Jump to content
 

Steve Hewitt

RMweb Gold
  • Posts

    1,483
  • Joined

  • Last visited

  • Days Won

    2

Posts posted by Steve Hewitt

  1. Another bracket for Walton-on-the-Hill.............

     

    This is another unusual signal having two dolls, four arms, but they are all miniautes.

     

    223289637_PartBoxdiagram.jpg.015654e5bad4f07e2edbfbf339d2210c.jpg

    This is the track diagram, signals 18, 19, 20 & 21 are controlling accress to two roads from two parallel tracks.

     

    532347148_walton6crop.jpg.c1d033feb637e5ba0d37a976265cbb78.jpg

    The prototype.

     

    The model

    P1040585.JPG.6fdac82eabf253334e69b7d74865a4a6.JPG

     

    P1040589.JPG.cf125c1dba37daf00c2ee9d17c83f6b1.JPG

    LMS Round Post with a No 5 bracket.

    Rocker shafts again for the right hand doll.

     

    P1040590.JPG.3af0fa3068563123657452c1d89832aa.JPG

     

    P1040591.JPG.bbd6f431733f8cbb4bb394967f135a4f.JPG

     

    P1040595.JPG.cdc3c63c904e93c48449df662da6e1f5.JPG

     

    A little video to follow, then its on to three LMS Ground Discs.

     

    Steve.

    The back lights are just about visible.

    • Like 11
    • Agree 1
    • Craftsmanship/clever 6
  2. Just an observation from exhibiting Lime Street Station:

     

    The baseboards are many years old, but quite substantial (heavy).

    Great care is taken getting the height of the boards correct, using a rotating lazer, during erection.

    The boards are located by dowels, and after assembly they do NOT need eyeballing. The stock just runs.

     

    Track across baseboard joints, Lime street has many which are extremely shallow angles, several inches long in cases.

    Chris Hewitt who built the track many years ago added "check rails" to the rails opposite a baseboard joint.

    They do not give any problems.

     

    355743963_Bareboards.jpg.b7e59730c32416ae3afa93e94156de44.jpg

    You can just make out some of the baseboard joints.

    DSC05040.JPG.410a5e57fab1795025f6a159d0351d19.JPG

    A shot taken during "chairing" the track. The base board edge protector shows how shallow the crossing is on the two tracks leading off the the left. You can just see the check rail at the very bottom of the picture.

     

    Hope this helps.

     

    Steve.

     

    • Like 5
    • Informative/Useful 2
  3. 2 hours ago, Warren Rails said:

    Hi Steve,

     

    Would you be ok with us sharing this to our Facebook page?

     

    Kind Regards

    Warren

    Rails Of Sheffield

    Hi Warren,

    Yes, please feel free to publicise this.

    Thanks, Steve.

    • Like 1
  4. Another, (final?) signal for Acton Wells.............

     

    This is another starter signal with a Route Indicator, but requires a very long laft hand bracket. This is because the signal wil be mounted on the platform, but applies to the second track out. Originally expected to be a Gantry signal, there is no space on the model to accomodate the left hand post, so it has to be a Bracket.

    RIMG0622.JPG.9bd287620f62e15c293f65183d6a8b19.JPG

    The Route Indicator "Flags" are operated by long centrally pivotted levers, with the interlocking assumed to be in a pit below the platform!

    RIMG0630.JPG.b6d5b211460b762f9efe69a8eb2a13c6.JPG

     

    RIMG0631.JPG.6634832f533c2e7310868eec41ff43a4.JPG

     

    RIMG0632.JPG.10ef5ff5da6033763ba0a38699bc7b92.JPG

     

    RIMG0633.JPG.3fc81432c5c9ea80151d4d079c79c0df.JPG

    The arm is controlled by Down Rod and a couple of cranks.

    RIMG0634.JPG.4c76ca05eddcd0660490c9845fd9ac2b.JPG

     

    RIMG0637.JPG.29041f632a76dfd1f6e31722d9554647.JPG

     

    Five servos are used: 

    RIMG0635.JPG.9a485ae7f35898de0a36656347772b2c.JPG

    One for each Route Flag and one for the Arm.

    The usual LED and Optical Fibre lighting is used.

     

    RIMG0642.JPG.d2fa320c3280748f4e1b37c0a13b7500.JPG

     

    Finally a short video:

     

    A few non-operating Ground Discs are to follow......

     

    Steve.

     

     

    • Like 7
    • Interesting/Thought-provoking 1
    • Craftsmanship/clever 6
  5. The short answer is "YES".

     

    I usually paint everything with car primer WHITE from a Rattle Can.

    For a simple signal that will be all the static parts.

    Careful masking will then be followed by a coat of Black from a rattle can.

    I usually prepare a batch of arms as a separate exercise, finishing them with either water slide transfers or brush painting with enamel or acrylic. 

    Spectacles are the glazing from MSE, fixed with Canopy Glue or Clear Fix.

    If the dolls have been painted separately they are installed now.

    After painting, the first assembly task is the fibre optics for the lights.

    All the moving parts are next, these having been painted or blackened in advance.

    The final "above ground" assembly task is usually the back blinder(s).

    The servo mount is then made up from plywood and installed on the Transport & Test Frame. The connection of the operating wires to the servos is done with the servos in "Mid-Throw" and the arms positioned accordingly.

     

    Hope this helps,

    Steve.

    • Like 2
    • Thanks 1
    • Informative/Useful 5
  6. Come along and meet us.........

     

    This coming weekend, March 5/6th, Les Green, John Holden and myself will be demonstrating at the Preston show.

    Not sure what the others will have on their tables, but I'll have the Route Indicator and other signals on my table if you want to examine them or discuss them in detail.

    Any of us will be pleased to talk to you about Liverpool Lime Street or anything else to do with our modelling.

     

    Please make your self known.

     

    See you there.....

     

    Steve.

    • Like 5
×
×
  • Create New...