-
Posts
12,348 -
Joined
-
Last visited
-
Days Won
30
Content Type
Profiles
Forums
Blogs
Gallery
Events
Exhibition Layout Details
Store
Status Updates posted by jamie92208
-
2 days work wiring the layout for the open day, 2 blown bridge rectifiers and at last the first loco moves under power though pointwork, controilled from the panel. 2 years 3 months since the first bit of track was laid.
-
5 days of chaos at Wakefield helping to put on the show now back to reality. I've got to spend a day tidying my modelling room so that I can see the desk and the floor.
-
Another dilema time. Do I typeset the Wakefield Show Guide or do I start assembleing all the lovely bits of laser cut plywood I've just picked up.?
-
Another dilema time. Do I typeset the Wakefield Show Guide or do I start assembleing all the lovely bits of laser cut plywood I've just picked up.?
-
Can I teach Minnie the cat to be a better typist when she walks across the keyboard. Shes's managed to shut the computer down once and objected to me reading a thread and not paying her attention, or possibly getting her her tea.
- Show previous comments 1 more
-
This is when to start worrying: http://kittybloger.files.wordpress.com/2012/05/cats-love-computers-6.jpg
-
Can I teach Minnie the cat to be a better typist when she walks across the keyboard. Shes's managed to shut the computer down once and objected to me reading a thread and not paying her attention, or possibly getting her her tea.
-
Cats fed, Dishwasher emptied, Ironing done, wife in France, off to the club for a day of layout wiring. Sounds like a good plan to me.
-
Decision time, day out on the train cancelled due to weather, do i do some modelling or try and tidy the modelling room?
-
Decision time, day out on the train cancelled due to weather, do i do some modelling or try and tidy the modelling room?
-
Decision time. Do I stay playing on the computer or do some tidying in the modelling room to try and find a workbench or floor.
-
Decision time. Do I stay playing on the computer or do some tidying in the modelling room to try and find a workbench or floor.
-
Decision time. Fathers days duties out of the way, till the kids arrive. Do I a) spend several hours tidying my modelling room or b) cler a little space and do some modelling?
-
Decisions, decisions, what to do thios evening. 1. Sit on the sofa nad suffer Strictly and the X factor, 2, start the 3rd book in the Steig larsson trilogy or 3, finally take the plunge and start soldering the platform awning supports into a structure.
-
Decisons to make, do I listen to the test match or watch the Tour de France.
-
Finally found the 3 lost Controllers I need for Green Ayre after 4 months of searching. I'd left the box at church last time I put the layout up.
-
First New Year resolution broken. Got bored with wiring control panels so started a new loco kit and enjoyed it.
-
First New Year resolution broken. Got bored with wiring control panels so started a new loco kit. Enjoyed it.
-
First New Year resolution broken. Got bored with wiring control panels so started a new loco kit. Enjoyed it.
-
Having spent 2 days tidying the modelling room I've found all sorts, a piece of flooring, 2 axlebox covers and several useful photos. Trouble is I've not got any modelling done.
-
Hi, I'm the exhibitionmmanager at Wakefield and we desperately need a container crane for our new club layout which is based on Stourton container terminal. Could we buy nit please. We are happy to pay the asking price. As we don't have good internet access at the show can you get back to me on my other email address of james.guest2@ntlworld.com or phone 07855053451. Jamie
-
I'd be glad to buy these paul, having been to LA last year and having a long term interest in things US as well as Midland. I hope that they are still available.