LNERGE
-
Posts
3,611 -
Joined
-
Last visited
Content Type
Profiles
Forums
Blogs
Gallery
Events
Exhibition Layout Details
Store
Status Updates posted by LNERGE
-
Yesterday i bemoaned the lack of ballast under my feet. Thank you lineside flailing contractor. A cable to joint a bit into now.
-
'And our next display aircraft is the Boeing KC135 Stratotanker' ,, ' and for those who blinked... Tough'..
-
'Modelling' 5 AHB crossings in two miles. Strike ins and strike out are causing a bit of brain ache
-
'Modelling' 5 AHB crossings in two miles. Strike ins and strike out are causing a bit of brain ache
-
'working from home' tomorrow. A day modelling methinks.
-
£66 for a family ticket for a train ride. We went and watched planes instead..
-
10 days off yay. What shall i do? Got point rodding to recover, a semaphore to plant and some general maintenance on a passing loop. Perfect break.
-
10 minutes outside playing 12 inch to the foot is enough.. back inside now doing 4mm
-
125 over a 20.. https://www.bbc.co.uk/news/uk-england-beds-bucks-herts-46357040
-
15 hours in A&E, 7 of them waiting for a bed. A neck injury caused by sleeping in an incorrect position. The cure seems to be 7 hours nodding in a hospital waiting area waiting for said bed.
-
331mw being generated by 'coal', most likely biomas in fact at Drax.
-
50 today. Ho hum. I dread to think what Wifey has planned.
-
a 2 car Derby lightweight arrived over xmas. Finally got it ready to run with decoders fitted etc and the model railway clear enough to run it on.
-
A certain annual event here today. Mrs LNERGE got me a Cravens, DCC fitted. Was expecting a power twin. Got DMBS/DTC Norwich based unit. Perfect!
-
A Deltic through Hitchin at 100 mph. Magnificent.
-
A dream in a box.. https://www.flickr.com/photos/32297024@N08/29514746127/ I have spent a lot of time over the years working towards restoring key token working to my railway. Tomorrow is D day. Circuit change starts at 06:30 and Principles Tester booked on from 09:30. If all goes to plan it will be key token working for the first time since 1969.
-
A dusting of snow in North Herts.
-
A few clicks on the mouse and i've drawn another circuit diagram. Step back and take a look. 72 six way 2ba link blocks required. They'll need at least 432 crimps to terminate the wires. Each wire has two ends. That's another 432 crimps @
-
A nice stroll just before dawn to see 6Z17 with a pair of 56's booked for 2200 tonnes. A white dot on a black screen but sounds ok.. https://www.flickr.com/photos/32297024@N08/37634322382/