since the model scale is 1:76.2, the area ratio is 1:5806.44

 

This means that the scale equivalent scale Force would be 4kN x 5806.44 = 23,225kN, some 15% of that of the actual

 

2. Scale Equivalent Loads

 

Assuming a model loco is approx. 500g, then the scale equivalent mass would be 442,451g = 443kg = 0.443tonnes

 

Whereas, the prototype would be nearer 100tonnes. This makes the model loco only say 0.5% of the actual

 

In conclusion, the model suspension hangers have a greater equivalent model load capability some 30 times (15% / 0.5%) greater than the actual prototype, as the model locos, etc. are much lighter in scale terms

 

Hope I haven’t confused you too much

 

Cheers

 

Ron

  • Like 7

Share this post


Link to post
Share on other sites

Ah, so what you're saying is : although the model is proportionally not as strong as the prototype, because the model locos are considerably lighter than their full size eqivalents, the model bridge is still well within tolerances for supporting said model loco.

 

Phew !

 

It's just that those hangers look very thin (mind you, I also said that about the real ones - what do I know ?)

 

Thanks

 

Stu

 

Edit : The other main difference, of course is that the real hangers are bolted to the other bits of the bridge at each end, where as the model is only glued together - which could result in weaker joints (except the glue is probably stronger than the plastic !)

Edited by Stubby47

Share this post


Link to post
Share on other sites

Hi Ron -

 

Been 'offline' for a while. Stunning progress! Two things - you say this model will go in a summerhouse? No danger of warping in the heat? Secondly - very early on it looked like you will building the intial structure over a plan. If so - how did you prevent the styrene sticking to the plan? I only ask because I've got to model the girder-work associated with the canopyof a platform at Brisol Temple Meads...

 

Regs

 

Ian

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.