The B Set project has gained a set of ABS battery boxes, but still requires new Vac gear and some of the Model Railway Developments square GWR buffers once they get some stock in.
Picked up a pair of GWR Collets (Bachmann break and Mainline) from Mr Easter, both of which will be getting improved underframe details and flush glazing (once parts become available!) One needs to be re lined and will be partially resprayed, while the Bachmann break needs the roof respraying to look closer to the Mainline one (much too glossy). Its a bit odd that the paint on the older release looks a lot better than the more recent one!A co
A couple of mainline locos which will be getting High Level chassis, Lots of detailing is going to be needed (in particular I need to source a casting for the back of the boiler thats visible from the cab in both locos. Not sure where to go for that...)
The Collett will be the first build, chosen because that was the only one High Level had in stock. But I still need to buy a set of Gibsons and some form of jig before I can build. That said in the mean time I am planing to build some of the sub assemblies that are separate (make con rods, break gear etc) Wheels and Jig will follow next month after pay day!
An open frame siphon, need to get some MJT 9ft American bogies for it and finish off the detail work for seperate pipes etc (and again give the break gear a working over. MJT were out of stock.
Bachmann 45xx with angled tanks, along with a drop in pack of Gibsons. Should be enough to get a loco working once I get a decoder in there, (fingers crossed its not a loco that requires a small one!)
Finally, a set of sprung W irons for my fruit d, and correct patten wheels for my horse box.
Thankfully that does leave a couple of tasks (fruit d, horse box and 45xx) that can be worked on now) Just need some free time to do it in!
- Read more...
- 5 comments
- 476 views