Jump to content
 

A Scottish Branch Line Terminus: making a start in EM Gauge


rhnrhn
 Share

Recommended Posts

  • RMweb Gold
34 minutes ago, 27105 said:

Hi Richard,

Many thanks for your reply.

Is the platform 'running in board' structure scratch built or a kit?

Kind regards

Mark

 

It is scratch built using 1.5mm dia styrene rod for the posts and 0.5mm thick styrene sheet for the board and base.

Richard.

  • Thanks 1
Link to post
Share on other sites

44 minutes ago, rhnrhn said:

 

It is scratch built using 1.5mm dia styrene rod for the posts and 0.5mm thick styrene sheet for the board and base.

Richard.

That's very useful to know.

Many thanks

Mark

Link to post
Share on other sites

On 30/07/2023 at 12:57, rhnrhn said:

Here they are in a train, waiting for the signal to leave Achnabroad, behind a pristine* D8123:

 

(* Although for a first attempt I am happy with the wagons, I am still daunted by the idea of weathering something expensive like a locomotive!)

 

P7300160_19_focusstacking.jpg.1151e9597d0bb9ee976dde49dc70f2c9.jpg

Hi rhnrhn, 

 

Some lovely modelling going on here.

 

Regarding the weathering, the wagons look fantastic, so dont worry about locos, I would say start with the bogies and underframes, that will build confidence and fire you up for doing the body.

 

Good luck with it, going by the wagons, you already have the skills !

 

Cheers

 

TT100 Diesels

  • Like 2
  • Thanks 1
  • Friendly/supportive 1
Link to post
Share on other sites

  • RMweb Gold

Thanks for the kind words and encouragement, TT100!

 

1 hour ago, TT100 Diesels said:

I would say start with the bogies and underframes, that will build confidence and fire you up for doing the body.

 

That's a good idea, I might give that a try ... 

Regards

Richard

  • Thanks 1
Link to post
Share on other sites

Richard.

If you weather with Acrylic Paints, it can be almost removed if you are not happy with it. I find that they do not affect the finish on RTR models. Some will stick in grills and other recesses, but this is what is wanted, sometimes.

Andy.

  • Agree 1
  • Informative/Useful 2
Link to post
Share on other sites

  • RMweb Gold

Two of the Parkside Van kits, PC07A (12 ton Goods Van, Plank Sides) and PC08A (12 ton Goods Van, Plywood Sides) are supplied with two options of doors and buffer beams. Because the buffer beams are integrated ito the van ends, this means that at the end of the build, there are two spare ends and two extra door mouldings leftover from each kit:

 

P8050002.JPG.d8cc2e6361c784c83807c2732fdd2832.JPG

 

Throwing these “redundant” parts away would be absolute heresy, so I have used them to make some additional vans up, using two Dapol 10ft Chassis (WCHAA10) as a base.

 

The Dapol Chassis also comes with buffer beams, so I decided to remove the buffer beams from the van ends using a sharp knife as this seemed easier:

 

P8050003.JPG.f84810832fa151f4f01d65d7c6d4564a.JPG

 

Then it was a matter of cutting some sides and bases from Evergreen 1mm Styrene Sheet and assemblig them to build up the van body:

 

P8050034_30_focusstacking.jpg.b1b74a383bdda340f560439a318ce383.jpg

 

 

 

 

 

Edited by rhnrhn
  • Like 6
Link to post
Share on other sites

  • RMweb Gold

 

In order to secure the van body to the chassis M2 Nuts and bolts are used, for which 2mm diameter holes were drilled in both the chassis and the van body base using a pin vice.

 

P8060127.JPG.0c63865b24890e641a2a48968475d1e2.JPG

 

The position of the holes is determined by the centre bore of the Kadee coupling box, which will also be fixed by these nuts and bolts.

 

P8060131.JPG.325d41d8b2401e7a89a9f13fc3aa0986.JPG

 

The M2 nuts are encapsualted in a styrene sheet "sandwich" ...

 

P8060132_30_focusstacking.jpg.8878ef6a952b647ce6e9f2fcee8b975a.jpg

 

.... which is then mounted to the inside of the van base ...

 

P8060282_30_focusstacking.jpg.b083385a321ba4ee57a10e0b524b7eb3.jpg

 

... such that the couplings chassis and body can be bolted together:

 

P8060252_30_focusstacking.jpg.ddeb26bae7dc04d5738bd3dc2eb8d18c.jpg

  • Like 4
  • Craftsmanship/clever 1
Link to post
Share on other sites

  • RMweb Gold

Riveting at the ends of the sides was applied using a toothed wheel (somewhat haphazardly alas - one of the runs has doubled up) and the vertical external frames applied using Evergreen Styrene T Profile:

 

P8050064_30_focusstacking.jpg.43004529ef62da1f6f14e72824443e4a.jpg

 

The roof was formed by rolling some 0.5mm sheet round the shaft of a screwdriver:

 

P8060326.JPG.40d77b195776def0875e73fbb54f9acd.JPG

 

... and then attached to the body, together with styrene strip which was used to for the roof ends and diagonal framing. Load label boards were fitted using the additional ones that came with the sprues holding additional ends and doors, and the end vents were fabricated from styrene sheet and strip.

 

P8060001_28_focusstacking.jpg.c8b58fe47372d02b34dc7d27202f6541.jpg

 

The assembly was then treated so a rub down with wet and dry to prepare it for painting.

  • Like 6
  • Craftsmanship/clever 7
  • Round of applause 1
Link to post
Share on other sites

Very impressive work!

 

A little more detail concerning the forming of the roof would be appreciated, as my own scratch-build of a grounded wagon has - umm - ground to a halt exactly there.

 

Was it tight rolled around the shaft of the screwdriver while cold?

 

Edited by aardvark
  • Thanks 1
Link to post
Share on other sites

  • RMweb Gold
16 hours ago, aardvark said:

Very impressive work!

 

A little more detail concerning the forming of the roof would be appreciated, as my own scratch-build of a grounded wagon has - umm - ground to a halt exactly there.

 

Was it tight rolled around the shaft of the screwdriver while cold?

 

 

Thanks!

 

Although it was cold (0.5mm thick styrene sheet forms quite nicely cold I have found), it wasn't tight rolled around the screwdriver, but formed over it. As they say a picture paints a thousand words:

 

Using a screwdriver with 7mm 1/4" ish diameter shaft and 0.5mm styrene sheet:

 

IMG_20230807_180029697_MF_PORTRAIT.jpg.efda878dc7323a5ea45b05d50628bdd0.jpg

 

I positioned the sheet with approximately 15mm on one-side of the screwdriver and pressed with my fingers and thumbs either side of the screwdriver shaft until I felt the styrene give:

 

IMG_20230807_180048955_MF_PORTRAIT.jpg.f396864f100fab2856b779701565f5c0.jpg

 

I then moved the sheet a bit further say 10mm over the screwdriver and pressed again

 

IMG_20230807_180054751_MF_PORTRAIT.jpg.5a9e1ec3dbea58cfe339c6514c22d1e7.jpg

 

and again and again until it had formed a curve:

 

IMG_20230807_180059784_MF_PORTRAIT.jpg.84dda787dac59e224cb6e943b7dd66cb.jpg

 

I found the radius of the curve to be a bit more convex than required for the roof profile but the masking tape to hold it in place over the wagon ends helped guarantee the form when it was glued to the wagon body.

 

P8060346_9_focusstacking.jpg.45ef6c9687e3e38d02b5b749f3303c5e.jpg

 

Hope this helps!

Regards,

Richard.

Edited by rhnrhn
typos
  • Like 4
  • Informative/Useful 3
  • Craftsmanship/clever 2
Link to post
Share on other sites

  • RMweb Gold

The wagons have been painted using first a rattle can for priming both the bodies and chassis. The chassis were then painted black also using a rattle can, and the bodies were brush painted using Revell Acrylic 85 Brown for the sides and Revell Acrylic 374 Grey for the roofs.

 

Patches of Revell Acrylic Gloss Varnish were applied to act as a base for the transfers.

Once the transfers were applied, the vans were then treated to a coat of Revell Acrylic Matt Varnish, brush painted, to create a key for the weathering washes.

 

As can be seen the brown is quite bright, (particularly if, as in the first picture, the lighting is wrong...) but as a base for weathering it will do:

 

P8120001_25_focusstacking.jpg.70371bc8b57d41eaeb2a30ae212da6d2.jpg

 

P8120026_20_focusstacking.jpg.e07cd1563398850cf9e4ad6dc6a674ab.jpg

 

Once dry, the sides were then treated to a coat of Humbrol Enamel Dark Brown Wash and the roofs to a coat of Humbrol Enamel Black Wash, applied with a brush and then manipulated / wiped away with cotton swabs.

 

They were left to dry overnight and then the whole van body was treated to a coat of Humbrol Enamel Dark Grey wash, again  applied with a brush and then manipulated / wiped away with cotton swabs.

 

They were left to dry overnight again and then the chassis was treated to a coat of Humbrol Enamel Sand Wash applied with a brush. This time however  the wash was manipulated using a large dry brush in vertical strokes (relative to the van), which resulted in a patina of the sand wash being left on the lower part of the van sides.

 

Finally the whole van was treated to a mix of AMMO Europe Earth and AMMO Track Rust weathering powders.

 

P8150051_27_focusstacking.jpg.119c8b62f9e902752ec2d47e1f0448b6.jpg

 

P8150078_24_focusstacking.jpg.f299129c6a0764ef452b51810caf05dd.jpg

 

Here they are together with their half-siblings that were made from the original kits...

 

P8150102_17_focusstacking.jpg.dca674ee5db4bad0c76dab128d77d374.jpg

  • Like 16
  • Craftsmanship/clever 2
Link to post
Share on other sites

  • 2 months later...
  • RMweb Gold

Note: the signal scheme has since been reworked and is re-described in a later post...

 

In the current issues of both BRM and Model Rail two of the featured layout articles focus on those layouts signalling, in particular their lever frames.

 

So in an attempt to be topical here is a description of the Lever Frame and Interlocking that I have devised for Achnabroad.

 

According to the information at the excellent Callandar and Oban Railway Signalling Archive  (http://www.oban-line.info/ba1.html ),  the track layout is not dissimilar to that at Ballachulish , so I have used the signal box diagram & lever arrangement for that station as a basis for the signal controls for my layout.

 

Here is the signal box diagram for the layout:

 

mimic.jpg.74c92bfbdd33356215401014bde83a76.jpg

 

Note that some of the diagram is not yet modelled - the Ground Signals 9 and 11 are still unmade kits and the Approach Signals 1 and 3 together with the Fixed Distant will be a feature when / if the layout gets extended.

 

However they are included in the lever frame so that I can simulate the interlocking correctly.

 

The interlocking is designed so that routes can only be set (i.e. points changed) if all the signals are on (set to danger), and the points are also interlocked with each other so that only plausible routes can be set.

 

For example:

  • Release Crossover 10 can only be set if both Turnouts 5 and 8 are set straight.
  • Throat Turnout 5 can only be set if the release crossover 10 is set straight.
  • Turnouts 8 to the sidings move together and can only be set if Throat Turnout 5 is straight (which means that Release Crossover 10 is also set straight)
  • Turnouts 5 and 8 can only be set if their respective locking levers 4 and 7 are released.

Signals can only be released when appropriate routes are set, and cannot be release in conflict with one another:

  • Shunting Signal 11 can only be released if  Throat Turnout 5 is set to straight and if Release Crossover 10 has been set to crossover (which means therefore that all other signals are on).
  • Shunting Signal 9 can only be released if  Throat Turnout 5 is set to straight and if Turnouts 8 have been set for the Sidings (which means therefore all other signals are on)
  • Starting Signal 2 or Approach Signal 1 can only be released if Release Crossover 10 is straight, Throat Turnout 5 is set to Turnout and its Locking Lever 4 is locked. The two signals 1 and 2 are also mutually exclusive so that only one be off at a time. 
  • Starting Signal 6 or Approach Signal 3 can only be released if Release Crossover 10 is straight, Throat Turnout 5 is straight, Sidings Access 8 are straight and their respective Locking Levers 4 and 7 are locked. The two signals 3 and 6 are also mutually exclusive so that only one be off at a time. 

The levers are the DCC Concepts Cobalt Levers. Each lever contains 3 switches, a passing contact switch for the turnout / signal operation and two on-on (single pole double throw) switches which are used for the interlocking.


They are wired up according to the following diagram, which shows two circuits, one for the signals and one for the points:

 

interlocking.jpg.a26f3fcacf25418dda0ad3d4eecf2c0e.jpg

 

The interlocking circuit for the points is represented by the circles with grey edges and the one for the signals represented by the circles with black edges.

 

The fill colours depend on the associated levers purpose: - Red for Signal Levers, Black for Points and Blue for the Points Locks.

 

If the correct combination of lever settings is set, the circuit through to the relevant passing contact switch is made and its lever can operate the required point or turnout. The passing contact switches are represented by the squares at the end of each circuit.

 

Hope that all makes sense 🙂.

 

 

 

Edited by rhnrhn
Refer to later updated post
  • Like 3
  • Craftsmanship/clever 2
Link to post
Share on other sites

  • RMweb Gold

For the lever frame I constructed a wooden box using an assortment of ready-made wooden trays 120mm x 120mm x 20mm, some 10mm x 10mm wooden strip and some 3mm and 5 mm plywood sheet which I obtained from a craft shop.

 

The trays formed two ends between which a frame made up from the wooden strip was mounted with a sheet of 5mm Plywood forming the back. 

 

P9170031.jpg.72ab7cd16251111789c932c71cc597bd.jpg

 

(The pilot holes for the screws used to secure the levers, control board and wiring harnesses were drilled before assembly.)

 

P9170075_18_focusstacking.jpg.c6c3560aea763d518d722192569beea2.jpg

 

The whole lot was painted and then the components mounted. Starting with the Cobalt Alpha Encoder Unit which is fitted to the underside of the two upper strips which will also hold the levers:

 

P9170002(2).jpg.f4ec888662d44d4b858422cada1a80cc.jpg

 

Then the levers with their wiring harnesses pre-assembled, are mounted above the encoder, and the wiring harnesses secured to each side the lower strip (with those for the levers with even numbers above, and odd numbers below):

 

P9170006.jpg.229029474d7823df5499d67f8d38854f.jpg

 

Then they were connected as per the wiring diagram previously described (which turned out to be not as nice and neat as the diagram had led me to believe...):

 

P9240001.JPG.5b6f11bc25c075929d369870e7ad5c60.JPG

 

Number 12 Lever is spare so it has been used to switch the yard and building lighting on and off, hence it's harness on the extreme left is not connected to the encoder but to two connectors for the lighting circuit.

 

Finally a second piece of 5mm ply was screwed to the front of the box and a piece of 3mm ply with a cut out for the levers to the top and it was hung on the side of the layout using two hinges,

 

P9240002.JPG.ed3e2b05e9e78b526759f0b58b88ddd0.JPG

 

The gap on the right is deliberate, with levers 12 (spare) together with 4 and 7 (points locks) not being connect to the encoder, I have 3 spare slots in the encoder, so I have allowed for another 3 levers to be mounted should future extensions to the layout demand.

 

 

  • Like 9
  • Craftsmanship/clever 1
Link to post
Share on other sites

  • RMweb Gold
5 hours ago, rhnrhn said:

In the current issues of both BRM and Model Rail two of the featured layout articles focus on those layouts signalling, in particular their lever frames.

 

So in an attempt to be topical here is a description of the Lever Frame and Interlocking that I have devised for Achnabroad.

 

According to the information at the excellent Callandar and Oban Railway Signalling Archive  (http://www.oban-line.info/ba1.html ),  the track layout is not dissimilar to that at Ballachulish , so I have used the signal box diagram & lever arrangement for that station as a basis for the signal controls for my layout.

 

Here is the signal box diagram for the layout:

 

mimic.jpg.74c92bfbdd33356215401014bde83a76.jpg

 

Note that some of the diagram is not yet modelled - the Ground Signals 9 and 11 are still unmade kits and the Approach Signals 1 and 3 together with the Fixed Distant will be a feature when / if the layout gets extended.

 

However they are included in the lever frame so that I can simulate the interlocking correctly.

 

The interlocking is designed so that routes can only be set (i.e. points changed) if all the signals are on (set to danger), and the points are also interlocked with each other so that only plausible routes can be set.

 

For example:

  • Release Crossover 10 can only be set if both Turnouts 5 and 8 are set straight.
  • Throat Turnout 5 can only be set if the release crossover 10 is set straight.
  • Turnouts 8 to the sidings move together and can only be set if Throat Turnout 5 is straight (which means that Release Crossover 10 is also set straight)
  • Turnouts 5 and 8 can only be set if their respective locking levers 4 and 7 are released.

Signals can only be released when appropriate routes are set, and cannot be release in conflict with one another:

  • Shunting Signal 11 can only be released if  Throat Turnout 5 is set to straight and if Release Crossover 10 has been set to crossover (which means therefore that all other signals are on).
  • Shunting Signal 9 can only be released if  Throat Turnout 5 is set to straight and if Turnouts 8 have been set for the Sidings (which means therefore all other signals are on)
  • Starting Signal 2 or Approach Signal 1 can only be released if Release Crossover 10 is straight, Throat Turnout 5 is set to Turnout and its Locking Lever 4 is locked. The two signals 1 and 2 are also mutually exclusive so that only one be off at a time. 
  • Starting Signal 6 or Approach Signal 3 can only be released if Release Crossover 10 is straight, Throat Turnout 5 is straight, Sidings Access 8 are straight and their respective Locking Levers 4 and 7 are locked. The two signals 3 and 6 are also mutually exclusive so that only one be off at a time. 

 

Nice to see someone caring about signalling correctly but for, the benefit of anyone else wanting to do similar, some queries please.

 

To access the grain unloading siding you would have to pass Signal 9 at danger. Unless there was some local practice I would expect Signal 9 to have a yellow band, not red, in order to permit this. 

 

Interlocking Signal 9 with Turnout 5 seems unnecessarily complicated.  Moving from the Goods Yard to the mainline over Turnouts 8 and 5 I would expect Signals 9 and 6 to be able to be pulled at the same time. What happens if the train is standing at Signal 6 with the rear of the train over Turnout 8 in  the reverse position?

 

Similarly when running round a train in the platform I would expect Signals 11 and 6 to be pulled at the same time. 

 

Andrew

Link to post
Share on other sites

On 07/08/2023 at 17:31, rhnrhn said:

 

Thanks!

 

Although it was cold (0.5mm thick styrene sheet forms quite nicely cold I have found), it wasn't tight rolled around the screwdriver, but formed over it. As they say a picture paints a thousand words:

 

Using a screwdriver with 7mm 1/4" ish diameter shaft and 0.5mm styrene sheet:

 

IMG_20230807_180029697_MF_PORTRAIT.jpg.efda878dc7323a5ea45b05d50628bdd0.jpg

 

I positioned the sheet with approximately 15mm on one-side of the screwdriver and pressed with my fingers and thumbs either side of the screwdriver shaft until I felt the styrene give:

 

IMG_20230807_180048955_MF_PORTRAIT.jpg.f396864f100fab2856b779701565f5c0.jpg

 

I then moved the sheet a bit further say 10mm over the screwdriver and pressed again

 

IMG_20230807_180054751_MF_PORTRAIT.jpg.5a9e1ec3dbea58cfe339c6514c22d1e7.jpg

 

and again and again until it had formed a curve:

 

IMG_20230807_180059784_MF_PORTRAIT.jpg.84dda787dac59e224cb6e943b7dd66cb.jpg

 

I found the radius of the curve to be a bit more convex than required for the roof profile but the masking tape to hold it in place over the wagon ends helped guarantee the form when it was glued to the wagon body.

 

P8060346_9_focusstacking.jpg.45ef6c9687e3e38d02b5b749f3303c5e.jpg

 

Hope this helps!

Regards,

Richard.

Dapol/Airfix/Mainline under-frames are not good, due to the solid cast brake levers. Better to use a Parkside chassis kit.

  • Agree 1
Link to post
Share on other sites

  • RMweb Gold
2 hours ago, Sitham Yard said:

Nice to see someone caring about signalling correctly but for, the benefit of anyone else wanting to do similar, some queries please.

 

To access the grain unloading siding you would have to pass Signal 9 at danger. Unless there was some local practice I would expect Signal 9 to have a yellow band, not red, in order to permit this. 

 

Interlocking Signal 9 with Turnout 5 seems unnecessarily complicated.  Moving from the Goods Yard to the mainline over Turnouts 8 and 5 I would expect Signals 9 and 6 to be able to be pulled at the same time. What happens if the train is standing at Signal 6 with the rear of the train over Turnout 8 in  the reverse position?

 

Similarly when running round a train in the platform I would expect Signals 11 and 6 to be pulled at the same time. 

 

Andrew

Hi Andrew,

 

Thanks for your feedback and queries!

 

My first thought regarding answering them was to hide behind local practice, but having read your comments I think that the scheme can and should be improved:

 

Signal 9 should definitely be yellow as per your explanation. Fortunately I haven't built it yet.

 

Signal 9 does however need to remain interlocked with Turnout 5, for the simple reason that the distance between it and Turnout 5 is so short that for any meaningful shunting to take place, Turnout 5 would need to passed, and would therefore need to be set to straight.

 

Regarding Signal 6 (and 2 for that matter), my interpretation of the rule was that it could be passed at danger for the purposes of shunting, so long as the shunting train did not leave the station limits - as per some sort of local practice.

 

However looking at this again, a better practice would be to clear the signal, without having issued a tablet/token to the driver, thereby allowing a shunting move within station limits but not allowing entry into the single line block section (i.e. no further than signals 1 & 3). This would be quite easy to implement by changing the circuit so that signal 6 is no longer dependant on a straight setting of turnout 8. That assumes of course that signals can be cleared without issuing of tokens...

 

Edited by rhnrhn
Link to post
Share on other sites

  • RMweb Gold
24 minutes ago, andytrains said:

Dapol/Airfix/Mainline under-frames are not good, due to the solid cast brake levers. Better to use a Parkside chassis kit.

Indeed - Parkside Chassis kits are cheaper too - and the wheels are better profile so only need regauging for EM, unlike the Dapol wheelsets which need to be replaced.

 

However the glue has set and the paint has dried on these ones...

Link to post
Share on other sites

Just found this thread; a super layout. Really admire your buildings and trackwork.

 

A couple of thoughts. On the signal box diagram, would point #5 normally be shown as set for the passenger road, rather than the goods yard? Also, would there have been a trap point between sig #6 and point #5, to protect the passenger running line from the freight sidings?

 

Link to post
Share on other sites

  • RMweb Gold
25 minutes ago, rhnrhn said:

That assumes of course that signals can be cleared without issuing of tokens..

Depending on local practice I would expect a second signal, Advance Starter, opposite Signal 3. This would mark the start of the token section.

Andrew

  • Informative/Useful 1
Link to post
Share on other sites

  • RMweb Gold

Just a thought would crossover 10 require a lock on the passenger road to prove if a passenger train was to start from the buffer end.  Agree that a trap would be required off the loop to protect traffic to/from passenger line.      Was about to add about advance starter / section signal  but beaten too it.

Great project and happy modelling

Robert 

 

Link to post
Share on other sites

  • RMweb Gold

Thanks to everybody for the feedback and constructive criticism! 

 

20 hours ago, Peter Kazmierczak said:

Also, would there have been a trap point between sig #6 and point #5,

19 hours ago, Robert Shrives said:

 Agree that a trap would be required ...

 

The initial idea was that vehicles in the goods yard and grain unloading

siding would remain contained there with no possibility of interfering with the passenger road unless both points 8 were set in their favour, which can only occur if 5 is set for the centre road, i.e against the passenger road. However this does not take care of the end section of centre road past the release cross over which is effectively a siding - which I hadn't considered.

 

image.png.8ef93978daa04ccab71783d8042d6e74.png

However to remedy this is not so easy.

 

Whilst lifting and replacing laid and ballasted track is a possible if not an attractive prospect, there is a problem with the would be location of the trap point motor.

 

In order to maintain clearance with the passenger road in the event of trapping a vehicle, this would have to be just to the left of the signal (as seen in this view) which is exactly where one of the baseboard frame cross members is.

 

Best laid plans etc. 

 

IMG_20231016_185812515.jpg.5f75b1c96a8d77909669a64256256d38.jpg

 

  • Friendly/supportive 2
Link to post
Share on other sites

  • RMweb Gold
21 hours ago, Sitham Yard said:

Depending on local practice I would expect a second signal, Advance Starter, opposite Signal 3. This would mark the start of the token section.

Andrew

That would work - although reading the  "REGULATIONS FOR WORKING CALLANDER & OBAN RAILWAY BETWEEN OBAN & DALMALLY,  BY TRAIN TABLET"  ( http://www.oban-line.info/instr/misc/ttregs.html ) local practice might indeed allow otherwise.

 

"NOTE. - Any Engine-driver may proceed with his Engine out on to the single Line at any end of any Tablet Station as far as is necessary for shunting purposes at the Station, without being in possession of a Train Tablet, when the Signalman, or other official in charge of the Signals, has given verbal instructions to do so."

 

That was in 1880 though - if such practice would be allowed 90 years later, which is the time that my scene is set, I would be surprised.

 

  • Thanks 1
Link to post
Share on other sites

  • RMweb Gold
22 hours ago, Peter Kazmierczak said:

Just found this thread; a super layout. Really admire your buildings and trackwork.

 

Thanks for the kind words!

 

22 hours ago, Peter Kazmierczak said:

would point #5 normally be shown as set for the passenger road, rather than the goods yard? 

 

Currently it is set by default for the goods yard, but I agree setting it for the passenger road would make more sense...

 

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...