Jump to content
 

Hinksey Yard (c.2010)


Dave Searle
 Share

Recommended Posts

That wiring is superb. I wish mine looked more like that and less like spaghetti! I will be interested to see what type of lighting you decide to go for. One thing I have always found with layouts is that by having a large lighting rig over the entire length of the layout you loose the natural shadows that would occur at certain times of the day. I suppose that is one of the compromises that has to be made when trying to light something in miniature.

Link to post
Share on other sites

  • RMweb Premium

Hi,

 

A bit of an aside , but have you seen the 165/166 models by Shapeways that are shown in the "Banbury" layout thread?

 

Yes, I have two FGW 165 & a 166 set ready to build (so far - we will need several more 166s). They are very nice, just need to get round to making them up :paint:

 

Cheers,

 

Dave

Link to post
Share on other sites

  • 2 months later...
  • RMweb Gold

Dave

 

I went past Hinksey yard on Monday and class 60 011 in DBS red was in the yard. Unfortunately I was on the wrong side of a packed Voyager to get any photos.

 

Some of the hydraulic tilting track carrying wagons where there aswell. They looked brand new.

 

Ian

Edited by roundhouse
Link to post
Share on other sites

  • RMweb Premium

Hi Ian,

 

Thanks for the info - I would like to have seen the tilting track panel wagons. Last time I went there (in August) there was a 66 and just a few wagons - it looked very empty.

 

We are still resolving a few remaining "crossed-connection" issues with the wiring, but getting closer to the point where we can start track painting and ballasting.

 

Cheers,

 

Dave

Link to post
Share on other sites

  • 2 months later...

Hi Ian,

 

Thanks for the info - I would like to have seen the tilting track panel wagons. Last time I went there (in August) there was a 66 and just a few wagons - it looked very empty.

 

Cheers,

 

Dave

 

I believe they are severely decreasing capacity & operations out of Hinksey, owing to the now completed phase two extension of Whitemoor LDC.

 

Paul A.

Link to post
Share on other sites

  • 2 weeks later...
  • RMweb Premium

Hi,

 

Thank you for your comments and interest. Paul, one of the reasons we froze the period at 2010 was due to the peak in the activity around that time.

 

We are gradually getting back to work on the layout now the wiring is finished and tested, The next phase is to paint the rails and sleepers:

 

post-203-0-21466800-1356947823.jpg

 

We noticed these interesting yellow sleepers which appear to mark the clearances in the sidings (this will also make our operators lives easier).

 

post-203-0-81481700-1356947831.jpg

 

post-203-0-83239900-1356947816.jpg

 

We have also carved away the cork underlay for the stream that passes under all the tracks the the Didcot end of the yard. We don't have a lot of depth here, and can't cut much of the main board surface away, so the stream will be fairly overgrown - implying depth rather than showing it!

 

post-203-0-75383000-1356947796.jpg

 

We have started adding the cable troughs and orange pipes across the tracks where power is needed for the prototype's points, signals, AWS and TPWS. Also some masking tape to protect the point blades from getting glued up when we start ballasting.

 

post-203-0-26609000-1356947836.jpg

 

post-203-0-93107000-1356947826.jpg

 

It's good to be back in action again.

 

Cheers,

Dave

 

 

  • Like 10
Link to post
Share on other sites

  • 2 weeks later...
  • RMweb Premium

Some more gentle progress last night.  

 

Andy & Bill are working on ballasting tests to get a good working technique.  They are trying out different "glues" and ballast mixes.

 

post-203-0-62375100-1358239454.jpg

 

Meanwhile Brian has made a start on the backscene:

 

post-203-0-81094100-1358239462.jpg

 

The rest of us are painting rails and sleepers.

 

Cheers,

 

Dave

Edited by Dave Searle
  • Like 8
Link to post
Share on other sites

  • 1 month later...
  • RMweb Premium

We had a working Saturday and a productive Monday this week.

 

The left hand (South) end of the layout has had the rails and sleepers painted so we are beginning to add details. There is a river and some bridges going under the tracks at this end of the layout.  The river uses brown water colour paint on the base covered with a layer of "water" made from a Deluxe Materials two part mix:

 

post-203-0-40570200-1361954189.jpg

 

The eagle-eyed will notice that I missed out the water at the front edge of the board  :banghead:  A lot of the river banks will be covered with greenery, so the lack of real depth won't be too apparent. We've also added the yellow buffer stops (one of our members is currently preparing some red LEDs to light them).

 

This is an overview of the corner:

 

post-203-0-08265500-1361954190.jpg

 

The red box marks where the electricity pylon will go and various layers of cork have been added to give some depth to the scene and provide the pathway to the site office (the J-shaped path in the centre). Not so obvious is the infill of thin cork between the tracks. This is to help limit the sideways spread of the ballast and will eventually become the compacted paths between the tracks:

 

post-203-0-69841300-1361955263.jpg

 

Cheers,

Dave

  • Like 9
Link to post
Share on other sites

  • RMweb Gold

david

 

Looking good. I do like the way you have done the river. Its often hard to cut out boards without weekening boards. I have had this issue as my boards on most of my layouts are fairly shallow so that I can get htem in the car. Luckily the rivers around Oxford are often very full especially at the moment so you can get away with the way you have done it.

 

Its good the way you managed to get Network Rail to clear the yard so you could photograph it!!

Edited by roundhouse
Link to post
Share on other sites

The yards full up this week so you can't see any track! I would not bother with red LED's on the buffer stops as there are none in Hinksey, freight yards don't have them, passenger yards tend to so the passenger drivers know when to stop their units  :scratchhead:  Are you going to put the potholes in the access road?

 

It looks like you are a bridge under the mains short? On the first picture is the bridge you have in the middle of the train and in the second picture under the first and second wagon is another bridge. It's a little creek that goes between the down main and reception 1, from the bridge you have, and ducks under the second bridge behind the trees in the first picture. Hope that's clear?

post-6766-0-91233700-1361965671.jpg

post-6766-0-37045500-1361965674.jpg

  • Like 3
Link to post
Share on other sites

  • RMweb Premium

Hi Ian,

 

I was a little disappointed to have made the trip there last August to find the yard quite empty, but as you say it helps with the infrastructure photography. I was also able take a lot of shots of the electricity pylon and the trees and some wildlife - does anyone make N-gauge rabbits or adders?

 

post-203-0-90277300-1361970426.jpg post-203-0-66617200-1361970308.jpg post-203-0-51301000-1361970309.jpg

 

Hi Brian,

 

Thanks for those comments about the buffers lights - it's so easy to make incorrect assumptions so it's very useful to have the accurate information.

Yes we''l be putting in some potholes in the access road.

 

Thanks also for mentioning the second bridge. I can now see where it goes under the main lines (about half way along the wooded bit between the tracks) from some Bing views (it is less obvious than the first one, so I'd missed it). That'll also give me a chance to make some more water and put the missing bit in front of the first bridge.

 

Cheers,

 

Dave

  • Like 4
Link to post
Share on other sites

Hi Ian,

 

I was a little disappointed to have made the trip there last August to find the yard quite empty, but as you say it helps with the infrastructure photography. I was also able take a lot of shots of the electricity pylon and the trees and some wildlife - does anyone make N-gauge rabbits or adders?

 

attachicon.gifpylon.jpg attachicon.gifrabbits.jpg attachicon.gifadder.jpg

 

Hi Brian,

 

Thanks for those comments about the buffers lights - it's so easy to make incorrect assumptions so it's very useful to have the accurate information.

Yes we''l be putting in some potholes in the access road.

 

Thanks also for mentioning the second bridge. I can now see where it goes under the main lines (about half way along the wooded bit between the tracks) from some Bing views (it is less obvious than the first one, so I'd missed it). That'll also give me a chance to make some more water and put the missing bit in front of the first bridge.

 

Cheers,

 

Dave

 

That looks to be a grass snake rather than an adder, a very nice find.

Link to post
Share on other sites

On a prototypical note - I'm given to understand the two original footbridges will be retained but jacked up by about 1m to give OLE clearance (appropriately caged though) - Whitehouse (the concrete one) is falling to bits but is being repaired atm.

Link to post
Share on other sites

Its coming along well...

 

I've never been able to find anywhere to park to go look at the yard.

 

Seconded on grass snake * shiver* - hate snakes . full stop.

 

Try Manor Lane to the South-west - just off the A34 (no parking permits or restrictions) - then it's about a 5 minute stomp along the footpath to the Lake footbridge.

  • Like 1
Link to post
Share on other sites

  • RMweb Premium

On a prototypical note - I'm given to understand the two original footbridges will be retained but jacked up by about 1m to give OLE clearance (appropriately caged though) - Whitehouse (the concrete one) is falling to bits but is being repaired atm.

 

I hadn't registered that OLE was to be added. It would explain why the Abingdon Road bridge was raised between my visits in 2010 and 2012.  So we are now involved in creating a historical model set in 2010 - history started yesterday!

 

2010:

post-203-0-67426700-1362140172.jpg

 

2012:

post-203-0-05223900-1362140174.jpg

 

Cheers,

 

Dave

  • Like 1
Link to post
Share on other sites

  • RMweb Gold

Yes - Banbury will also soon be an historical model but much sooner than Hinskey as they are building a car park and footbridge to link in with the existing footbridge -  After Mondays trip I beleive this is about to start.

 

Ian

Link to post
Share on other sites

Here is the little creek between the Receptions and the Mains. I would not mix up too much water to go in there as it does look like you could go up this creek without a paddle, just walk on the weeds! Also note the bridge under the Receptions/south end of yard is a concrete one.

post-6766-0-64595500-1362312733.jpg

post-6766-0-67894200-1362312736.jpg

post-6766-0-31511900-1362312740.jpg

post-6766-0-71225500-1362312743.jpg

post-6766-0-54731200-1362312747.jpg

post-6766-0-78366300-1362312750.jpg

  • Like 4
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...