"On Saturday June 18th, 2016 SSR trialled a 100 wagon coal train with distributed motive power. The consist ran as 2 x CEY’s, 50 PHTH, 3 x CEY’s, 50 PHTH, 2 x CEY’s, and departed Lithgow for Airly at 08.30. Total length was 1769 metres with a loaded weight of 10000 tonnes."