10 minutes ago, Phil Bullock said:

Looking like you have laid in a curve through that diamond Paul? Looks great! Waiting for mine to arrive from Marcway…

I have Phil 😉 took a bit of playing about on Templot to figure out how to do it but got there in the end.  I never thought to be honest and you had already ordered yours when we last spoke but I could of made one for you sorry.

  • Like 2
Link to post
Share on other sites

  • RMweb Gold
35 minutes ago, PjKing1 said:

I have Phil 😉 took a bit of playing about on Templot to figure out how to do it but got there in the end.  I never thought to be honest and you had already ordered yours when we last spoke but I could of made one for you sorry.


Ah that’s a kind thought fella! Thanks very much. 

  • Like 1
  • Friendly/supportive 1
Link to post
Share on other sites

  • RMweb Gold

A good days modelling has seen all the cosmetic chairs fitted and all turnouts are complete including the tiebars, I can now carry on with the catch point and the remaining straight sections.  As a little break from track building I’ve also made a start on the cable trucking.

 

Paul

EC6154EF-1539-4356-98BE-A92205C00A62.jpeg

6B5936A5-B5FE-435E-AF11-3FC767CB686F.jpeg

75486B02-DBAF-44BF-BE00-B5C0143C4E86.jpeg

433BE990-C1D1-4AAB-BFB2-73B5554F68A3.jpeg

596897DC-127D-46C2-B986-D91B2F968DA4.jpeg

BD8717A8-24A6-449D-8609-14E4ACE834A4.jpeg

00A5DAE4-AF10-40DF-8AF6-30D0E56159C5.jpeg

AC7C8FC1-AF62-419C-B1B3-90A8ED96837A.jpeg

C82320FF-758E-4FA8-8A8C-545EA84FE8BA.jpeg

C050A90A-69DD-4F57-A0C7-271DF6474438.jpeg

  • Like 6
Link to post
Share on other sites

  • RMweb Gold

Todays work has seen the continuation of sleepers on the up and down lines heading away from the junction I’ve also cut the retaining wall from slaters 7mm dressed stone, thankfully I found the original sheet used for my last attempt in 4mm.

 

Hopefully a new video tomorrow 

 

Paul

F6B6F8A2-AF14-4825-94B4-FF146C9CBCA0.jpeg

4AB3DA3B-0F02-46A6-9F0B-09DFEFA6FDA7.jpeg

ED3C1AA8-C5D5-4754-B45C-28F095CA33EE.jpeg

624AED6C-227A-46E7-80C6-39A10FCC26D5.jpeg

  • Like 6
Link to post
Share on other sites

  • RMweb Gold

Not much modelling done today but I have continued the track on the up main with another two 60’ lengths built, I’ve also done a video covering the threading of chairs and fixing them into position.

 

Paul

 

35574B90-B3FA-4E8F-B5AA-95F2F1EA2134.jpeg

5307A380-164B-4A69-A798-29DA7567F111.jpeg

A429D31A-54C4-4F6E-B054-E0AC9C9E81C3.jpeg

  • Like 8
Link to post
Share on other sites

  • RMweb Gold
On 11/01/2023 at 17:35, PjKing1 said:

Todays work has seen the continuation of sleepers on the up and down lines heading away from the junction I’ve also cut the retaining wall from slaters 7mm dressed stone, thankfully I found the original sheet used for my last attempt in 4mm.

 

Hopefully a new video tomorrow 

 

Paul

F6B6F8A2-AF14-4825-94B4-FF146C9CBCA0.jpeg

4AB3DA3B-0F02-46A6-9F0B-09DFEFA6FDA7.jpeg

ED3C1AA8-C5D5-4754-B45C-28F095CA33EE.jpeg

624AED6C-227A-46E7-80C6-39A10FCC26D5.jpeg

 

I could have sent you the old wall back!

 

Mike.

  • Like 1
  • Funny 2
Link to post
Share on other sites

  • RMweb Gold
3 hours ago, Enterprisingwestern said:

 

I could have sent you the old wall back!

 

Mike.

Are you trying to say it’s not good enough for your layout ;) haha

Edited by PjKing1
  • Funny 2
Link to post
Share on other sites

  • RMweb Gold
4 hours ago, PjKing1 said:

Are you trying to say it’s not good enough for your layout ;) haha

 

I'm still trying to incorporate the junction into the big train set, but the wall just kind of gets in the way!

Bear in mind, anybodies offerings are going to be at least as good as mine, so beggars can't be choosers!

 

Mike.

  • Like 2
Link to post
Share on other sites

  • RMweb Gold
10 minutes ago, Enterprisingwestern said:

 

I'm still trying to incorporate the junction into the big train set, but the wall just kind of gets in the way!

Bear in mind, anybodies offerings are going to be at least as good as mine, so beggars can't be choosers!

 

Mike.

Can’t wait to see the old ELJ in your layout mate, seen some photos of your progress the other day it’s coming along rather nicely 👍🏼

 

Paul

  • Like 1
  • Agree 1
  • Thanks 1
Link to post
Share on other sites

  • RMweb Gold

Midway through a week of early’s means not much modelling as I’m up at 3am each morning but I have threaded the chairs for the remaining sections of track that need competing and I’ve laid the last 60’ section on the down main.

 

Not much progress but at least it’s something.

 

Paul 

BA4CDF96-0685-40EA-855A-65696D378391.jpeg

  • Like 6
Link to post
Share on other sites

  • RMweb Gold

Thankfully my seven days of early’s are over so a bit of modelling time tonight.  The catch point is more or less finished, just need the slide chairs fitting so u can now turn my attention to wiring it all up and fitting the cobalts.

 

Paul

C0836D8B-6CE9-4B37-A337-89CA1E56C827.jpeg

37D77173-F0FD-4DDD-B9ED-6B9793CCEEC3.jpeg

34DA5B65-C718-48E8-AEEB-17CD870866CD.jpeg

57092627-AA1B-4430-9B63-B627C66DF2BF.jpeg

C92E646C-A906-45B7-AE3E-7E8EC523C89B.jpeg

A8543713-8F03-48D1-B62A-C8A5A1402516.jpeg

  • Like 9
Link to post
Share on other sites

  • RMweb Gold

Haha if all my stock was magically re-wheeled over night I’d consider it but I like getting things out of the box and plonking them on the track 😂

 

Paul

Edited by PjKing1
  • Like 1
  • Friendly/supportive 1
Link to post
Share on other sites

  • RMweb Gold

Wasn’t happy with the catch point so I’ve reduced the angle and I think it looks far better, so that’s more or less all the track built on board number one.  The track building team have started moving stuff off site and the weathering gang have arrived ready to perform their magic once the the electricians do their job.

 

Paul

DF907B83-0520-4AA7-BD42-8FDAE26F38C5.jpeg

AAC35BFE-E50F-403B-AC18-DC5FF7AFB259.jpeg

E1E09C24-EDE9-4C1B-93A5-3B5D09E0B99E.jpeg

AA94A275-22D6-4111-908C-C0EA0CBA000A.jpeg

  • Like 9
Link to post
Share on other sites

  • RMweb Gold

An hour today has seen the down line all wired up and it works perfectly with D1958 having the pleasure to be the first loco to run under its own power, up line next then I’ll install the Cobalts.

 

Paul

 

E44241B9-611A-4EC6-98EC-585C65936418.jpeg

  • Like 7
Link to post
Share on other sites

  • RMweb Gold

Wiring gang have been working late into the nigh and the up line is nearly all wired up but not without a few injuries.  I little advice to anyone without a pair of wire strippers, buy some as using a craft knife to remove the insulation is not clever, being a tight @ss results in blood loss!!

 

Paul

 

B37DA613-FCCC-4D25-9886-241796792544.jpeg

E5617513-395F-4E47-B80C-A581758B06D8.jpeg

  • Like 4
  • Friendly/supportive 3
Link to post
Share on other sites

  • RMweb Gold
23 minutes ago, Enterprisingwestern said:

 

You're going backwards in the wiring department, MK1 didn't come in a blood spattered state!!

 

Mike.

It was scrubbed and sterilised before being exported!  I also had some wire strippers back in those days 🙄 I’ve ordered some new ones though, three times I stabbed myself 😂

 

Paul

  • Friendly/supportive 2
Link to post
Share on other sites

  • RMweb Gold

Had a couple of hours before work so the last of the droppers have been soldered onto the rails and both the up and down lines are fully wired up, just need to install the Cobalt point motors which in hoping I can get done over the next couple of days.

 

Here’s D1958 testing out the track work, pretty pleased considering the frogs aren’t wired up yet hence the jittery running over some of the frogs.

 

Paul
https://youtu.be/wCuuthBhoiw

  • Like 1
  • Round of applause 1
Link to post
Share on other sites

  • RMweb Gold
21 minutes ago, PjKing1 said:

Had a couple of hours before work so the last of the droppers have been soldered onto the rails and both the up and down lines are fully wired up, just need to install the Cobalt point motors which in hoping I can get done over the next couple of days.

 

Here’s D1958 testing out the track work, pretty pleased considering the frogs aren’t wired up yet hence the jittery running over some of the frogs.

 

Paul
https://youtu.be/wCuuthBhoiw


Thats all looking great Paul! 

  • Thanks 1
Link to post
Share on other sites

  • RMweb Gold
10 minutes ago, Phil Bullock said:


Thats all looking great Paul! 

Thanks Phil, I think I need to tweak the odd rail on one of the points but that’s one good thing about hand built track you can remove and alter bits without affecting to much else.  I’ve also been acquiring a few wagons to I might actually have a full length train to show off soon 🤗 

 

Paul

  • Like 2
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...