  1. AND the wiring for the new signal and switch.
  2. Wiring of extension completed.
  3. Scenery has commenced on the extension board, wiring in plac, the river has been made, embankments are next.
  4. Final woodwork and tracklaying completed on new extension board, also built two fiddle yards today for Fenchurch St Peter.
  5. I completed a pre-order form at Warley with LTM, now I don't know if this has been accepted as I have no receipt or proof.........
  6. Yep, same here. I have already got the GBRF model and a cracker it is, it is complete with all parts attached.
  7. He is nearly back to full grumpiness Chris, thanks for asking.
  8. Only 2 wires needed for DCC?............................ Not sure where we are going wrong! A couple of photos of a Bachmann 24
  9. Actually, I don't know why it is in the photo, we never used it!
  10. With Towcester appearing at Milton Keynes in February in its extended form, it was about time we built the new baseboard which will include the River Tove. So work has commenced today.
  11. Apart from that Andy loves it
  12. Oh look we have reached halfway to 156 posts................
  13. As George has said, nearly there. A few photos of the Station house being constructed and a snapshot of the area of East Anglia we were trying to recreate.
  14. Just to let you know that Towcester will be at Warley Show (NEC) this weekend, pop by and say hello.............
  15. Work progresses, track on last scenic board ballasted, foliage added and goods shed almost completed ( roof needs painting ) Yes the windows are supposed to look broken........
  16. Goods shed at painting stage, before I add roof, glazing, doors, gutters etc. Now off on my annual all line 1st class rover, so hopefully we are on schedule to finish the layout for the planned visit of a well known model railway magazine in November....
  17. Track tested today and no short circuits ( hooray ) Some foliage added to the new board. Now final ballasting can take place. Track tested today and no short circuits ( hooray ) Some foliage added to the new board. Now final ballasting can take place.
  18. The last of the scenic boards are coming along, George has made a great job, just some ballasting, foliage and small details to be added. Wiring is nearly completed on the signals and points.
  19. Parcel arrived and unwrapped, No 2 of 300..........Nice
  20. With the layout due to be photographed in October by a well known model railway magazine, it is time to stop lazing around in holiday season and get back to working on the layout. Along with George's jobs I still have to make a control panel, build another scenic board and construct the station building, good shed and pub ( not a lot to do then!!) Anyway a start was made over the weekend and the panel was constructed.
  21. Just a short post to say thank you for the exceptional service from Railtec. Order placed yesterday, email confirmations of order received and then dispatched. Order has just come through my letterbox. Thank you Steve for the great service.
  22. Got the email too...............gutted, I'm away on other family duties that weekend
  23. A few photos to show the latest status of the new layout. George is still waiting for me to build the control panel, station building, pub and goods shed!
×
×