Jump to content
 

Hugh Flynn

Members
  • Posts

    1,059
  • Joined

  • Last visited

Everything posted by Hugh Flynn

  1. Hi Just got to say well done to Alex .Paul and the team for a great show. Looking forward to next years. Hugh
  2. Hi What we can see on drawing it looks to be a vent,I use these now and again on storage tanks but I would guess it was a motherwell bridge made item/ https://www.google.co.uk/search?q=fort+vale+uk&espv=2&biw=1366&bih=638&source=lnms&tbm=isch&sa=X&ved=0ahUKEwi40KDQhInSAhWlF8AKHQZNCg8Q_AUICCgD#imgrc=ryRSvY4O7ticTM: Hugh
  3. Hi Mr oxford if you can how about a West Yorkshire ambulance - https://www.flickr.com/photos/mjjtlee/975975564 https://www.flickr.com/photos/phil-hamilton/8204825363/in/photolist-dv2SJg-dv2Sxz-dv8sPw-7BR5ap-oamqXr-mPjcUC-77gVAy-bHJrDi-7DxRZ1-fGmPD8-cdg2mj-bVTFBa-dv2SuX-5ziDK7-7UDstB-cdg3Yf-k85ke2-dv2SDP-735g9R-6Grry2-buPE5d-iMGQZm-53tqU2-zK1xjE-oaz2pj-bcHahV-53tra4-bcHaGP-aWj25n-bF5mNb-fdWP7S-ei94V3-bVTGgz-9fBTKM-6GrCgv-fdWPiY-E7fQdf-6CvZ8D-4fxNZh-5qFyLV-6CAz2E-6CAwJL-6Grx8K-6CA82U-6GrCGF-i9wXz7-ct9JvW-6CAyyL-r9dCny-95GMZQ https://www.flickr.com/photos/phil-hamilton/8204824591/in/photolist-dv2SuX-7BR5ap-5ziDK7-7UDstB-oamqXr-cdg3Yf-k85ke2-mPjcUC-dv2SDP-735g9R-77gVAy-bHJrDi-6Grry2-bF5mNb-fdWP7S-ei94V3-buPE5d-bVTGgz-9fBTKM-iMGQZm-53tqU2-zK1xjE-6GrCgv-oaz2pj-bcHahV-fdWPiY-E7fQdf-6CvZ8D-53tra4-bcHaGP-4fxNZh-5qFyLV-6CAz2E-6CAwJL-6Grx8K-6CA82U-aWj25n-6GrCGF-6CwmkR-bddC3r-ahDvPz-i9wXz7-6CwoBF-6CdUR9-ct9JvW-6CAwew-6CAyyL-r9dCny-6Gx38h-6CAvDA Thanks Hugh
  4. Hi Now Hattons say October to December 17 Hugh
  5. Hi Richard I should have finished cads by the end of next week (only decals to finish) then I have to obtain quotes for tooling I have had one provisional but I do need to check on a couple of other suppliers. Biggest thing being honest ,I still have a few more SPA network rail to shift before I can place final order ,I do have all tooling costs available. Hugh
  6. Hi Nick Great to see the layout in the flesh today looked great well done - .And enjoy Scotland. Hugh
  7. Hi Peter I could no way match Dapol even I am waiting for HEA,s to come out at that price? Even 3D printing on any 7mm wagon would be expensive for Cavalex or Myself.(could end up a lot of hassle for very little return) Hugh
  8. Hi Cav I looked at doing SPA in 7mm but it worked out 400-450 sales before I would get a return on investment. I was never sure I could sell that many but now with class 08 and 03/05 on there way it might be worth thinking about one day? Hugh
  9. Hi Tower also say early 2017 but as you say it is quiet as I fancy a small train of HEA,s Hugh
  10. Hi Sorry no it would not be viable - 1200 models divide by 5 wagons done per bag is 240 bags times £4 a bag = £1000 just for couplings? Their is no problem regards to coupling it is we are trying to give better detail on braking system and coupling is in the way? Hugh
  11. Hi Just really like this shot in the good old days. Hugh https://www.google.co.uk/search?q=cameron+bridge+station&espv=2&biw=1366&bih=638&source=lnms&tbm=isch&sa=X&ved=0ahUKEwiSnOzVhOTQAhVrDsAKHXiKDuUQ_AUICCgD#imgrc=wDc_BM4nPTgNLM%3A And a good web site for pictures. https://www.railscot.co.uk/slideshow/slideshow.php?coy=Leven%20Railway
  12. Hi Mike I am looking at it but it all depends on cost of tooing and extra cost for cad drawing. Hugh
  13. Hi Its probably the way I have cropped photo it is parallel. Hugh
  14. Hi A couple of photos with decals, We still have a few things to sort on coupling but again if you see anything speak up. My cad designer is having an operation on the 15/11/16 and will be out of action for a while? Hugh
  15. Hi I will look into the wagon to see if I can do anything , At the moment I need to sell more NR wagons to pay for the wagon unit cost I have the tooling cost but I do have a couple of things on my mind? Hugh
  16. Hi The cad designer was given NEM details but somehow ended up with it wrong ,I actually blamed the manufacturer of the tooling as we had it drawn in one program and they were using an old out of date program and I had then to pay extra to have it all re-wrote to the one they were using. I in my other topic i put my hands up to length of coupling that was my fault as I was only sent one wagon and it ran ok with other manufacturer wagons. Hugh
  17. Hi The NR wagons are Nem standard. Hugh
  18. Hi Coming along , keep up the good work. Hugh
  19. Hi The coupling hook is something I noticed for sorting as they both look different. I also need to check height from cad drawing. Hugh
  20. Hi Yes the coupling was modified on NR SPA to 1.5mm front of coupling to buffers but checking with Cav what he has set up to on his new wagon. Hugh
  21. Hi We are at the moment finishing all the decals/brake pipe so hope to have more Cad drawings next week. Hugh
  22. Hi I have a couple off cad drawings to show how the wagon is coming along. I have taken on a wagon that none were preserved and working from old drawings/photo,s and a friend who is into wagons. Again if you see anything we are not to late to amend. Hugh
×
×
  • Create New...