Jump to content
 

Wencombe/Kingsbridge Regis/Louville Lane


westerner
 Share

Recommended Posts

Started on the layout again this afternoon, won't bother with photos at the moment as all you will see is bits of wood with weights on. I'm laying in other layer of cork (2mm) this time covering the point operating mechanism.

 

In the next couple of days I will make a list of stuff I hope to get at Stevenage.

Link to post
Share on other sites

  • 2 weeks later...

I've been working on the steps down from the footbridge. The first time I've worked with brick plasticard. It was painted with cream acrylic and then it was wiped off immediately which left the mortar lines and the bricks were shaded with pencil crayons (a mid brown). The steps came from a Metcalfe footbridge kit. It still needs some work, but I'm reasonably satisfied with it.

 

The photo is where it will be on the layout give or take a mm or two.

 

 

post-7090-0-15757500-1517430443_thumb.jpg

 

 

 

 

The sides of the platform, still not fixed were done the same way.

 

More photos in the Cameo thread

Edited by westerner
  • Like 10
Link to post
Share on other sites

  • 3 weeks later...
  • 2 weeks later...

A little more work at the other end of the layout, the foot bridge, not yet finished and weathered.

 

post-7090-0-49629100-1520869131_thumb.jpg

 

and down pipes on the retaining wall have started to be added.

 

post-7090-0-08362900-1520869151_thumb.jpg

 

 

and I could not resist this shot of a hymeck just a approaching a short parcels train

 

post-7090-0-28697700-1520869169_thumb.jpg

Edited by westerner
  • Like 13
Link to post
Share on other sites

  • 3 weeks later...

Spent the weekend building the Knightwing re-fuelling point

 

post-7090-0-08208300-1522678792_thumb.jpg

 

To make sure the pipes were controllable I insert some thin brass wire down the tube therefore enabling me to able to cover the pipe as I wished not the way it wished.

 

After taking photos of it on the layout I noticed a lean to one of the stand pipes and the roof, it is being dealt with as I type.

 

post-7090-0-19266300-1522678963_thumb.jpg

 

post-7090-0-63519800-1522678977_thumb.jpg

  • Like 15
Link to post
Share on other sites

  • 2 weeks later...
  • 2 weeks later...

Over the last week I have been fabricating bits for the overall roof of the upper area, that will sit on the back arches. At the moment the trusses are blue-tacked into place to give me some idea of how it will look. Tomorrow I will order some canopy brackets from York Modelmaking. The next job will be to paint everything before finally glueing things together. The trusses and supports are made from various evergreen products.

post-7090-0-62049000-1526227781_thumb.jp

post-7090-0-52724300-1526227802_thumb.jp

post-7090-0-63677100-1526227823_thumb.jp

post-7090-0-76755600-1526227842_thumb.jp

I quite like the way the shadows fall that I'm almost tempted not to have a roof, but I think I will. It will be a part glazed roof a bit similar to the one I had on the train shed at Kingsbridge Regis

  • Like 16
Link to post
Share on other sites

  • 4 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...