Jump to content
 

McRuss

RMweb Gold
  • Posts

    760
  • Joined

  • Last visited

Everything posted by McRuss

  1. Today I get the confirmation that I could attend next years Irivine show of the Kilmarnock & District Model Railway Club. It would be great to go to Irvine for the show. Markus
  2. In July I will held an module meeting with some friends. There will be a british arrangement with modern diesel traction and a heritage train. And there will be a continental modular arrangement with a harbour railway related theme. Here I show you the british modul arrangement. On the top will be Penzance station, then there will bei the stations Borve (Junction station) and Uig (terminus). There will be the halts Earlish (after the fiddle yard) and Romesdale (between Borve and Uig) and we will have a MPD between Borve and Penzance. The continental arrangement will follow. Markus
  3. McRuss

    Welcome to Meanach

    Your picture looks great, please show us more. What season did you model? Markus
  4. Hello Russ, I can't wait to see you progress on your planned layout. Markus
  5. Maybe you could use some strips of phosphorus bronze to made some pickups. Markus
  6. George, the girders looks good. Markus
  7. Tom, your woodwork progress looks good. Markus
  8. Hello George, I hope you will made some good progress. Markus
  9. McRuss

    It begins

    Good to see, that you could begin with your baseboard. Markus
  10. Hello Stephen, I too use the Rusty Rail paints, I tried the applicator but I'm not convinced of it. So I applied the paint with a brush. Markus
  11. Hello Simon, good looking progress. By the way, I don't know if it was mentioned earlier. What did you use for your brick- and stonework? Markus
  12. Hello, I wish everyone of you a happy new year. And here is a german classic for the end of the year http://www.youtube.com/watch?v=eUbEVg5KNt8&feature=related Markus
  13. I wish everyone of you a merry Christmas and a happy new year. I hope your wishes come true. Markus
  14. It's looks amazing. I can't wait to see it finished. Markus
  15. McRuss

    Dry Run

    These pictures looks very good, and I can't wait to see the progress. Markus
  16. Last weekend I held the second operating session on my Isle of Skye modules. Here are some pictures and a movie. Uig Station master Working at Borve Carbost Fiddle Yard Romesdale Men at work Markus
  17. McRuss

    What to do next

    Why not building an G gauge indoor shuntinglayout in the place of the N gauge layout. Here you could use your build locos and stock, when the weather in the outside is horrible. If you build the layout modular, you could, if you want take it to exhibitions. Maybe build something that did something with your wagons, e.g. a working tippler, or a working wagon turntable. with working capstans. Markus
  18. George, the IoS could be seen in two weeks in Potsdam from 8th until 10th October. Here is the link. http://www.whkb.de/ And the next termin is from 13th to 14th November in Frankfurt Griesheim http://www.mcg83.de Markus
  19. George, in which scale did you built your layout? Markus
  20. Hello George, your pictures are great. Please show us more. Markus
  21. Hello Stephen, the Atlas Code 55 Track is intented for the use with american rolling stock, which got RP25 wheels. I made the same mistake on my first british layout, where I wanted to use Atlas code 55 track. My entire locos stalled at the turnouts. (Dapol 14xx, GraFar 3F and 4F. The Peco and Farish Wagons run well on the Flextrack, but have some problems on the turnouts, The Dapol wagons hit the ties, when running. When you are using british/continental rolling stock, it is better to use Peco Code 55 tracks. Markus
  22. Hello, a new issue of my IoS Railway Gazette is online from today. http://www.ios-railway.de/iosgazette.html Markus
  23. Hello Richard, thank you for your reply. Usually the layout is smaller, but for my operating session in three weeks I built up Borve. When I'm operating the layout alone, or when I havn't enough operators at the session, the Borve is dismanteld, and the the layout only gets to the module with the roadoverbridge, and after that module, would be the fiddle yard. Markus
×
×
  • Create New...